What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Knowle, Dorridge & Bentley Heath
The Settlement Now
635. Lying around 3 miles southeast of Solihull Town Centre, Knowle, Dorridge and Bentley Heath
(KDBH) is a town with a combined population of around 19,300 in some 7,900 households. It
is inset in the Green Belt which separates it from the main urban area of Solihull and the
surrounding rural villages.
636. Whilst Knowle, Dorridge and Bentley Heath are essentially three communities, the significant
post-war development in the area means that they are now physically and functionally linked
such that they form one built up area. Reflecting this relationship and the scale of the
settlement, the Council identified Knowle, Dorridge and Bentley Heath as a town in October
2025. It is not obvious where one area ends and another one begins and there are strong links
between each community as they share many local services and facilities. However, each area
has its own shopping provision, park, primary school, community/village hall and churches
which help to underpin the sense of individual identity.
637. The historic medieval core of Knowle is centred on the High Street and the church of St. John
the Baptist, St. Lawrence and St. Anne, at the junction of two historic routes. This area is
protected by Conservation Area designation and includes 53 statutory listed buildings and a
number of locally listed assets. Knowle has a thriving and well used local centre with an
extensive range of shops, facilities and services.
638. Similarly, development from the later Victorian and Edwardian periods around and near to
Dorridge railway station (Station Approach and Granville Road) also benefit from Conservation
Area status. The shopping parade in Dorridge provides up-dated modern facilities and a public
realm that enhances the centre as a whole. It includes food and drink outlets, small business,
shops and services.
639. Bentley Heath has a smaller range of shops and services providing more for the day-to-day
convenience needs of residents.
640. Overall, the settlement benefits from an attractive residential environment with leafy green
streets, access to a number of parks, open spaces and green spaces within the area, and links
to the countryside beyond. Green and blue infrastructure is a valuable attribute, with local
wildlife sites and local nature reserves, as well as the canal which provides an important
environmental and recreational feature.
641. KDBH is served by four primary schools (including a Catholic primary school) and the Arden
Academy and Sixth Form Centre secondary school which has a current capacity of around
1,800 pupils. However, the recent housing developments in the area along with a fluctuating
birth rate, is impacting school places.
642. The area is valued by residents for the wide range of community services and facilities that are
enjoyed and used extensively. These include Knowle Library, Knowle and Dorridge scout huts,
sports and recreation facilities, local allotments and commercial premises such as post
offices, chemists and public houses that are a vital part of village life. The settlement is also
well served in terms of health facilities with 3 GP surgeries and 5 dental surgeries.
643. The settlement as a whole has a high proportion of detached dwellings and low -density
residential development is a characteristic of some parts of the settlement. House prices are
amongst the most expensive in the Borough and affordability continues to be an issue for those
seeking access to housing, as does the need to provide a more appropriate range of housing
types and sizes to meet future needs.
644. The area has good links to key employment sites at Blythe Valley Park and Solihull Town Centre.
The northwest of the settlement is crossed by the M42 with junction 5 providing access to the
motorway network. The main A road through the area is the A4141 running from Solihull
through Knowle, on to Chadwick End and out of the Borough towards Warwick.
645. The settlement is reasonably well served by public transport with bus services running
throughout the area with routes to Solihull, Balsall Common and Coventry. Regular train
services from Dorridge Station provide links to Kidderminster, Solihull, Birmingham,
Leamington Spa and London . However, whilst Dorridge Station car park can accommodate
over 100 vehicles, this well used station quickly reaches capacity in the mornings with
commuter parking resulting in overspill parking in residential roads nearby. This also affects
the availability of parking for local shoppers.
646. In April 2019 the Knowle, Dorridge and Bentley Heath Neighbourhood Plan was ‘made’ by the
Council. It is therefore part of the statutory Development Plan for Solihull and sets out the
objectives and vision for the area as it develops in the future. The Neighbourhood Plan is
currently undergoing an update which is not expected to change the nature of the plan .
Therefore, further development within the Neighbourhood Area will be expected to support the
vision and objectives, and planning applications should be in accordance with the relevant
policies of the Neighbourhood Plan, where there is no conflict with the Local Plan.
The Settlement in the Future
647. Knowle, Dorridge and Bentley Heath is one of two rural towns in the Borough that has a full
range of facilities including both secondary & primary schools, health services and a range of
shops, services and facilities. As such it is well placed to accommodate growth in excess of
just its own local needs. Given that the area is mainly residential, the opportunities to develop
on previously developed land in KDBH are extremely limited and Green Belt release around the
settlement has been required to accommodate new development. However, maintaining
separation of KDBH from Solihull and other settlements will continue to be important to
preserve the character and context of the town.
648. Although the settlement does not have significant areas of employment uses (other than
service uses) and many of the area’s economically active residents travel out to work, there is
good access to the motorway and wider road network. Whilst the main road through the centre
of Knowle will continue to provide an important link in this regard, it can be congested at peak
times and is likely to experience increased vehicle movements in the future, in any event. Given
that the historic medieval core of Knowle i s centred on the High Street and is protected by
conservation area status, it will be important to mitigate congestion in this area in order to
maintain the character of this part of the settlement. Similarly, other roads in the area such as
Station Road, principally around school drop off and pick up times, see the free flow of traffic
interrupted and notable parking difficulties. Opportunities will be explored to consider how
these issues can be alleviated.
649. The area is however served by public transport, and it will be important to retain and where
possible improve the public transport offer. Dorridge railway station will continue to provide
an important facility for local commuters. Opportunities for enhancing existing walking and
cycling routes and creating new routes will continue to be explored, particularly where these
would provide access to schools, local centres and the railway station.
650. It will also be important to ensure that the local centres remain economically strong, vibrant
and continue to provide, support and enhance the variety of services and facilities for the local
population.
651. The historic core of Knowle will continue to be protected and enhanced and the local character
and distinctiveness of the settlements conserved, particularly, the Victorian and Edwardian
development around Dorridge railway station.
652. A mix of market and affordable housing, as well as smaller market homes for young people
wishing to remain in the area and specialist housing to meet the needs of older people will be
provided in the settlement. This will seek to align the types and sizes of homes to be made
available and the needs of the community. However, there will need to be a careful balance
struck between making the most efficient use of land and respecting the character of the local
area.
653. Education facilities in the area will remain successful. Pressure on primary schools created by
new development will be alleviated through the provision of an additional primary school and
secondary school facilities will be significantly improved to ensure that the available capacity
and full potential of the Arden Academy can be maximised.
What is Required for the Settlement in the Future?
654. Development in and around KDBH is not only an opportunity for the settlement to play a part
in accommodating the wider needs of the Borough, but also to accommodate a scale of
development that is capable of supporting infrastructure provision that can help play a part in
dealing with existing issues and provide the necessary facilities for future residents. In
particular the following areas are identified:
655. Improved Public Transport – A higher population gives greater potential for improved public
transport services to be viable, e.g. better frequency of bus services.
656. Parking Improvements – The provision of appropriate additional off-street parking may be
considered in centres. In addition, decked parking at Dorridge railway station could be
considered in order to increase capacity and alleviate the impact of commuter parking on
surrounding roads. Options to provide park and ride facilities will also be encouraged where
appropriate.
657. Highway Improvements – Traffic in the settlement is set to increase over the Plan period, even
without any new development. Additional traffic growth as a result of site allocations is likely
to exacerbate this situation and highway improvements will be required at various locat ions.
Approvals or resolutions to grant permission have included both site -specific highway works
and financial contributions towards wider transport improvements set out in the Knowle
Transport Study. This study will be updated and expanded to have regard to possible wider
impacts across Dorridge and Bentley Heath as well as Knowle.
658. Pedestrian and Cycling Connectivity – Enhancements to encourage and promote walking
and cycling in the settlement, particularly towards the local centres, schools and public
transport will be required. Developments will be expected to ensure that walking and cycling
connectivity is provided both within and beyond the site boundary, linking in with the existing
and proposed cycle and walking networks identified in the Council’s Cycling and Walking
Strategy, as well as routes for recreation.
659. New Education Provision – Given the additional pressure for school places that will be
generated as a result of further development in the settlement, a new primary school will be
required in Knowle. Whilst the provision of secondary school places is theoretically sufficient
to meet existing demand, the current infrastructure constraints of Arden Academy affect how
efficiently it can be used in the future. The academy has a largely ageing bui lt estate
(particularly its supporting infrastructure (including kitchen/dining space and other supporting
facilities)) and an undersized site relative to current DfE standards. The school is part of the
Government’s School Rebuilding Programme and any additional growth within the settlement
is likely to place further pressure on demand for school places.
660. As part of the development proposals on land south of Knowle (also known as site KN2 in the
previously withdrawn 2020 Local Plan) , land will be made available for the wider
redevelopment of Arden Academy to maximise its potential and allow for future expansion if
this proves necessary. Additional primary school provision is also required to support the level
of growth in the settlement and developer contributions will be expected to deliver this. Land
has been made available for a p rimary school site on land formerly known as KN2 as part of
an outline planning permission for 450 dwellings.
661. Play and Open Space – Provision of play and areas of open space within potential
development sites will be required. There is also a need to ensure that best use is made of
existing green and blue infrastructure assets within development sites, together with provision
for linkages to the surrounding area.
662. Sport and Recreation – Replacement of any lost recreation / sports provision as a result of
development will be required to an equivalent or better standard, including access and use by
the wider community where appropriate. It has been identified that a sports hub to serve the
new development in and around the settlement should be provided. This is set out under
policy SMBC/D2.
663. Green Space Improvements – In accordance with the NPPF and the ‘golden rule s’ ,
opportunities for the provision and improvement of local green space that is accessible and of
high quality will be maximised.
664. Health provision – The Council is working with the BSOL ICB to establish the impact of new
development on local GPs and other services, and how this can be addressed.
665. Community Infrastructure Levy – As the area is covered by ‘made’ Neighbourhood Plan, 25%
of the levy collected will be spent in the area. The Local Authority will engage with the local
community and agree with them how best to spend the funding, which could be used to take
forward appropriate projects that the community have identified as priorities through the
Neighbourhood Plan for example. This can include simple, relatively low -cost actions (e.g.
further traffic regulation orders) through to more substantial projects.
666. Affordable Housing and Smaller Market Homes – Affordable housing will be required on
development sites (in accordance with the Local Plan) and smaller market homes for younger
people wishing to stay in the area will be sought.
Proposed Approach
667. Knowle, Dorridge and Bentley Heath is a town identified for expansion. Given that the
opportunities to develop on previously developed land in KDBH are extremely limited, Green
Belt release will be required, and a redefined Green Belt boundary will need to be established.
In accordance with national planning policy, such boundaries should be defined clearly, using
physical features that are readily recognisable and likely to be defensible. Sites that are close
to the existing settlement or are / can be well -served by public transport will be preferable,
subject to their performance against the purposes in evidence base and constraints.
668. Sites where there are multiple and potentially complex land assembly issues and sites where
the cumulative impacts of their development will impact the settlement will need to be
considered collaboratively and comprehensively to ensure a quality development is delivered
and that contributions are made to the provision of the required infrastructure.
Recent Planning Applications
669. A number of recent planning applications need to be highlighted as they are relevant to how
the settlement will develop in the future, and they will have implications for determining what
an appropriate amended boundary to the Green Belt ought to be. The proposals include the
following:
Development of up to 845 dwellings (including 170 extra care units) dwellings on
Land South of Knowle / Land to the West of Warwick Road
670. Outline planning permission on part of this Green Belt site that was an allocation in the 2020
plan known as KN2, has been granted for up to 450 dwellings. It also includes land for a primary
school, infrastructure and open space.
671. Additionally, on another part of KN2 , hybrid planning permission has been granted for the
construction of an integrated retirement community of up to 170 extra care units (use class
C2) with ancillary communal and care facilities, village centre and green space.
672. A resolution to grant outline planning permission, subject to a S106 Agreement, has also been
made on a further area of KN2 for the erection of up to 200 dwellings. It includes landscaping
and new vehicular and pedestrian access from Warwick Road, and a land parcel for future
development at Arden Academy.
673. The remaining area of previous draft site allocation KN2, as identified for residential purposes,
is also now the subject of a full planning application for the erection of 25 dwellings. This has
not yet been determined.