← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull Plan Explorer

Health, schools & community

Health and wellbeing, GP and hospital capacity, schools, sport, open space, play areas and community buildings.

301 sections of the plan, in document order.

The human version (we wrote this, not the council)This section sets out the national and regional setting for the plan. The plan will be tested against the NPPF of December 2024, but planning applications are decided under the NPPF published in August 2026, which brings in National Development Management Policies. The West Midlands Combined Authority is preparing a Spatial Development Strategy for the region, guided by eight principles, with adoption expected from spring or summer 2028. Regulations from 25 March 2026 removed the legal duty to cooperate, but the soundness test remains. The Council plans to meet all of its own needs. If the strategy later shows Solihull should take more, a new plan may be needed sooner.

The human version (we wrote this, not the council)This policy covers housing for older and disabled people. New housing should offer a mix of sizes and types to meet their needs. All new homes on major sites must meet Category M4(2) accessible and adaptable standards, unless built to M4(3). At least 5% of homes on major developments must be wheelchair user dwellings to M4(3). Developments of 300 dwellings or more must provide specialist housing or care bedspaces, though this will be applied flexibly. Specialist housing and care homes (Use Class C2) will be supported where they are close to shops, amenities, public transport and health care. Care homes must also meet Care Quality Commission standards.

The human version (we wrote this, not the council)This policy covers children's homes and other housing for children in care and care leavers. Proposals will only be approved if the property keeps the look and function of a home, does not harm local character, and does not create too many care homes nearby. They must avoid unacceptable noise, privacy and parking impacts, and provide enough living space, support space and bin storage. Children should have reasonable access to schools, healthcare and other services. A management plan is required. Extra support is given to proposals for specialist, complex needs. The supporting text points to a need for about 30 additional bedspaces between 2025 and 2029.

The human version (we wrote this, not the council)This policy plans for 50 additional permanent residential pitches for Gypsies and Travellers to 2043, as set out in the 2026 GTAA. This includes an allowance for 'undetermined' households. The need is split into periods: 23 pitches in 2026-30, 9 in 2031-35, 11 in 2036-40 and 7 in 2041-43. It will be met through unused planning consents and vacant pitches, extending or intensifying existing authorised sites, and an updated Gypsy and Traveller Site Allocations Plan. Sites will be judged on criteria such as scale, visual impact, flood risk, nature, amenity, safe highway access, space on site and access to local services.

Policy SMBC/E2

Arden Cross

pp. 59–61

The human version (we wrote this, not the council)This policy supports developing Arden Cross as the site of an exemplary high speed rail station, linked to Birmingham Airport and the NEC. Offices, homes, education uses and related retail, leisure and hotel uses of an appropriate scale will be supported. Land bounded by the M42, A452 and A45, shown as Site UK1, will be released from the Green Belt. Development should be comprehensive and coordinated. The site is some 140ha. The supporting text calls it a £3.2bn opportunity, with 400,000 to 600,000 sqm of commercial floorspace, including a University of Warwick HealthTech Campus. It also sets out the exceptional circumstances for removing the land from the Green Belt.

The human version (we wrote this, not the council)This section sets out the Council's vision-led approach to transport, which replaces the older 'predict and provide' method. The vision is of places where people can live without depending on their cars. Proposals should link into existing travel networks, give safe routes for active travel, help people with reduced mobility and reduce the need to travel. Proposals that generate a significant rise in trips need a transport assessment or statement and should be in sustainable locations. The section describes the transport strategy Solihull Connected (adopted 2023) and its four objectives, and the Cycling and Walking Strategy. It says no further local policy is needed beyond NDMP TR3.

The human version (we wrote this, not the council)This section introduces health and wellbeing. It says the built and natural environment is a key factor in health. The health of Solihull residents is generally good, but outcomes are not equal across the Borough, and high deprivation is linked to lasting health inequalities. So the Local Plan must do more on wider factors such as housing, green infrastructure, active travel, access to services and the local food environment. The section lists the Council Plan (2025-2030), the Health and Wellbeing Strategy (2024-2032) and the Health Inequalities Strategy. Proposals should show how they help reduce health inequalities. Health Impact Assessments will be a material consideration in planning decisions.

The human version (we wrote this, not the council)This policy says the Council will work with partners to create healthier places and reduce health inequalities. Development will be supported where it shows how it improves health and wellbeing, using local evidence such as the Joint Strategic Needs Assessment. Particular emphasis will be given to development that reduces inequalities in areas with poorer health or higher deprivation, supports active lifestyles, applies Active Design principles with direct walking links, and creates safe, inclusive places. Emphasis also goes to schemes that deliver accessible homes for all ages, improve access to primary care where needed, keep air quality safe, and avoid or reduce harm from pollution, noise, overheating and social isolation.

The human version (we wrote this, not the council)This policy says relevant planning applications must be supported by a suitable Health Impact Assessment, and applicants must show how any harm to health will be dealt with. Health impact screening is needed for all major development. A Rapid HIA will normally be needed for 50 or more dwellings or non-residential schemes over 1,000 sqm. A Full HIA will normally be needed for 150 or more dwellings, or schemes over 5 hectares. Major housing must show there is enough health and care capacity. The section also covers hot food takeaways, air quality, open space and sport, and notes that four new sports hubs should be brought forward.

The human version (we wrote this, not the council)This policy says major development is expected to provide, or pay towards, measures that reduce its impact, plus the infrastructure it needs. The Council may use planning obligations, pool contributions and collect the Community Infrastructure Levy. Schemes that cannot meet policies on viability grounds need a detailed Viability Assessment. The text explains contributions for education, healthcare, sports hubs, public transport, travel plans and police. Sports hubs are planned to serve Balsall Common, Blythe, East of Solihull and Knowle. From the last quarter of 2024 to mid-2026, at least 14 major schemes for up to 3,700 dwellings were approved, with up to £44 million in commuted sums.

The human version (we wrote this, not the council)This section describes Balsall Common and how it should grow. The town has around 7,000 people in some 2,900 households. It has secondary and primary schools, health services and shops, so it is well placed for growth beyond its own needs. Planned infrastructure includes the Balsall Common Relief Road in three phases, an enhanced centre, station parking, a new two form entry primary school at Barratt’s Farm and a sports hub. The Green Belt boundary will be amended, mainly using the west coast main line and HS2. Decisions include up to 970 dwellings at Barratt’s Farm and up to 110 at Frog Lane.

Policy SMBC/BC5

Trevallion Stud

pp. 120–121

The human version (we wrote this, not the council)This site allocation is for 310 dwellings at Trevallion Stud in Balsall Common. It covers the stud farm and some nearby parcels, much of which is previously developed land. The area bounded by Kenilworth Road and Wootton Green Lane would be removed from the Green Belt. Development should include public open space, play areas, retained trees and hedgerows, above ground SuDS and 5% of open market homes as self and custom build plots. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. Walking and cycling links towards Berkswell rail station and Balsall Common centre should be improved.

The human version (we wrote this, not the council)This site allocation is for 92 dwellings at Lavender Hall Farm in Balsall Common. It covers previously developed land behind the farm, north-west of the fishing lakes. Development should include public open space, play areas, retained trees and hedgerows, easy walking and cycling access to the rail station, and above ground SuDS. It should also protect the setting of nearby heritage assets and provide a buffer between new homes and both the existing railway line and HS2. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. The HS2 line will separate the site from the wider Green Belt.

The human version (we wrote this, not the council)This section describes the Blythe area, made up of the parishes of Dickens Heath, Cheswick Green and Tidbury Green. These are distinct villages separated by countryside and Green Belt, and bus services are poor. Cheswick Green and Tidbury Green will be inset from the Green Belt. Needs include better buses, walking and cycling links to Whitlock’s End station, highway works and a new two-form entry primary school at Land South of Dog Kennel Lane. A new secondary school may be needed. Green Belt release will be required. Recent decisions include up to 1,250 dwellings at Land South of Dog Kennel Lane.

The human version (we wrote this, not the council)This site allocation is for 450 dwellings at Whitlock’s End Farm. Development should respect the setting of the Grade II Whitlocks End Farm, keep trees and hedgerows along bridleways and footpaths, and provide open space, play areas, homes for older people and 5% self and custom build plots. Developers will contribute to a new 2-form primary school at Land South of Dog Kennel Lane, health services and playing pitches, with access improvements on Bills Lane. The site is within easy walking distance of Shirley station. The gap between the urban edge and Dickens Heath will shrink to about 300m from 600m, seen as the minimum necessary.

The human version (we wrote this, not the council)This section describes the parish of Hampton in Arden, which includes the villages of Hampton-in-Arden and Catherine-de-Barnes, divided by the M42. The area lies in the Green Belt known as the Meriden Gap. The villages share a primary school, library, doctor’s surgery and shops, and Hampton-in-Arden has a station on the West Coast Mainline. Because services are limited, growth should be kept to proportionate extensions so the school is not overwhelmed. Needs include better walking and cycling links, green space and health provision. A resolution to grant up to 95 dwellings at Land at Oak Farm was taken in May 2023, and 96 dwellings off Meriden Road are under construction.

The human version (we wrote this, not the council)This section describes Hockley Heath, a small village in the far south of the Borough, bisected by the A3400 Stratford Road. The parish has 1,900 people in some 770 households. The village has a small centre and a one-form entry primary school, but no doctors surgery. Growth is limited to small, proportionate extensions so the school is not overwhelmed. The Green Belt boundary will change, using the Stratford-upon-Avon Canal as the new southern edge. Needs include better school parking on School Road. Recent decisions include up to 99 dwellings south of School Road, up to 9 next to 84 School Road, and up to 80 west of Stratford Road.

The human version (we wrote this, not the council)This section describes Knowle, Dorridge and Bentley Heath, a town of around 19,300 people in some 7,900 households. It has a full range of facilities, including Arden Academy, so it is well placed for growth beyond its own needs. Brownfield land is very limited, so Green Belt release will be needed. Needs include better buses, possible decked parking at Dorridge railway station, highway works, walking and cycling links, a new primary school and land for the wider redevelopment of Arden Academy. On land formerly known as KN2, permission has been granted for up to 450 dwellings and up to 170 extra care units.

The human version (we wrote this, not the council)This section describes Meriden, a village about 9km east of Solihull Town Centre in the rural Meriden Gap. At the 2022 Census the parish had about 3,246 residents in 1,324 households. The village has a primary school, GP surgery, a small centre and two conservation areas. It is suitable for limited growth only, because of the Green Belt, its sensitive setting and the capacity of local services. New development should respond to the Meriden Neighbourhood Development Plan. Permission was granted in May 2024 for 75 affordable dwellings off Maxstoke Lane/Birmingham Road, and a small parcel nearby has a capacity of c10 dwellings. No further allocations are proposed.

The human version (we wrote this, not the council)This section describes the north of the Borough. Castle Bromwich and Marston Green are mature, largely built up suburbs with few development sites. Parts of North Solihull, covering Chelmsley Wood, Fordbridge and Kingshurst & Smith’s Wood, are among the 10% most deprived in the country. Since 2005 a regeneration programme has delivered more than 1,710 new homes on 40 sites. Future work focuses on brownfield sites, skills, access to jobs and better housing. Plans include a masterplan for Chelmsley Wood Town Centre and phased redevelopment of Kingshurst village centre. The Simon Digby site has permission for 177 affordable dwellings, and land around Marston Green station is a broad location.

The human version (we wrote this, not the council)This section describes Solihull Town Centre and the Mature Suburbs, including Elmdon, Hillfield, Lyndon, Monkspath, Olton, Shirley and Solihull. The suburbs are largely built up, with few brownfield sites or chances for major growth. The Town Centre is likely to see some restructuring, with room for more homes, as set out in the 2020 Solihull Town Centre Master plan. Redevelopment at Mell Square, to be known as Holbeche Place, has planning permission. Other aims include better walking, cycling and public transport into the Town Centre and reuse of older industrial estates. It is important that sites such as SO1, East of Solihull, are considered comprehensively to avoid piecemeal development.

The human version (we wrote this, not the council)This site allocation is for 770 dwellings East of Solihull, an urban extension close to Solihull Town Centre. The site sits behind homes on the northern side of Hampton Lane, with the Grand Union canal as its northern boundary and Field Lane to the east. Development should protect the setting of the Grade II listed Field Farm and 239 Lugtrout Lane. It should provide open space, play areas and homes for older people. The existing sports pitch, used by Coldlands Colts Boys FC, must be kept. Developers will contribute to education, health services and playing pitches, with highway works on Damson Parkway and Lugtrout Lane.

Policy SMBC/SO2

Moat Lane Depot

pp. 164–165

The human version (we wrote this, not the council)This site allocation is for 99 dwellings at Moat Lane Depot. It is a brownfield site in the urban area, made up of the existing Council depot and industrial estate, which are expected to become available during the Plan period. The site has good access to key services, facilities and public transport. Development should provide public open space, play areas and on site doorstep play. An integrated drainage, landscape and ecological strategy is needed to fix drainage issues and reduce surface water flooding. Developers will contribute to education, health services and playing pitches, and improve walking and cycling links to Solihull Town Centre.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.