The human version (we wrote this, not the council)This policy covers the UK Central Hub Area, which the plan says has the greatest potential for growth in the Borough. The Hub includes Birmingham Airport, the NEC, Birmingham Business Park and Jaguar Land Rover, and the Arden Cross site around the HS2 Interchange Station. Proposals must show how they support inclusive growth and the key assets, and improve connections and travel other than by car. They must not hold back development elsewhere in the Hub. They should provide green and blue infrastructure, good design, local jobs and low carbon energy. The Hub Framework Plan (2018) estimated up to 77,500 jobs and up to 4,000 new homes up to 2047.

The human version (we wrote this, not the council)This policy plans employment land for 2026 to 2043: up to 60.1 ha (gross) of industrial and warehousing land and 6.8 ha (gross) of office land. The main supply is Land at Arden Cross (UK1, 140 ha), Land at Damson Parkway (UK2, 57.5 ha gross) and about 30 ha of brownfield land at the NEC. Employment sites will be protected, with other uses allowed only in set cases, such as when there is no longer a need. Small and medium sized enterprises are encouraged, with North Solihull a priority. Business sites must include high-capacity digital infrastructure. Development causing unacceptable noise, odour, vibration or visual intrusion will not be allowed.

Policy SMBC/TM1

Rapid Transit

pp. 84–85

The human version (we wrote this, not the council)This policy supports in principle the delivery of Metro and Sprint rapid transit lines, especially along three corridors serving the UK Central Hub. These run from Digbeth and the east of Birmingham, from Blythe Valley through central Solihull to Chelmsley Wood, and from Hall Green through central Solihull. Development in or next to these corridors will be asked to contribute to Metro or Sprint and to design in access from the start. The supporting text notes HS2 is expected to open between 2036-39, and that the HS2 Act limits how plan policies apply. It also says an alternative route for Balsall Common traffic is justified.

The human version (we wrote this, not the council)This section describes the Blythe area, made up of the parishes of Dickens Heath, Cheswick Green and Tidbury Green. These are distinct villages separated by countryside and Green Belt, and bus services are poor. Cheswick Green and Tidbury Green will be inset from the Green Belt. Needs include better buses, walking and cycling links to Whitlock’s End station, highway works and a new two-form entry primary school at Land South of Dog Kennel Lane. A new secondary school may be needed. Green Belt release will be required. Recent decisions include up to 1,250 dwellings at Land South of Dog Kennel Lane.

The human version (we wrote this, not the council)This section describes Hockley Heath, a small village in the far south of the Borough, bisected by the A3400 Stratford Road. The parish has 1,900 people in some 770 households. The village has a small centre and a one-form entry primary school, but no doctors surgery. Growth is limited to small, proportionate extensions so the school is not overwhelmed. The Green Belt boundary will change, using the Stratford-upon-Avon Canal as the new southern edge. Needs include better school parking on School Road. Recent decisions include up to 99 dwellings south of School Road, up to 9 next to 84 School Road, and up to 80 west of Stratford Road.

The human version (we wrote this, not the council)This section describes Knowle, Dorridge and Bentley Heath, a town of around 19,300 people in some 7,900 households. It has a full range of facilities, including Arden Academy, so it is well placed for growth beyond its own needs. Brownfield land is very limited, so Green Belt release will be needed. Needs include better buses, possible decked parking at Dorridge railway station, highway works, walking and cycling links, a new primary school and land for the wider redevelopment of Arden Academy. On land formerly known as KN2, permission has been granted for up to 450 dwellings and up to 170 extra care units.

The human version (we wrote this, not the council)This section describes the UK Central Hub around junction 6 of the M42, which includes Arden Cross and the HS2 interchange site, Birmingham Airport, the NEC, Jaguar Land Rover and Birmingham Business Park. First HS2 trains are forecast between 2036 and 2039, with a journey time from London of 38 minutes. The Hub is expected to deliver many jobs and homes. Key needs include transport upgrades, a new primary school, and green and blue infrastructure. The Green Belt boundary will be amended to release Arden Cross (140 hectares) and land at Damson Parkway for employment and possible airport or JLR expansion.

The human version (we wrote this, not the council)This section lists common initialisms and abbreviations used in the plan and other planning documents, such as CIL for Community Infrastructure Levy and BNG for Biodiversity Net Gain. It also gives a short glossary of terms that often cause questions. Grey Belt is a sub-category of Green Belt, and the text quotes its NPPF definition. A washed over settlement stays inside the Green Belt, while an inset settlement is excluded from it by a defined boundary. Previously Developed Land, often called brownfield land, is also defined. The text notes that a brownfield site in the Green Belt is not automatically Grey Belt.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.