Policy SD7

Minimising and Managing Flood Risk

On pages 294 to 299 of the official PDF.

The human version

This policy sets out how development must manage flood risk. Proposals must apply a sequential approach, not increase flood risk, leave an undeveloped setback from watercourses, and stay safe and operational in a flood. A site-specific Flood Risk Assessment is required in Flood Zones 2, 3a and 3b, for all major development in Flood Zone 1, and elsewhere where other flood sources may affect a site. Schemes passing the Sequential and Exception Tests must put vulnerable uses in the lowest risk areas, avoid net loss of flood storage and include safe access and egress. A Flood Emergency Response Plan is required where appropriate.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 294

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

SD7 Minimising and Managing Flood Risk Strategic Objectives H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Strategic Policy A In those circumstances where it is necessary to minimise and manage flood risk proposals for development must: i. Apply a sequential approach to the location of new development to avoid flood risk to the population and property whilst taking account of the long- term impact of climate change; ii. Not increase flood risk and reduce the risk of flooding from all sources; iii. Make space for water by providing an undeveloped setback from rivers and other watercourses; iv. Where appropriate, carry out a condition survey of flood defence and other watercourse infrastructure and if necessary, provide for maintenance, repairs or remediation to secure its functional integrity over the lifetime of the development; and v. Be designed to remain safe and operational under flood conditions. B A site-specific Flood Risk Assessment (FRA) will be required for all relevant development proposals within Flood Zone 2, 3a and 3b, all major development in Flood Zone 1, and elsewhere in the Borough where development may be at risk of other sources of flooding. The FRA must provide sufficient information for the Council to assess whether the requirements of the Sequential and Exception Tests have been satisfied. In circumstances where it is required the FRA must: i. Be proportionate with the degree of flood risk posed both to and by the development; ii. Take account of all potential sources of flooding both on and off-site; iii. Make an appropriate allowance for the hazard posed by climate change over the lifetime of the development; and iv. Have regard to the recommendations of the latest Hertsmere SFRA and Local Flood Risk Management Strategy. C Where development proposals are required to satisfy the Sequential and Exception Tests, they must be designed to ensure that: i. The most vulnerable land uses are directed to areas of the site that are at lowest risk of flooding; ii. There is no net loss of flood storage capacity and adequate provision is made for flood storage and compensation, with priority given to on-site provision; iii. There is no detrimental impact on the natural function of the floodplain and floodwater flow routes across the site; and iv. Appropriate mitigation measures are incorporated to address any residual flood risk, including safe access and egress for all likely users of the development. D Development proposals must provide a site-specific Flood Emergency Response Plan to manage actual and/or residual flood risk, where appropriate. Figure 11.1: Hertsmere Flood Zones and Critical Drainage Explanation 11.47 Hertsmere’s most significant main rivers are the River Colne and Mimmshall Brook. The River Colne has the widest floodplain, with the watercourse forming the boundary between Watford and Bushey in the east. The Mimmshall Brook flows through a largely rural part of the Borough and is subsequently not a major flood risk to people and property. 11.48 Other noteworthy watercourses include the Radlett Brook, otherwise known as Tykes Water, which runs through the centre of Radlett. Its course is largely protected by a flood storage area at the upstream end of the town. The most recent Strategic Flood Risk Assessment (Level 2 June 2026), notes that the Environment Agency dataset Recorded Flood Outlines2 notes that fluvial flooding has also been recorded along the Tyke’s Water in Radlett. 11.49 Elsewhere there are localised areas across Hertsmere that are at potential risk from other sources of flooding including through surface water run-off, ground water flooding, surcharge from the sewer network and the blockage of culverts and gullies. 11.50 New development must not increase flood risk to people and properties. Development proposals should proactively seek to minimise and mitigate flood risk by considering risk from all sources using appropriate and up-to-date information. Early engagement with relevant stakeholders, including the Hertfordshire County Council as Lead Local Flood Authority, the Environment Agency (EA), Thames Water Utilities and Affinity Water is strongly advised. 11.51 The Council regularly reviews the Hertsmere Strategic Flood Risk Assessment (SFRA), they are intended to be living documents which are kept up to date as information on flood risk management changes. The purpose of the Level 1 SFRA (2023) is to collate and analyse the most up to date readily available flood risk information for all sources of flooding and provide an overview of flood risk issues across the Borough. The Level 1 SFRA considers the risk of flooding now and in the future because of climate change. It maps the Borough into flood zones according to the probability of flooding occurring, discounting the presence of any flood defences and alleviation measures. 11.52 Flood Zone 3b is the functional floodplain, where water must flow or be stored in times of flood. Applicants should consult the Environment Agency (EA) for site specific flood model outputs to better understand flood risk, and to establish whether the flood zones in the SFRA have been updated. 11.53 In line with national planning policy a sequential approach must be used to ensure that new development is directed to those areas of the Borough, and locations within sites, that are at the lowest risk of flooding. We will consider the appropriateness of development having regard to the Sequential and Exception Tests, and FRAs 2 Environment Agency Recorded Flood Outlines https://www.data.gov.uk/dataset/16e32c53 -35a6- 4d54-a111-ca09031eaaaf/recorded-flood-outlines (Accessed August 2025) submitted by applicants. FRAs must consider the long-term hazard posed by climate change. The latest standing advice on climate change allowances published by the EA should be referred and form the basis of assessments. 11.54 The Council has also prepared and published a Level 2 SFRA (June 2026). That document considers the detailed nature of the flood characteristics within a flood zone including, where possible flood probability; flood depth; flood velocity; rate of onset of flooding; and duration of flood. This enables users to apply the Sequential Test by identifying the severity and variation in risk within medium and high flood risk areas for all sources of flood risk; establish whether proposed site allocations or windfall sites, on which the emerging Local Plan will rely, are capable of being made safe throughout their lifetime without increasing flood risk elsewhere; and begin to consider the application of the Exception Test, where it is relevant. 11.55 National planning policy states that the Exception Test may be satisfied where development provides wider sustainability benefits to the community that outweigh flood risk. This will be considered on a case-by-case basis however all such development must be demonstrably necessary to support the delivery of the spatial strategy, for example, community or other types of infrastructure. 11.56 As part of the plan-making process the Council has undertaken a Sequential Test to assist in the site allocation selection process. Allocated sites that have passed the Sequential Test will not need to apply this test again, unless the proposed use is not consistent with the site allocation. 11.57 Where the Sequential and Exception Tests are satisfied development proposals must fully investigate opportunities to avoid, reduce, manage and mitigate flood risk through site layout and development design. This includes appropriate measures to ensure development is safe. Proposals should fully assess and address residual risk, including through flood resistant design (e.g. to prevent water from entering the building and damaging its fabric) and resilient design (e.g. to ensure the building’s structural integrity is maintained and that drying and cleaning can be facilitated). 11.58 In circumstances where it is relevant and necessary proposals for development must be accompanied by a Flood Emergency Response Plan to ensure safe access and egress from actual and/or residual flooding, where appropriate. This measure is necessary to ensure that building occupiers can be made aware of the responses to various types and scale of flood threat, evacuation logistics, evacuation routes and other safety arrangements in terms of dry access, egress and refuge. Examples of such developments can include proposals with water compatible uses, alterations to existing buildings and building floor levels that have been raised, but where there is remaining flood risk under the 0.1% AEP event.
Flooding & waterInfrastructure & utilitiesSite allocations📍 Bushey📍 Radlett📍 Watford
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.