Policy HO1 – Housing requirement
A. The housing requirement for West Northamptonshire for the plan period 2026 to 2043 is
42,704 homes. In addition to this requirement this plan will provide for an additional 5% to
ensure choice and competition in the market for land.
B. The provision in A. will be achieved by allocations made in this Plan, by policies in this Plan
which provide for new homes, existing commitments and allocations in Neighbourhood
Development Plans.
WNLP objectives: 12
11.3. Housing and housing led allocations
11.3.1. Policies allocating sites for housing or housing led development are included in
the place-based sections of this Plan. For convenience all of these allocations
are included in figures 30 to 34 below.
11.3.2. Most of the sites in those figures are already allocated in the WNJCS or part 2
plans (all of which will be replaced by this Plan, when adopted). Recognising
those sites in this Plan confirms that these sites make a very significant
contribution to the housing requirement in this Plan and provides certainty
that the Council continues to support housing or housing led development on
these sites.
11.3.3. In addition to the allocations included in the tables below, the Northampton
Part 2 Local Plan allocates a number of sites for less than 50 dwellings.
Because of their scale, they are not reallocated in this Plan, therefore, any
sites that have not come forward when this Plan is adopted would be judged
against the relevant policies in this Plan.
Figure 29: Housing Supply in allocations – Northampton (Ordered by: SUEs in WNJCS, allocations in Part 2 Plan, new
allocations)
Policy
Reference
in this Plan
(where
applicable)
Name Total
Capacity
Units
Completed
as at
1/4/2026
Remaining
Capacity
expected to
be built in
the Plan
Period
Notes
N16
This relates
to the
northern part
only
The allocation
in the WNJCS
is proposed
to be re-
allocated and
extended in
this plan.
Northampton North 3,550 1,538 2,047 Site is part of a larger site allocated as N3 in the
WNJCS.
Southern part has Reserved Matters approvals
for approximately 2,000 dwellings. All phases
of the site are currently complete or under
construction.
Northern part, which is reallocated in this plan
as East of A43, has a resolution to grant outline
planning permission for 1,600 dwellings. This
area is included as an allocation in this plan.
This plan proposes that the allocation be
extended to the north for a further 350
dwellings.
N17
The part of
the allocation
in the WNJCS
to the south
of Roman
Road is
proposed to
be re-
allocated in
this plan.
Northampton West 2,550
220 2,330 Site is part of a larger site allocated
as N4 in the WNJCS. Small part of
allocation is completed (south of
Whites Lane).
Majority of the WNJCS allocation has outline
permission for 1,750 dwellings and parts of that
have Reserved Matters approval. Houses have
been completed on first phase and further site
preparation/construction is currently underway.
Part to the south, phase 5, has the benefit of a
hybrid permission.
An area to the south of Roman Road is re-
allocated in this plan.
Policy
Reference
in this Plan
(where
applicable)
Name Total
Capacity
Units
Completed
as at
1/4/2026
Remaining
Capacity
expected to
be built in
the Plan
Period
Notes
Not
applicable
Northampton South 1,000 483 517 Site is allocated as N5 in the WNJCS.
All of the site has outline permission for 1,000
dwellings, and most of that has reserved matters
approvals. Site is currently under construction.
Not
applicable
Northampton
South of
Brackmills
1,525 344 1,021 Site is allocated as N6 in the WNJCS.
All of the site has outline permission and
reserved matters approval. Site is currently
under construction.
Not
Applicable
Northampton
Kings Heath
3,000 247 2,753 Site is allocated as N7 in the WNJCS.
All of the site has outline permission. Two
Reserved Matters applications have been
approved on part. Site is currently under
construction.
Not
applicable
Northampton
North of
Whitehills
1,086 980 106 Site is allocated as N8 in the WNJCS.
Most of the site is complete, the remainder has
full permission and is currently under
construction.
Not
applicable
Northampton
Upton Park
860 466 394 Site is allocated as N9 in the WNJCS.
All of the site has Full permission and is currently
under construction.
Not
applicable
Northampton
Norwood
Farm/Upton
Lodge
3,418 800 2,618 Site is allocated as N9A in the WNJCS.
All of the allocation has outline permission and part
of that has reserved matters. It is currently under
construction.
Upton Lodge has a resolution to grant outline
permission.
N6(xxiv)
Former Lings
Upper
School, Birds
Hill Walk
60 0 60 Site is allocated as LAA0193 in policy HO1 of
Northampton Part 2 Plan
N6(xxiii)
The Farm,
Hardingstone
55 0 55 Site is allocated as LAA0204 in policy HO1 of
Northampton Part 2 Plan.
A Full application has been received for the
entire site, as yet undetermined.
Policy
Reference
in this Plan
(where
applicable)
Name Total
Capacity
Units
Completed
as at
1/4/2026
Remaining
Capacity
expected to
be built in
the Plan
Period
Notes
N6(vi)
Northampton
Railway
Station Car
Park
280 0 280 Site is allocated as LAA0288 in policy HO1 of
Northampton Part 2 Plan
A hybrid application has a resolution to grant
permission
N6(vii)
Northampton
Railway
Station
(railfreight)
188 0 188 Site is allocated as LAA0333 in policy HO1 of
Northampton Part 2 Plan
N6(xiii)
Pineham 80 0 80 Site is allocated as LAA1006 in policy HO1 of
Northampton Part 2 Plan
An outline application has been received for the
entire site, as yet undetermined.
Not
applicable
University of
Northampton
Park Campus
585 510 75 Site is allocated as LAA1013 in policy HO1 of
Northampton Part 2 Plan.
Most of site is already developed. Capacity for 75
remaining
Not
applicable
University of
Northampton
Avenue
Campus
170 0 170 Site is allocated as LAA1014 in policy HO1 of
Northampton Part 2 Plan.
Permissions have been granted.
Not
applicable
Belgrave
House
122 0 0 Site is allocated as LAA1022 in policy HO1 of
Northampton Part 2 Plan
This is now part of the wider Greyfriars
regeneration project and is no longer proposed
for housing.
N6(xi)
Land to the
West of
Towcester
Road
230 0 230 Site is allocated as LAA1102 in policy HO1 of
Northampton Part 2 Plan
An outline application has been received for the
entire site, as yet undetermined.
N6(xx)
The Green,
Great
Houghton
650 0 650 Site is allocated as LAA1098 in policy HO1 of
Northampton Part 2 Plan
An outline application has been received for 650
dwellings on the entire site, as yet
undetermined.
Policy
Reference
in this Plan
(where
applicable)
Name Total
Capacity
Units
Completed
as at
1/4/2026
Remaining
Capacity
expected to
be built in
the Plan
Period
Notes
N6(xii)
Hill Farm
Rise,
Hunsbury Hill
80 0 80 Site is allocated as LAA1100 in policy HO1 of
Northampton Part 2 Plan
N6(xxii)
Watering
Lane,
Collingtree
265 0 265 Site is allocated as LAA1104 in policy HO1 of
Northampton Part 2 Plan
Not
applicable
Former Abington Mill
Farm,
land off
Rushmere
Road,
125 0 Site is allocated as LAA1107 in policy HO1 of
Northampton Part 2 Plan
Site is not included in this Regulation 19 plan.
N6(iv)
Greyfriars 400 0 400 Site is allocated as LAA1113 in policy HO1 of
Northampton Part 2 Plan
Not
applicable
Wootton
Fields
74 0 0 Site is allocated as LAA1137 in policy HO1 of
Northampton Part 2 Plan
Site is included in adjacent East of Wooldale
Road.
N6(xi)
Land north of
Milton Ham
100 0 100 Site is allocated as LAA1140 in policy HO1 of
Northampton Part 2 Plan
Further work suggests reduced capacity for this
site.
N6(ix)
Land to west
of
Northampton
South SUE
361 0 361 Site is allocated as LAA1144 in policy HO1 of
Northampton Part 2 Plan
Outline planning application submitted, and has
a resolution to grant permission
N13 Land east of
Wooldale Road
1,700 0 1,700 Proposed allocation in this Plan.
N14 Land north of
Newport
Pagnell Road
1,000 0 1,000 Proposed allocation in this Plan.
Policy
Reference
in this Plan
(where
applicable)
Name Total
Capacity
Units
Completed
as at
1/4/2026
Remaining
Capacity
expected to
be built in
the Plan
Period
Notes
N15 Land West of
A43
2,900 0 2,900 Proposed allocation in this Plan.
This proposal was included in the previous
Regulation 18 plan. It is proposed to extend this
allocation to the north.
N18 North of
Buckton
fields
1,500 0 1,500 Proposed allocation in this Plan
N20 Grange Park 850 0 850 Proposed allocation in this Plan
Figure 30: Housing Supply in Allocations - Daventry (Ordered by: SUEs in WNJCS, allocations in Part 2 Plan, new allocations)
Policy
Reference
Name Total
Capacity
Units
Complete
d as at
1/4/2026
Remaining
Capacity
expected to
be built in
the Plan
Period
Notes
D5 Daventry North East 3,400 0 3,400 Site is allocated as D2 in the WNJCS.
An outline application has been submitted for the
whole site. It is not yet determined and therefore
is re-allocated in this plan.
Not
applicable
Daventry South West 1,240 429 811 Site is allocated as HO1 in the S and CLP.
Part of site has been completed with 140
dwellings. Main part has outline permission for
1,100 dwellings and reserved matters approvals
for some phases. Site is under construction
D3 Daventry Micklewell
Park Extension
430
0 430 Site is allocated as HO2 in the S and CLP.
This plan proposes an extension of this allocation.
D4 Daventry, North of
Middlemore
720 0 720 Proposed allocation in this plan
D6 Daventry, land to North
and West of Town
Centre
0 0 0 Site is allocated as EC3 in the S and CLP.
It is not included in this plan for housing.
Policy
Reference
Name Total
Capacity
Units
Complete
d as at
1/4/2026
Remaining
Capacity
expected to
be built in
the Plan
Period
Notes
D7 Former Council offices,
Lodge Road
0 0 0 The Council offices are now surplus to the
Council’s requirements and therefore available for
an alternative use or redevelopment. Could be
developed for a range of uses including housing.
No capacity identified as uncertainty about future
use.
Figure 31: Housing Supply in Allocations - Brackley
Policy
Reference
Name Total
Capacit
y
Units
Completed
as at
1/4/2026
Remaining
Capacity
expected
to be built
in
the Plan
Period
Notes
Not applicable Brackley East Sustainable
Urban Extension
350 0 350 Site is allocated as B2 in the WNJCS.
Planning permission has been granted for
housing
B4 Brackley West 700 0 700 Proposed allocation in this plan.
B5 Brackley, North of Radstone
Fields
450 0 450 Proposed allocation in this plan.
B6 Brackley, East of Radstone
Road
150 0 150 Proposed allocation in this plan.
Figure 32: Housing Supply in Allocations - Towcester
Policy
Reference
Name Total Capacity Units
Complete
d as at
1/4/2026
Remaining
Capacity
expected to
be built in
the Plan
Period
Notes
Not applicable Towcester South
sustainable Urban
extension
3,171
[Towcester Vale
(2,750) +
Wood Burcote
(210) + Park
Hall Farm
(211)]
1,810
[Towcester
Vale
(1,389) +
Wood
Burcote
(210) +
Park Hall
Farm
(211)]
1,361
[Towcester
Vale
(1,361) +
Wood
Burcote
(0) +
Park Hall
Farm (0)]
Site is allocated as T3 in the WNJCS. All of
site has outline permission, parts have
Reserved Matters / Full. Various
phases/parcels are currently under
construction.
T3 Towcester, north of
Burcote Road
1,400 0 1,400 Proposed allocation in this plan
Figure 33: Housing Supply in Allocations – Growth at Long Buckby Station
Policy
Reference
Name Total
Capacity
Units
Completed
as at
1/4/2026
Remaining
Capacity
expected to
be built in
the Plan
Period
Notes
LB1 Growth at Long Buckby Station 1,000 0 1,000 Proposed allocation in this Plan
11.4. Affordable housing
11.4.1. The HENA 2025 identifies an acute need for affordable housing across West
Northamptonshire, most of this need being from households whose needs are
not met by market housing. There is a particular need for affordable rented
housing, both social and affordable rented. Social rents are more affordable and
would benefit a wider range of households, therefore the HENA recommends
that they should be prioritised where delivery does not prejudice the overall
delivery of affordable homes.
11.4.2. The HENA also considered the role of affordable home ownership, such as
discounted market sale housing and shared ownership. There was no strong
evidence of a need for discounted market housing in general, and the main
focus should be on shared ownership.
11.4.3. The level of affordable need means that the Council should maximise the
delivery of such housing at every opportunity. Policy HO2 sets targets of 10% of
new homes to be affordable in the Northampton and Daventry urban areas and
35% in the Brackley, Towcester and Rural areas. It is accepted that there may
viability challenges on brownfield sites or apartment only developments. In such
circumstances, some flexibility on the targets will be allowed, subject to
submission and agreement of evidence of viability or other site specific
constraints. The affordable housing should be on an 80:20 split between
affordable housing for rent and affordable housing to buy. Of the affordable
housing for rent around 70% should be at social rents and 30% at affordable
rents. For the 20% affordable home ownership, this should focus on shared
ownership and other low cost home ownership products.
11.4.4. In setting a site size threshold, in the absence of evidence to support a lower
threshold, the national threshold of 10 dwellings will be applied.
11.4.5. The subdivision of sites or the development of sites at artificially low densities to
avoid the provision of affordable housing by circumventing the size thresholds
will not be permitted. Where the Council considers that a site has been
artificially subdivided in order to avoid the application of the affordable housing
policies, the entire area, assumed to be developed at a suitable density, will be
used to assess the required provision of affordable housing.
11.4.6. The expectation is that the affordable housing will be provided on-site. There
may, however, be exceptional circumstances where it cannot be provided on
site and off-site provision and/or commuted payments are sought. Examples of
include site specific design, management or operation issues for the affordable
housing provider, specialist housing needs and where more affordable housing
can be delivered off site. In these situations, applicants will be required to
provide robust evidence to demonstrate that it is not possible or appropriate.
Where applicants are seeking to make off- site provision or a financial
contribution they should engage with the Council at the start of the process.
11.4.7. Any financial contribution should be based on the equivalent amount that would
be contributed by the developer were the affordable housing to be provided on
site. It must be sufficient to deliver the right number and sizes of affordable
housing. In order to ensure a robust and consistent approach, the following
formula should be used to calculate the appropriate financial contribution:
R 100% M = Residual land value with 100% market housing
RV AH = Residual land value with X% affordable housing
Equivalent commuted sum = (RV 100% M minus RV AH). Payment of the
financial contribution will be secured by a planning obligation.
Community led housing
11.4.8. The Council will support community led housing groups to deliver affordable
housing and will work with town and parish councils and community groups to
deliver rural affordable schemes and community led homes for residents. Local
communities may take the opportunity to identify and plan for local housing
needs through neighbourhood planning or other community planning
documents.
11.4.9. In all cases, the local housing need will be identified through up-to-date parish
level evidence. Housing needs surveys (HNS) are undertaken by the Council or
an appropriately experienced organisation and provide detailed evidence on
housing needs using primary and secondary sources of information to
demonstrate the level and nature of affordable housing need. Housing Needs
Assessments (HNA) are prepared by an applicant to support a planning
application and will include primary sources of information consistent with an
HNS. HNAs must be robust and applicants should agree the approach in
advance with the Council to ensure consistency in the methodology and
analysis. HNSs and HNAs are considered to be valid for five years, however, any
application that relies on an HNS or HNA must be submitted within that period.