The human version (we wrote this, not the council)
This site allocation is for 92 dwellings at Lavender Hall Farm in Balsall Common. It covers previously developed land behind the farm, north-west of the fishing lakes. Development should include public open space, play areas, retained trees and hedgerows, easy walking and cycling access to the rail station, and above ground SuDS. It should also protect the setting of nearby heritage assets and provide a buffer between new homes and both the existing railway line and HS2. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. The HS2 line will separate the site from the wider Green Belt.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy SMBC/BC6: Lavender Hall Farm
1. The site is allocated for 92 dwellings
2. Development of the site should include:
A Provision of public open space and a range of play areas for children and young
people in accordance with the Open Space Assessment and future revisions.
B Trees and hedgerows along to be retained.
C Facilitating easy access by walking and cycling to the rail station and other
facilities,
D Provision of above ground SuDS features.
E Protection of the setting of heritage assets adjacent the site.
F Provision of a buffer between new housing and both the existing railway line
and HS2.
3. Likely infrastructure requirements will include:
A Developer contributions to education provision.
B Developer contributions to primary and secondary care health services in
conjunction with Birmingham and Solihull Integrated Care Board (BSOL ICB).
C A proportionate contribution towards the Balsall Common Multi Modal
Package (incorporating the Balsall Common Relief Road) calculated in
accordance with the Council’s March 2025 Position Statement.
D Appropriate measures to promote and enhance sustainable modes of
transport including pedestrian and cycle connectivity towards Berkswell rail
station, Balsall Common centre and Balsall Common health centre.
E Financial contribution to provision of new playing pitches and contributions to
enhancement of existing recreational facilities, to accord with the
requirements identified in the Playing Pitch Mitigation Strategy.
527. This site is focussed on the previously developed land part of the site that sits behind Lavender
Hall Farm itself, to the north-west of the fishing lakes.
528. Although the site sits in a strongly performing broad area parcel within the Green Belt
Assessment, 2026 the HS2 line will provide a new feature separating the site from the wider
Green Belt that will remain to the northeast. It is considered that, due to the presence of built
development and encroachment in this part of the parcel, this smaller area actually performs
less well in its own right. A large part of this area is included on the Council’s BLR.
529. The site is located in an area with very low capacity to accommodate change in the Landscape
Character Assessment, 2016, although as it is brownfield, its contribution to the character of
the landscape area is more limited. It has medium high accessibility , with footpath access to
the rail station and medical practice.
SLP Site 19 – Riddings Hill/Hallmeadow Road (capacity 65)
530. The adopted Solihull Local Plan (2013) allocated this 1.6ha site off Hallmeadow
Road/Riddings Hill for development of approximately 65 dwellings. The 2013 amended the
Green Belt boundary to accommodate this site and the wider changes to Green Belt
boundaries around the settlement noted above will also see the adjacent heath centre being
removed from the Green Belt.
531. As the 2013 plan will fall away when this plan is adopted, it is considered necessary to include
an allocation policy for this site as follows.