← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull plan / Protecting Green Belt Land

From the plan

Protecting Green Belt Land

On pages 74 to 76 of the official PDF.

The human version

This section introduces the Green Belt chapter. Around two-thirds of the Borough is Green Belt, including the Meriden Gap between Birmingham/Solihull and Coventry. Pressure on the Green Belt comes from housing needs, a lack of vacant and derelict land, and needs for employment land, waste and minerals. Significant boundary changes are needed in the UK Central Hub Area and elsewhere, and the Council says exceptional circumstances are met. The 2024 NPPF brought in Grey Belt. A new Green Belt Assessment was published in July 2026. It found three areas of fundamental importance: the Meriden Gap, areas between towns, and land south and southwest of Solihull/Shirley.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 74

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Protecting Green Belt Land Introduction 302. Around two-thirds of the Brough is made up of land designated as Green Belt . There are few other places in the country where conurbations or cities the size of Birmingham/Solihull and Coventry are separated by Green Belt in quite the same way as occurs in the West Midlands. This strategically important area is known as the Meriden Gap. 303. National policy makes clear that established Green Belt boundaries should be altered only in exceptional circumstances and only when a local plan is being prepared or reviewed. It also describes the circumstances when built and other development should be considered as an exception to inappropriate development. 304. The pressure on the Green Belt in Solihull has been intensified by the requirement for development emerging from housing needs; the lack of vacant and derelict land in the Borough; and local requirements for employment land, waste management and mineral extraction. This is reflected both in the significant number of sites in the Green Belt in the SHELAA, and the paucity of sites in the urban area. 305. Significant adjustments to Green Belt boundaries are required in the UK Central Hub Area to provide an appropriate planning framework for the Council’s ambitions for the HS2 Interchange and adjoining area, and to meet the needs of the key economic assets within the area. Further significant adjustments are required elsewhere to meet local housing and employment land needs. Where land is to be deleted from the Green Belt as part of this Plan, exceptional circumstances are considered to be met to justify the change in boundaries, as required by the NPPF . National Planning Policy Changes 306. The 2024 NPPF saw what some have described as the most fundamental reform to Green Belt policy since it became a national planning policy in the 1950s. This included the introduction of the concept of Grey Belt 34 , and since then reforms in the 2026 NPPF have seen further significant amendment (for example in relation to development near to railway stations) which collectively means that Green Belt designation is less of a barrier to development than it once was. 34 See the glossary in this document for an explanation of how Grey Belt is defined. 307. These changes in national policy will either need to be directly addressed in this plan or will have an indirect impact as a result of how the determination of planning applications will be influenced by the new NPPF. Green Belt Assessment (GBA) 308. Given the significant changes to national Green Belt policy, it was considered that the Council’s 2016 GBA would not provide a suitable evidential basis for considering Green Belt matters and therefore a fresh GB A was undertaken, taking into account the 2024 NPPF and 2025 PPG. This culminated with the publication of the new GBA in July 2026. 309. The GBA considers all of the Green Belt in the Borough (at either a parcel or broad area level) and assesses the area in question against the five purposes of including land in the Green Belt, namely: A. to check the unrestricted sprawl of large built-up areas; B. to prevent neighbouring towns merging into one another; C. to assist in safeguarding the countryside from encroachment; D. to preserve the setting and special character of historic towns; and E. to assist in urban regeneration, by encouraging the recycling of derelict and other urban land. 310. National policy sets out that it is only purposes A, B and D that are to be taken into account when assessing whether land should be considered as Grey Belt or not. 311. The NPPF (paragraph 146) states that when considering whether exceptional circumstances exist, meeting needs can be such a circumstance and Green Belt boundaries should be reviewed: “to meet these needs in full, unless the review provides clear evidence that doing so would fundamentally undermine the purposes (taken together) of the remaining Green Belt, when considered across the area of the plan.” 312. To assist in assessing whether this test is met, the GBA sought to identify areas of fundamental importance. It noted 35: “Areas of ‘fundamental importance’ are those which perform a strategically important role against the Green Belt purposes within the context of the wider Green Belt across the plan area and are therefore considered the most sensitive to change. ” 313. The GBA went on to identify three such areas as follows: • Area of Green Belt within the Meriden Gap (Area 1) • Areas of Green Belt located between towns (Areas 2a and 2b) • Areas of Green Belt to the south and southwest of Solihull/Shirley (Area 3). 35 Section 6.1 314. These are indicated in figure 11 of the GBA which is reproduced below:
Green Belt & countrysideJobs & economyTransport & travel📍 Meriden📍 Shirley📍 Solihull
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.