← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull Plan Explorer

Meriden

12 sections of the plan, in document order.

The human version (we wrote this, not the council)This section introduces the new Solihull Local Plan. It notes that two thirds of the Borough is in the Green Belt, including the Meriden Gap that separates Solihull and the Birmingham conurbation from Coventry. The current plan was adopted in December 2013 and covers 2011 to 2028, but is now seen as largely out of date. A 2020 Draft Submission Plan was withdrawn in October 2024 after a long examination. This plan replaces the 2013 plan and the 2014 Gypsy and Traveller Site Allocations DPD. Without a plan, the Council could not show a 5-year land supply. Five neighbourhood plans have been made and remain part of the development plan.

The human version (we wrote this, not the council)This section sets out the vision for the plan. It links to the Council Plan 2025-30, approved in July 2025, whose vision is 'Solihull: a great place to live, work, invest and enjoy'. The planning vision says that by 2043 Solihull will have built on its reputation as an attractive place. It will have made the most of HS2 Interchange, with key assets such as Birmingham Airport, the NEC and JLR backed by transport links. The Borough will meet its local housing needs. It will keep its sense of identity, including protecting the Green Belt and the Meriden Gap. Action on the Climate Change emergency will run through everything.

Policy SMBC/E2

Arden Cross

pp. 59–61

The human version (we wrote this, not the council)This policy supports developing Arden Cross as the site of an exemplary high speed rail station, linked to Birmingham Airport and the NEC. Offices, homes, education uses and related retail, leisure and hotel uses of an appropriate scale will be supported. Land bounded by the M42, A452 and A45, shown as Site UK1, will be released from the Green Belt. Development should be comprehensive and coordinated. The site is some 140ha. The supporting text calls it a £3.2bn opportunity, with 400,000 to 600,000 sqm of commercial floorspace, including a University of Warwick HealthTech Campus. It also sets out the exceptional circumstances for removing the land from the Green Belt.

The human version (we wrote this, not the council)This section introduces the Green Belt chapter. Around two-thirds of the Borough is Green Belt, including the Meriden Gap between Birmingham/Solihull and Coventry. Pressure on the Green Belt comes from housing needs, a lack of vacant and derelict land, and needs for employment land, waste and minerals. Significant boundary changes are needed in the UK Central Hub Area and elsewhere, and the Council says exceptional circumstances are met. The 2024 NPPF brought in Grey Belt. A new Green Belt Assessment was published in July 2026. It found three areas of fundamental importance: the Meriden Gap, areas between towns, and land south and southwest of Solihull/Shirley.

The human version (we wrote this, not the council)This section explains how the Council will protect and improve the natural environment. It aims to protect landscape character, join up habitats and secure measurable gains in biodiversity. About two thirds of Solihull Borough is countryside, and the Borough lies within the Arden Landscape Character Area. The text names nature recovery work such as the Tame Valley Wetlands Nature Improvement Area and the emerging Meriden Gap Strategic Grassland Nature Improvement Area. The Council will ask for carbon valuation evidence where trees are removed, and will require compensation for trees and hedgerows that are not kept. It says a local policy is needed so Local Wildlife Sites can be designated.

The human version (we wrote this, not the council)This section describes Balsall Common and how it should grow. The town has around 7,000 people in some 2,900 households. It has secondary and primary schools, health services and shops, so it is well placed for growth beyond its own needs. Planned infrastructure includes the Balsall Common Relief Road in three phases, an enhanced centre, station parking, a new two form entry primary school at Barratt’s Farm and a sports hub. The Green Belt boundary will be amended, mainly using the west coast main line and HS2. Decisions include up to 970 dwellings at Barratt’s Farm and up to 110 at Frog Lane.

The human version (we wrote this, not the council)This section describes the parish of Hampton in Arden, which includes the villages of Hampton-in-Arden and Catherine-de-Barnes, divided by the M42. The area lies in the Green Belt known as the Meriden Gap. The villages share a primary school, library, doctor’s surgery and shops, and Hampton-in-Arden has a station on the West Coast Mainline. Because services are limited, growth should be kept to proportionate extensions so the school is not overwhelmed. Needs include better walking and cycling links, green space and health provision. A resolution to grant up to 95 dwellings at Land at Oak Farm was taken in May 2023, and 96 dwellings off Meriden Road are under construction.

The human version (we wrote this, not the council)This site allocation is for 100 dwellings at Meriden Road, Hampton in Arden. The site measures about 3.4 hectares and sits next to land allocated in the SLP 2013, and the two should ideally be linked. It would reuse a former ammunitions depot, which is a brownfield site. Development should keep TPO trees and hedgerows, place open space and play at its heart, and have higher density housing reducing towards the Green Belt edge. There should be no building in higher flood risk zones, and above ground SuDS are needed. Developers will contribute to education, health services and playing pitches, and improve walking and cycling links to the rail station.

The human version (we wrote this, not the council)This section describes Meriden, a village about 9km east of Solihull Town Centre in the rural Meriden Gap. At the 2022 Census the parish had about 3,246 residents in 1,324 households. The village has a primary school, GP surgery, a small centre and two conservation areas. It is suitable for limited growth only, because of the Green Belt, its sensitive setting and the capacity of local services. New development should respond to the Meriden Neighbourhood Development Plan. Permission was granted in May 2024 for 75 affordable dwellings off Maxstoke Lane/Birmingham Road, and a small parcel nearby has a capacity of c10 dwellings. No further allocations are proposed.

The human version (we wrote this, not the council)This section describes Solihull Town Centre and the Mature Suburbs, including Elmdon, Hillfield, Lyndon, Monkspath, Olton, Shirley and Solihull. The suburbs are largely built up, with few brownfield sites or chances for major growth. The Town Centre is likely to see some restructuring, with room for more homes, as set out in the 2020 Solihull Town Centre Master plan. Redevelopment at Mell Square, to be known as Holbeche Place, has planning permission. Other aims include better walking, cycling and public transport into the Town Centre and reuse of older industrial estates. It is important that sites such as SO1, East of Solihull, are considered comprehensively to avoid piecemeal development.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.