← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / LP33

Policy LP33

Water Management

On pages 91 to 92 of the official PDF.

The human version

This policy covers water and flood risk management. Development must not harm the ecological status of a waterbody, and should look at de-culverting and river restoration. Runoff must be no more than greenfield rates, using SuDS, or at least a 50% reduction where that is not possible. In Flood Zone 3 there must be floodplain compensation, an 8m set back from main rivers, and floor levels 600mm above the flood level. A Water Statement must show adequate sewerage. New homes must achieve no more than 100 litres per person per day. Large non-residential buildings must reach at least 4 BREEAM water credits. The text also begins the parking section.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 91

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

LP33 Water and Flood Risk Management In line with the objectives of the Water Framework Directive, development proposals must not detrimentally affect the ecological status of a waterbody and where appropriate, incorporate measures to improve its ecological value. Opportunities should be sought to de-culvert rivers, in order to reduce flood risk through stopping flows backing up by undersized culverts. This should only be undertaken when it is demonstrated to not increase flood risk elsewhere. If de-culverting is not proposed evidence will be required to demonstrate why this is not possible. River channel restoration should also be undertaken to return the water course to its natural state and restore floodplain to reduce the impact of flooding downstream. New developments should also seek opportunities to improve natural riverine processes and in- stream and bankside morphology through watercourse re-naturalisation and the removal of man- made structures, both on the development site and in the wider catchment. Water runoff from new development should be no more than natural greenfield runoff rates and developments should hold this water back on the development site through high quality, multi-functional Sustainable Urban Drainage Systems (SuDS), reducing pollution and flood risk to nearby watercourses. Where it has been established to the satisfaction of the LLFA that it is technically not possible to achieve these rates, development should aim to provide the maximum betterment possible and at least a 50% reduction in discharge rates should be achieved. The culverting of watercourses will only be approved in exceptional circumstances. The multifunctional benefits of natural flood management, the re-naturalisation of watercourses and their floodplains and the safeguarding of land for local flood risk management schemes will be promoted when considering any developments in the Borough. New development proposals in or land raising within Flood Zone 3 (including Climate Change) should provide for the following: i) Floodplain Compensation; provide floodplain compensation on a level-for-level, volume for volume basis; ii) should set back 8m from the top of the banks of Main Rivers and any culverted watercourse, regardless of the flood zone; iii) Finished floor levels (FFL) within Flood Zone 3 (including climate Change) and on land adjacent should be set a minimum of 600mm above Flood Zone 3, (including climate change) flood level; iv) have agreements in place that “less vulnerable” uses are prevented for changing to those that are more vulnerable, and (only applies to ground floor developments in line with SFRA section 12.4), and single storey residential development, basements and buildings on stilts should not be located within Flood Zone 3 (including climate change), and v) include mitigation measures to account for up to the 1 in 100 year (1% AEP) plus climate change fluvial flood event as well as safe access and egress In order to improve and protect water quality, infiltration measures are the preferred means of surface water disposal where ground conditions are appropriate and where practicable, the separation of surface water from sewers should be undertaken. New development proposals should be accompanied by a Water Statement that includes evidence to demonstrate that there is adequate sewerage infrastructure in place or that it will be in place prior to occupation. Proposals for new development should not detrimentally impact on existing and planned flood risk management schemes. New developments that will benefit from existing flood risk management schemes will be required to contribute towards their upgrade and/or ongoing maintenance. Development proposals should demonstrate that they are water efficient and should incorporate water saving measures such as rainwater harvesting and greywater recycling systems into schemes where appropriate. All new residential proposals must be designed to achieve a water consumption rate of no more than 100 litres per person per day, as measured, in accordance with an approved methodology. New non-residential development greater than 1,000 sqm must achieve a score of at least 4 credits within the WAT01 water consumption category for the ‘BREEAM New Construction Standard’ or an equivalent standard set out in any future update. Parking 13.28 Transport in a rural area has a different dynamic to that in a built up area. There is a strong dependence on the use of the motor car, as rural bus services may not provide the required journey at the relevant time to access employment sites, in particular. This reliance on the motor car can lead to local issues that may result in a greater need for on-site parking and thus result in localised parking standards. It is important that provision is made for proper vehicular access, sufficient parking and manoeuvring for vehicles in accordance with adopted standards; 13.29 Civil Enforcement was introduced five years ago for the market towns as it was clear the towns were or had reached capacity at peak times. Coleshill town centre currently suffers from insufficient publicly accessible parking to serve both its commercial, economic and residential needs and functions 13.31 However, increased development levels expected to be accommodated in this Local Plan are likely to significantly increase pressure on available spaces. To enable adequate capacity to serve the commercial function of the town centres it is recommended that new housing development within the identified Town Centres should provide a minimum level of private parking to reduce the pressure on current public provision. 13.32 The Government continues to pursue the move to electric vehicles. The implication is that more electric vehicles will be on our roads as prices reduce and batteries improve. This has implications on the need to provide the right infrastructure to support this decision. Rapid charging points will be particularly important in the public domain. In addition, all domestic properties and commercial premises need to provide for the opportunity to charge vehicles close to the parking of vehicles.
Flooding & waterTown centres & shopsTransport & travel📍 Coleshill
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.