← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull Plan Explorer

Shirley

10 sections of the plan, in document order.

The human version (we wrote this, not the council)This section describes the Borough. Solihull sits on the southern edge of the West Midlands conurbation, between Birmingham and the Black Country to the west and Coventry to the east. Its motto is "Urbs in Rure", or town in country. It has strong transport links, including the M42 and Birmingham Airport. The section outlines how towns and villages grew over time. In 2023 the population was 218,793. The economy supports around 145,000 jobs and produces goods and services worth £10.72 (bn). Around two thirds of the Borough's 17,800 hectares is countryside and Green Belt. However, 41% of North Solihull residents live in the 10% most deprived areas of England.

The human version (we wrote this, not the council)This policy sets out the settlement hierarchy for the Borough in four levels. The Urban Area includes Solihull, Shirley, the UK Central Hub area and North Solihull. The towns are Balsall Common and Knowle, Dorridge & Bentley Heath. The larger villages are Cheswick Green, Dickens Heath, Hampton in Arden, Hockley Heath and Meriden. All other rural settlements are smaller villages and other settlements. The text that follows introduces vulnerable gaps. It explains that the gaps between smaller rural settlements can be narrow, especially in the Blythe area, where four settlements sit close together. Even modest building there could cause them to merge.

Policy SMBC/HO2

Broad Locations

pp. 28–37

The human version (we wrote this, not the council)This policy covers broad locations for development shown on the Policies Map. Proposals there will be supported in principle if they fit the spatial strategy, take a joined-up approach, provide or fund infrastructure and deal with environmental harm. Broad locations are not site allocations, and adopting the plan does not remove their Green Belt status. Boundaries will change only through a later local plan, a neighbourhood plan or a Supplementary Plan. The section also sets Local Housing Need at 1,289 dwellings per annum, or 21,913 over the plan period, against a supply of 23,091. Broad locations add 8,219 homes, including land within 1,000m of railway stations.

The human version (we wrote this, not the council)This section introduces the Green Belt chapter. Around two-thirds of the Borough is Green Belt, including the Meriden Gap between Birmingham/Solihull and Coventry. Pressure on the Green Belt comes from housing needs, a lack of vacant and derelict land, and needs for employment land, waste and minerals. Significant boundary changes are needed in the UK Central Hub Area and elsewhere, and the Council says exceptional circumstances are met. The 2024 NPPF brought in Grey Belt. A new Green Belt Assessment was published in July 2026. It found three areas of fundamental importance: the Meriden Gap, areas between towns, and land south and southwest of Solihull/Shirley.

The human version (we wrote this, not the council)This section sets out the Council's vision-led approach to transport, which replaces the older 'predict and provide' method. The vision is of places where people can live without depending on their cars. Proposals should link into existing travel networks, give safe routes for active travel, help people with reduced mobility and reduce the need to travel. Proposals that generate a significant rise in trips need a transport assessment or statement and should be in sustainable locations. The section describes the transport strategy Solihull Connected (adopted 2023) and its four objectives, and the Cycling and Walking Strategy. It says no further local policy is needed beyond NDMP TR3.

The human version (we wrote this, not the council)This section sets out why the historic environment matters to the Borough's character and civic pride. It lists features that add most to local character, including the historic core of Solihull Town Centre, the Mature Suburbs, the Arden landscape and historic villages such as Berkswell, Barston and Temple Balsall, and the canal and railway network. The Council's strategy is to sustain and enhance heritage assets and tackle risks from neglect and decay. It will keep a Local Heritage List, Conservation Area Appraisals and Management Plans, and a public Historic Environment Record. National policies HE4 to HE10 provide the basis for judging applications.

The human version (we wrote this, not the council)This section describes the Blythe area, made up of the parishes of Dickens Heath, Cheswick Green and Tidbury Green. These are distinct villages separated by countryside and Green Belt, and bus services are poor. Cheswick Green and Tidbury Green will be inset from the Green Belt. Needs include better buses, walking and cycling links to Whitlock’s End station, highway works and a new two-form entry primary school at Land South of Dog Kennel Lane. A new secondary school may be needed. Green Belt release will be required. Recent decisions include up to 1,250 dwellings at Land South of Dog Kennel Lane.

The human version (we wrote this, not the council)This site allocation is for 450 dwellings at Whitlock’s End Farm. Development should respect the setting of the Grade II Whitlocks End Farm, keep trees and hedgerows along bridleways and footpaths, and provide open space, play areas, homes for older people and 5% self and custom build plots. Developers will contribute to a new 2-form primary school at Land South of Dog Kennel Lane, health services and playing pitches, with access improvements on Bills Lane. The site is within easy walking distance of Shirley station. The gap between the urban edge and Dickens Heath will shrink to about 300m from 600m, seen as the minimum necessary.

The human version (we wrote this, not the council)This section describes Hockley Heath, a small village in the far south of the Borough, bisected by the A3400 Stratford Road. The parish has 1,900 people in some 770 households. The village has a small centre and a one-form entry primary school, but no doctors surgery. Growth is limited to small, proportionate extensions so the school is not overwhelmed. The Green Belt boundary will change, using the Stratford-upon-Avon Canal as the new southern edge. Needs include better school parking on School Road. Recent decisions include up to 99 dwellings south of School Road, up to 9 next to 84 School Road, and up to 80 west of Stratford Road.

The human version (we wrote this, not the council)This section describes Solihull Town Centre and the Mature Suburbs, including Elmdon, Hillfield, Lyndon, Monkspath, Olton, Shirley and Solihull. The suburbs are largely built up, with few brownfield sites or chances for major growth. The Town Centre is likely to see some restructuring, with room for more homes, as set out in the 2020 Solihull Town Centre Master plan. Redevelopment at Mell Square, to be known as Holbeche Place, has planning permission. Other aims include better walking, cycling and public transport into the Town Centre and reuse of older industrial estates. It is important that sites such as SO1, East of Solihull, are considered comprehensively to avoid piecemeal development.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.