Policy LP3

Green Belt and Grey Belt

On pages 30 to 32 of the official PDF.

The human version

This policy protects the Green Belt. Inappropriate development is harmful and should not be approved except in very special circumstances. Settlement boundaries are excluded from the Green Belt, and limited infilling is allowed within infill boundaries or where a site has built development on three or more sides. Extensions and replacement buildings are judged on their merits, using the building as it stood on 1 July 1948. For Grey Belt land, development must be in a sustainable location, include at least 50% affordable housing, not undermine the remaining Green Belt, and meet the Golden Rules on affordable housing, infrastructure and accessible green spaces.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 30

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

LP3 Green Belt and Grey Belt Inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. Other than in instances where allocations are proposed, Green Belt within the Borough will be protected accordingly. The following criteria sets out how Green Belt applies to land and settlements in North Warwickshire, whether named in LP2 or not, with development management policy/policies for the Green Belt set out subsequently. 1 The outer extent of the Green Belt as well as the detailed development boundaries for the settlements identified in Policy LP2 are shown on the Policies Map 2. Areas within Development Boundaries are excluded from the Green Belt. 3. Limited infilling in settlements washed over by the Green Belt will be allowed within the infill boundaries as defined on the Policies Map. 4. Limited infilling may also be acceptable where a site is clearly part of the built form of a settlement, i.e. where there is substantial built development around three or more sides of a site. 5. Settlements surrounded or washed over by the Green Belt will be able to pursue the Community Right to Build in accordance with the relevant statutory requirements. When considering proposals within the Green Belt in addition to the NPPF, regard should also be had to the following considerations: a) provision of appropriate facilities for outdoor sport, outdoor recreation and for cemeteries, as long as it preserves the openness of the Green Belt and does not conflict with the purposes of including land within it, regard will be had to whether such proposals are of a scale necessary for the efficient function of the parent use concerned and that they are the minimum size necessary b) Extensions will be considered to be disproportionate building based on the merits of each 5 North Warwickshire Green Belt Study 2026 individual case. Both quantitative and qualitative criteria will be used in this assessment. For the purposes of this policy, the original building is defined as that which was present on 1 July 1948 or that which came into being after this date as a result of the original planning permission, i.e., as built and volume is defined as gross external volume including basements and cellars. c) A replacement building will be considered to be materially larger based on the merits of each individual case. Both quantitative and qualitative criteria will be used in this assessment. Replacements should be located on the same footprint as the existing building unless there are material benefits to the openness of the Green Belt or, when environmental and amenity improvements indicate otherwise. For the purposes of this policy, volume is defined as gross external volume including basements and cellars. d) Consideration will be given to the removal of permitted development rights where the new development is considered to be at the maximum scale acceptable to ensure the openness of the Green Belt, or where other issues such as visual impact and impact on neighbouring residential amenity, are material. e) Relevant planning consideration, such as coalescence and urban sprawl, the sustainability of the location; landscape and visual appearance or impact, the loss of employment land and impacts on general amenity will all be considered in the final planning balance in respect of proposals to redevelop previously developed land within the Green Belt. Grey Belt Development proposals that are assessed as within ‘Grey Belt’ must be in a sustainable location and, they will only be considered acceptable if all of the following criteria are satisfied: • The proposed development is in a sustainable location according to LP2 Settlement Hierarchy; and, • A residential development includes at least 50% Affordable Housing in accordance with policy LP9; and, • The proposed development does not fundamentally undermine the purposes (taken together) of the remaining Green Belt across the area of the plan; and, • The proposed development meets the Golden Rules relating to affordable housing contributions, infrastructure improvements and accessible green spaces. Strategic Gap 7.24c The purpose of policy LP4 is to retain and respect the separate identities and characters of a number of settlements within and adjoining the Borough. The policy seeks to maintain clear gaps between those settlements/places and to avoid their coalescence. The Strategic Gaps seek to retain and maintain the sense of space, place and separation between these settlements so that when travelling through a Strategic Gap (by all modes of transport), a traveller should have a clear sense of having left the first settlement, having travelled through an undeveloped area and then entering the second settlement. 7.24d The policy originally focused on the relationship between Tamworth and Polesworth and Dordon. It is clear however as growth within the Borough continues there is increased pressure on other “gaps” between settlements. For this reason, this policy will be extended to cover other areas, as outlined in the policy. Work is ongoing in a Strategic Gap Study to clearly identify additional areas and when published, the newly identified Strategic Gaps will also be covered by this policy. Any further considerations of widening the strategic gap study area will need to be considered in a future Local Plan review 7.25 Polesworth with Dordon is one of the Market Towns in the Borough. Due to its location it has a close relationship with Tamworth. NW19 of the Core Strategy 2014 referred to a strategic gap between Polesworth and Dordon. This was to avoid coalescence with Tamworth. The Core Strategy, however, did not define where the boundaries of this area would fall and it was expected that this would be through the emerging Site Allocations Plan. As NWLP 2021 superseded the production of the Site Allocations Plan it is now included in this Plan. 7.26 A detailed technical study has been carried out to look at the area and to determine where the detailed boundaries should be drawn. A separate consultation was carried out by the Council to consider the extent of the “gap” and this has informed the designation as shown on the Policies Map. 7.27 Following the approval of the site at the south-eastern site of junction 10 M42 and A5 for employment use the area south of the A5 is removed from the Meaningful Gap as proposed in the Draft Site Allocations Plan and Draft Local Plan. This means that any consideration of a contiguous area linking the Green Belt northwards cannot be considered. The Strategic Gap north of the A5 is therefore free standing. Its purpose is clear in that it is to maintain the gap, both visually and in landscape terms between the urban areas of Polesworth, Dordon and Tamworth. 7.27a One of the suggested Strategic Gaps covers Coleshill which is in the Green Belt. However, the NPPF 2026 indicates that local designations should only be deployed where normal planning policies or national designations cannot provide the necessary protection. This makes adding a local designation of a strategic gap redundant. The Borough Council will keep this under review. 7.27b There is increasing pressure on the identities of settlements along the A5 corridor therefore, there is also the option to maintaining the settlement identities along the A5 corridor as well by introducing Strategic Gaps here. Given there are a number of options, further work is being undertaken to identify the additional areas that the Strategic Gap study could cover. The Study will provide information on the approach to updating the Strategic Gap policy and will provide the evidence to support which areas are to be included. The policy will be updated accordingly.
Design & placemakingGreen Belt & countrysideSite allocations📍 Coleshill📍 Dordon📍 Polesworth📍 Tamworth
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.