← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / Chapter 3: Issues

From the plan

Chapter 3: Issues

On pages 12 to 14 of the official PDF.

The human version

This section sets out the main cross-cutting issues behind the plan. These include access to services and jobs, an ageing population, health problems and fuel costs. Flood risk is another issue, especially along the Rivers Tame, Anker, Blythe and Cole. About 2,130 veterans live in the Borough, around 4% of people aged 16 and over. The section links the plan to the council's Corporate Plan and stresses delivering infrastructure alongside growth. It lists seven qualities that make the Borough unique, including 11 Conservation Areas, over 600 listed buildings and monuments, dispersed settlements, its mining legacy, its transport links and its major employers.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 12

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

3.1 There are a number of cross cutting issues that have consistently been highlighted or raised throughout the development of this Plan. 3.2 Access is an important issue in respect of both the physical means of accessing services and facilities, as well as accessing education, employment, advice/health services, leisure and recreation and, housing provision and support. This issue is exacerbated by an increasing elderly population, higher than average adverse health issues, cross cutting the generations (obesity/smoking/drinking/infant death rates) and increased fuel costs impacting on fuel poverty and transport costs. These raise major implications and potential pressures for future service needs and how to address the form and location of their provision and how those who need those services can access them. 3.3 Flood risk is an issue in a number of locations within the Borough as identified in the Strategic Flood Risk Assessment, most notably along the River Tame, River Anker, River Blythe, River Cole and associated tributaries. The presence of formal flood defenses across North Warwickshire Borough is concentrated in the Coleshill Area where the River Tame, Cole, Blythe and Bourne converge. A number of locations have been identified by the Environment Agency and Warwickshire County Council where flood alleviation works may provide benefits to local communities. Future development needs to be located outside areas of greatest risk in line with the Sequential Approach outlined within the NPPF and PPG, with mitigation designed into all schemes to ensure they are safe from the effects of flooding, do not increase the risk of flooding elsewhere and reduce flood risk where possible. Flood risk should be considered for the lifetime of the development (considering the impact of climate change, guidance on which is available from the Environment Agency based on latest UKCP projections). 3.4 There are also strong links with the armed forces community, with approximately 2,130 veterans living in North Warwickshire, representing roughly 4% of the population aged 16 and over (2021 Census). This community faces a number of issues in terms of health, support services and housing, and the Borough recognises this and is actively involved as a signatory to the Armed Forces Covenant. 3.5 The North Warwickshire Corporate Plan recognises that partnership plays an important role in achieving the priorities of the Borough. The main priorities that are linked with the Local Plan concern prosperity and health (these include jobs, infrastructure, connectivity and health), safe, liveable and locally focused communities (these include feeling safe, place-based enforcement and quality of life) and finally, sustainable growth and protected rurality (these include vibrant growth, sense of place and recognisably home). 3.6 In terms of the Local Plan, the aim is to look at spatial linkages to these issues. For example, there are clear links between issues of poor health, obesity and open space/recreation provision, education and the skills gap, rural transport and isolation and where the opportunities and needs are for seeking planning gain or financial contributions from any proposed commercial/housing developments. 3.7 The Borough has, is and will continue to look for ways of tackling these issues. This will be through a range of opportunities including seeking external funding opportunities, and Section 106 contributions, as well as continuing to work with a range of partners from the public, private, and voluntary sectors. The Local Plan can assist in ensuring a lasting Chapter 3 Issues legacy from any development that takes place. Delivery of infrastructure 3.8 A further issue has also been identified, which is connected to the above but is much broader, and that is the delivery of all forms of infrastructure to ensure that developments work for both existing and future residents and businesses. The growth envisaged has brought this issue to the fore. This Plan seeks to ensure that the implications of growth within and outside the Borough are considered comprehensively and not in a piecemeal way. Working with partners and our neighbours will be key to ensuring that infrastructure is secured and delivered in an appropriate and timely manner alongside housing and employment growth. So, what makes North Warwickshire unique? 3.9 In conclusion the list below summarises the key qualities that make North Warwickshire unique: 1 Quality of its natural and historic environment. The Borough has a pleasant rural character distinct from its growing urban neighbours with a large number of natural and historic assets. There are 11 Conservation Areas, over 600 listed or Scheduled Monuments and buildings, and, many wildlife and geological sites of varying designations. 2 The Borough has a number of unique biodiversity habitats and species that are only or predominantly found in the Borough, such as heathland, River Blythe SSSI, Coleshill Bog, Bannerley Pool, Grizzled Skipper, Dingy Skipper and the Boody- Nose Beetle. 3 Dispersed settlements. There are over 50 settlements within the Borough, ranging from Market Towns to small hamlets, each with a different character. 4 Mix of architectural styles. Whilst there is no distinctive Borough-wide building style there are very local styles either in character or in form that leads to places being very different from one another. 5 Former mining legacy. The Borough had a number of mines leaving a legacy of land contamination and infrastructure issues. 6 The Borough has some unique transport issues. It has national road and rail routes going through the Borough - M6, M6 (Toll), M42 and West Coast Mainline. The A5 itself is a unique part of the Borough. It is a road which is multi-functional, serving a national as well as a local requirement. High Speed Rail will bring with it its own unique issues. However, access to jobs and training is still an issue. 7 A range of major employers. The Borough is the location for national and regional headquarters of both national and international companies with two rail freight facilities, which is unusual for such a relatively small Borough. In addition, the Borough is close to the MIRA Technology Park.
Flooding & waterHealth, schools & communityTransport & travel📍 Coleshill
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.