The human version (we wrote this, not the council)
This section sets out how the Local Plan will be monitored. It says monitoring is central to making sure the plan delivers, and that neighbouring plans must also be monitored. Table 9 lists each policy with indicators and targets. Examples include a minimum of 9,598 dwellings delivered to 2033, a minimum of 100 hectares of employment land to 2033, 60 windfall dwellings a year from 2020 to 2033, and housing density of no less than 30 dwellings per hectare. The table also covers Green Belt and Strategic Gap loss, affordable housing, traveller sites and reserve housing sites. A list of appendices A to Q follows.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
15.1 Monitoring of the Local Plan is a central component of ensuring that the Plan delivers.
Equally as important is the monitoring of neighbouring plans to ensure that they are
delivering their required developments.
Table 9: Monitoring Information for individual policies
Policy Title Indicator/ metrics Target
LP1 Sustainable
Development
Achievement of all
indicators in the Local Plan
which contribute towards
LP1
i. All monitoring targets met or
exceeded
ii. Development supported by required
infrastructure with reference to IDP
and NWBC26 Appendix A
LP2 Settlement
Hierarchy
Achievement of all
indicators in the Local Plan
which contribute towards
LP2
i. Development enabled
proportionately in line with
settlement hierarchy, including
associated services, facilities and
infrastructure,
ii. All development outside of defined
settlements justified and
appropriate.
LP3 Green Belt Change to extent/ character
of Green Belt
Area defined as Green Belt
in hectares/ square metres
lost to inappropriate
development (including via
permissions/ community
right to build)
i. Protection of Green Belt’s essential
characteristics and purposes,
ii. Any inappropriate development
justified by very special
circumstances.
LP4 Strategic Gap Change to extent/ character
of Strategic Gap
Numerical loss of area
defined as Strategic Gap (in
hectares/ square metres)
i. Retaining a meaningful gap within
the terms of LP4
ii. Any exceptions to protection
accorded via LP4 justified.
LP5 Amount of
development
Amount of housing,
employment and traveller
provision coming forward
relative to minimum
requirements in line with
anticipated delivery rate
Employment land delivered
by Use Class and by
hectare and square metre.
Relative to the proportions
given in figure 2 of ELR
update (CD8/8)
iii. Minimum of 9,598 dwellings
delivered to 2033 in line with the
housing trajectory in Local Plan
appendix B,
iv. Minimum of 100 hectares of
employment land delivered to 2033
in line with the employment land
trajectory in Local Plan appendix B,
v. 19 permanent residential
vi. Needs for travellers and travelling
showpeople met with regard to
latest evidence/ monitoring for
policy LP10
vii. Provision of adequate infrastructure
to support development
requirements,
viii. Maintenance of a five year supply
of deliverable housing sites.
LP6 Additional
employment
land
Amount of employment land
provision delivered by Use
Class and by hectare and
square metre relative to
evidence of immediate
unmet need within Area A
as defined in the West
Midlands Strategic
Employment Sites Study
(September 2015) or
subsequent iteration or
similar strategic study.
i. Report trend
LP7 Housing
development
Provision of housing relative
to needs and preferences,
including tenures, of the
population and at an
appropriate density (Local
Plan appendix C sets out
relevant studies)
i. Increased availability of homes to
meet the needs of the following
groups:
- older people
- younger people/ starter homes
- people with disabilities
- special needs housing (including
sheltered or care
accommodation and communal
establishments)
- custom/ self-build housing
ii. Housing density provided at no less
than 30 dwellings per hectare
relative to the developable area of
any site
LP8 Windfall
Allowance
Level of development (links
with monitoring of LP2 and
LP5)
i. 60 dwellings a year from 2020 to
2033 arising via windfall (i.e.
unplanned provision)
LP9 Affordable
Housing
Provision
Amount of affordable
housing provision
i. Affordable houses delivered () by
type and tenure to meet target
provision and mix in policy LP9,
ii. Appropriate contributions towards
off-site affordable housing provision
meeting requirements in LP9.
LP10 Gypsy &
Travellers Sites
Amount of provision (links
with LP5)
Number of applications for
traveller sites (as defined in
PPTS or successor
document), number of
unauthorised or illegal sites,
caravan count data,
evidence in the forthcoming
review of traveller needs
with Lichfield and Tamworth
Councils
i. Pitch provision to meet needs
established via policy LP5 in
accordance with the locational and
other requirements of policy LP10,
ii. No net loss of traveller site
provision (unless acceptable
replacement or no longer required
for any identified needs as reflected
in the latest GTAA).
LP10a Boat Dweller Provision of residential i. Report trends
Accommodation moorings
LP40 Houses in
Multiple
Occupation
i. Report trends
LP11 Economic
Regeneration
Employment generation and
diversification (links with
LP12 and LP13)
i. Increased and broadened/
diversified employment provision
relative to the objectives in LP11
ii. Existing provision safeguarded
unless loss is justified.
LP12 Employment
Areas
Existing employment base
maintained (links with LP11
and LP13)
Employment land change by
Use Class and by hectare
and square metre
i. Report trend
LP13 Rural
Employment
Farm and rural business
growth and diversification,
including number of
proposals for re-use of
existing buildings (links with
LP11 and LP12)
i. Report trends
LP41 Small Scale
Live/Work Rural
Employment
Opportunities
Provision of a scheme to
provide small scale
employment along with
residential accommodation
i. Delivery of scheme
LP14 Landscape Maintenance or
enhancement of landscape
character, including in
respect of protective
designations
i. Report trends
LP15 Historic
Environment
Conservation and
enhancement of the historic
environment and heritage
assets
Number of applications
approved contrary to advice
of English Heritage.
Number of applications
refused owing to impact on
historic environment.
i. Reduce number of assets on
Heritage at Risk Register
LP16 Natural
Environment
Protection and
enhancement of the natural
environment (links with
LP17)
Number of applications
approved contrary to advice
of Natural England.
Number of applications
i. Safeguard and improve/ enhance
habitats and biodiversity
ii. Any potential adverse effects
assessed, avoided, mitigated,
enhanced or compensated for in
line with LP16
refused owing to effects on
natural environment.
LP42 North
Warwickshire
Central
Tranquility
Area
Protecting the tranquility of
the central core of the
Borough
Report trends
LP17 Green
Infrastructure
Extent and quality of Green
Infrastructure assets and
biodiversity connectivity
(links with LP16)
i. No unjustified net loss of green
infrastructure provision relative to
the approach in the Green
Infrastructure Study (Appendix C)
ii. Increase in biodiversity
enhancements
LP18 Tame Valley
Wetlands NIA
including
Kingsbury
Water Park
Maintenance and
enhancement of Nature
Improvement Area
i. Report trends
LP43 River Anker
Access and
Nature
Nature and public access
project
Report on project delivery
LP19 Local Nature
Reserves
Protection or enhancement
of the natural environment
i. Report trends
LP20 Green Spaces Protection of locally valued
green spaces (links with
LP22)
i. No loss of Local Green Space
ii. Number of any unjustified losses
LP43 Biodiversity Net
Gain (BNG)
sites
Nature schemes i. Delivery of BNG sites
LP44 Mancetter
Quarry
Restoration
Opportunity
Nature and public access
project on a former quarry
site.
i. Project Plan for the project
ii. Delivery of Scheme
LP45 Wild Packington Nature project i. Delivery of project
LP21 Services and
facilities
Maintained or improved
vitality of town and
neighbourhood centres
Applications for change of
premises from retail and
main town centre uses to
others
Mix of Uses in defined town/
neighbourhood centres and
vacancy levels
Funding received for
provision of community/
public services and facilities
i. No unjustified loss of retail, town
centre uses or other facilities (with
reference to the aims of LP21)
ii. Report number of any unjustified
losses
iii. Appropriate contributions for
services and facilities secured from
development via planning
obligations
LP22 Recreation
Provision
Improved availability and
accessibility of recreation
i. Report trends on number, area and
facilities provided.
provision
Delivery and Compliance
with SPD Targets, facilities
and/or financial
contributions sought
iv. Monitor compliance with adopted
SPD
LP23 Transport
Assessments
Development is
accommodated within
design capacity of road
network as improved,
Effects on road network are
appropriate and linkages
made with cycle and
footpath networks where
possible.
Number of applications
refused on grounds of
highways effects/ against
the advice of Warwickshire
County Council or Highways
England.
i. No development approved with
unacceptable effects on highway
capacity or safety
ii. Report trends.
LP24 Stations Improved accessibility and
facilities
i. Report trends
LP25 Railway lines Protection of the strategic
route of HS2, safeguarding
of potential transport routes
and level crossings, and of
historic rail lines.
Support relocation of
existing lawful buildings,
structures or uses displaced
by HS2.
i. Allow for the creation and
integration of HS2 into the Borough
ii. Safeguard Baddesley Mineral
Railway Line, Whitacre Line from
development that would prevent
their reinstatement or use as a
continuous corridor.
iii. Successful relocation of lawful
buildings, structures or uses
displaced by HS2 where sought.
LP26 Strategic Road
Improvements
(to be finalised
pending HIF
outcome)
Enabling of improvements
necessary to the highway
network and cycling routes
in line with the STA and IDP
(see Local Plan Appendix C)
i. Implementation of STA and IDP
projects at the appropriate junction
in support of LP2 and development
provision, including completion of
Phase 1 and Phase 2 A5
improvements & submission of bids
for future phases of the A5
LP46 Lorry Park
Facilities and
Services
Provision of additional HGV
park with eh associated
facilities
i. Number of HGV spaces delivered
LP47 Contributions
for Highway
Improvements
Ensuring that key
infrastructure is provided as
part of the developments
i. Amount of contributions received
ii. Schemes delivered
LP27 Walking and
Cycling
Improving provision and
accessibility of walking and
cycling routes across the
Borough
i. Development of a walking and
cycling strategy by [date].
ii. All development to make
appropriate provision for such
provision, including connection with
existing routes.
LP28 Level crossings Improvements made where
affected by development or
alternative arrangements
proposed to ease traffic flow
i. Report trends.
LP29 Development
considerations
Ensuring high quality of
development in all respects
Number of applications
failing to comply with criteria
1 through 17.
i. Report trends.
LP30 Built Form Ensuring high quality of
development in all respects
Number of applications
failing to comply with criteria
1 through 17.
i. Report trends.
LP31 Frontages,
Signage and
External
Installations
Ensuring high quality of
shop-fronts and
advertisement (links with
LP21)
i. Report trends.
LP32 New
Agricultural,
Forestry and
Equestrian
Buildings
All additions/ new rural
buildings to be justified and
integrate appropriately with
character
i. Report trends
LP33 Water and Flood
Risk
Management
Ensure all new development
is appropriate in respect of
vulnerability to flooding and,
where appropriate,
improvements to existing
vulnerability flooding are
made
Number of applications
approved contrary to
Environment Agency advice
i. Report trends
LP34 Parking Adequate vehicle parking
provision made relative to
accessibility of location,
including in respect of lorry
parking
i. Report trends
ii. No net loss of lorry parking
provision without justification.
LP35 Renewable
energy and
energy
efficiency
Ensure all new development
meets national requirements
in respect of efficiency
i. Report trends
LP36 Information and
Communication
Technologies
Greater connectivity i. Improvements in extent of coverage
of mobile phone signal, broadband
and superfast broadband services
LP37 Housing
allocations
Amount of development and
timing of delivery (see entry
i. Report trends (see entry for LP5)
for LP5)
LP38 Reserve
Housing Sites
Contingency in the event
that delivery falls short of
trajectory in Local Plan
Appendix C, targets set in
respect of LP37 falter, if
enabling infrastructure is
required or if other specific
justification for early release.
N/A
LP39 Employment
allocations
Amount of development and
timing of delivery (see entry
for LP5)
i. Report trends (see entry for LP5)
Appendices
A Glossary
B Housing Trajectory
C Evidence Base
D Settlement Hierarchy
E List of Existing and Sites with Planning Permission Authorised for Gypsy
and Traveller Use
F Summary of Number of Completions from 1 April 2006 to 31 March 2016
split between Total & New Build (Gross)
G Transport Assessments
H Map showing the area of the Tame Valley Wetlands NIA
I Constraints Map
J Inset Maps for Settlement Site Allocations, Proposals, Development Boundaries and Designated policy areas
K List of Supplementary Planning Documents
L CPRE Tranquility Assessment Map England
M River Anker Access and Nature Project Area
N Mancetter Quarry Restoration Proposal Area
O Wild Packington Project Area
P H12 East of Coventry Canal and South of Merevale Road
Q Coleshill Manor Campus Redevelopment