← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull plan / SMBC/BC5

Site allocation SMBC/BC5

Trevallion Stud

On pages 120 to 121 of the official PDF.

The human version

This site allocation is for 310 dwellings at Trevallion Stud in Balsall Common. It covers the stud farm and some nearby parcels, much of which is previously developed land. The area bounded by Kenilworth Road and Wootton Green Lane would be removed from the Green Belt. Development should include public open space, play areas, retained trees and hedgerows, above ground SuDS and 5% of open market homes as self and custom build plots. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. Walking and cycling links towards Berkswell rail station and Balsall Common centre should be improved.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 120

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy SMBC/BC5: Trevallion Stud 1. The site is allocated for 310 dwellings 2. Development of the site should include: A Provision of public open space and a range of play areas for children and young people in accordance with the Open Space Assessment and future revisions. B Trees and hedgerows along to be retained. C 5% of open market dwellings to be provided in the form of Self and Custom Build Plots in accordance with Policy SMBC/HO4. D Provision of above ground SuDS features. 3. Likely infrastructure requirements will include: A Developer contributions to education provision. B Developer contributions to primary and secondary care health services in conjunction with Birmingham and Solihull Integrated Care Board (BSOL ICB). C A proportionate contribution towards the Balsall Common Multi Modal Package (incorporating the Balsall Common Relief Road) calculated in accordance with the Council’s March 2025 Position Statement. D Appropriate measures to promote and enhance sustainable modes of transport including pedestrian and cycle connectivity towards Berkswell rail station, Balsall Common centre and Balsall Common health centre. E Financial contribution to provision of new playing pitches and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy. 524. This site is focussed on the land associated with the stud farm, but it also includes some adjacent parcels, much of which is previously developed and included on the BLR. The area to be removed from the Green Belt would be that bounded by Kenilworth Road and Wootton Green Lane. It would use strong, defensible boundaries to establish the extent of the Green Belt. 525. Although this is in a wider parcel assessed in the Green Belt Assessment (2016) as making a strong contribution to Green Belt purposes, it is considered that due to the presence of built 49 Undertaken for the 2020 plan. development and encroachment in this part of the parcel that this smaller area actually performs less well in its own right. A large part of this area is included on the Council’s BLR. 526. The site is located in an area with very low capacity to accommodate change in the Landscape Character Assessment, 2016, although as it is substantially brownfield, its contribution to the character of the landscape area is more limited. It has overall medium accessibility, with very high accessibility to a food store.
Health, schools & communitySite allocationsTransport & travel📍 Balsall Common📍 Berkswell📍 Solihull
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.