The human version (we wrote this, not the council)This site allocation covers Northampton Railway Station and Railfreight. Proposals should create a town centre gateway and multimodal transport hub. The station and its facilities are safeguarded for current and future passenger services. A multi-storey car park is supported. Mixed-use development is supported on the station site, with about 280 homes and buildings no higher than nine storeys. On the railfreight site about 362 dwellings are supported, at three to six storeys, on land not needed for rail. Developers must protect the Northampton Castle scheduled monument, provide natural greenspace, carry out ecological and flood risk assessments, and contribute to healthcare and transport.
Hunsbury
5 sections of the plan, in document order.
The human version (we wrote this, not the council)This site allocation covers Hill Farm Rise, Hunsbury Hill in Northampton, allocated for residential development of approximately 80 dwellings. Proposals must follow the diagram in Figure 8. They need an ecological survey and landscape assessment, covering established trees, possible priority grassland and a possible wildlife site. They must be sensitive to the adjoining Local Wildlife Site and keep rail network operational access. Design must reduce noise, particularly from the railway. Other requirements include better links to the Mereway neighbourhood centre, a flood risk assessment, a transport assessment covering the A45 and M1, and contributions to transport and healthcare.
The human version (we wrote this, not the council)This policy sets the housing requirement for West Northamptonshire for the plan period 2026 to 2043 at 42,704 homes. The plan will also provide an additional 5% to ensure choice and competition in the market for land. These homes will be delivered through allocations made in this Plan, other policies in this Plan that provide for new homes, existing commitments, and allocations in Neighbourhood Development Plans.
The human version (we wrote this, not the council)This policy covers trees and hedgerows in development. Proposals should integrate existing trees, woodland and hedgerows, and unavoidable losses need replacement planting for each tree lost. Retained trees must be protected during works, and planting should use native species of local provenance. Loss of ancient woodland and veteran trees is not permitted unless the benefits clearly outweigh the loss. All new development must meet the Urban Greening Factor standard to help reach average green cover of 40% and avoid net loss of urban green cover. Major commercial development needs a score of at least 0.3, residential at least 0.4, and 0.5 on greenfield land.
The human version (we wrote this, not the council)This section is the housing trajectory, a set of tables showing expected new homes in each year from 2026/27 to 2042/43. The requirement is 2,512 homes a year, 42,704 in total, or 2,638 a year with the 5% buffer. Total expected supply over the plan period is 44,779 homes, against a cumulative requirement with the buffer of 44,839, a shortfall of 60 by the end of the period. Supply falls short in the early and late years and exceeds the requirement in the middle years. Further tables break the supply down by site for each area, starting with Northampton.