The human version (we wrote this, not the council)
This site allocation is for 100 dwellings at Meriden Road, Hampton in Arden. The site measures about 3.4 hectares and sits next to land allocated in the SLP 2013, and the two should ideally be linked. It would reuse a former ammunitions depot, which is a brownfield site. Development should keep TPO trees and hedgerows, place open space and play at its heart, and have higher density housing reducing towards the Green Belt edge. There should be no building in higher flood risk zones, and above ground SuDS are needed. Developers will contribute to education, health services and playing pitches, and improve walking and cycling links to the rail station.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy SMBC/HA1: Meriden Road, Hampton in Arden
1. The site is allocated for 100 dwellings
2. Development of this site should be consistent with the following principles:
A Retention of TPO trees and established hedgerows;
B Provision of public open space and play facilities at the heart of the
development;
C P rotection of the local landscape, ecology and drainage assets;
D Perimeter block development to maximise natural surveillance and encourage
active streets and views over the countryside;
E Higher density housing reducing towards the edge of the Green Belt;
F Facilitating easy access by walking through the site and into the countryside.
G No development within any area of higher flood risk zones
H Provision of above ground SuDS features
3. Likely infrastructure requirements will include:
A Financial contribution to education provision as required by the Local
Education Authority;
B Developer contributions to primary and secondary care health services in
conjunction with Birmingham and Solihull Integrated Care Board (BSOL ICB).
C Consideration to realigning the surface water flood risk within the site to
continue in a west to east direction through the POS to the receiving floodplain;
D Appropriate measures to promote and enhance sustainable modes of
transport including pedestrian and cycle connectivity towards Hampton in
Arden rail station, shops and health centre;
E Financial contribution to provision of new playing pitches and contributions to
enhancement of existing recreational facilities, to accord with the
requirements identified in the Playing Pitch Mitigation Strategy.
Justification
605. This site sits adjacent to that allocated in the SLP 2013 and they should ideally be linked in a
comprehensive manner. This will help improve connectivity between the new developments
and maximise the effectiveness and efficiency of new infrastructure. It provides an
opportunity to re-use the former ammunitions depot which is a brownfield site (and is included
on the Council’s BLR). Open space provision serving the development as a whole will be an
important consideration.
606. The parcel of land immediately east of the village is a moderately performing parcel in Green
Belt terms. The land has low capacity to accommodate change in the Landscape Character
Assessment, 2016. The site has medium accessibility and is close to the rail station. A large
part of this area is included on the Council’s BLR.
607. The Level 2 Strategic Flood Risk Assessment identifies surface water flood risk within the site
and highlights the opportunity for realigning the flood risk east to west through the area of
green infrastructure.
608. This allocation measures approximately 3.4 hectares. The site lies within the Arden landscape
character area and is on the urban fringe. The site is well screened to the boundaries so views
in are screened by existing vegetation although glimpses can be se en through the tree cover
especially in the winter months
Site SO1 – East of Solihull
609. Whilst this site is located within the Parish boundary of Hampton-in-Arden and Catherine-de-
Barnes, it functions as part of the urban area rather than as an expansion of one of the parish’s
villages. It is therefore not included within this chapter and is dealt with under the Solihull
chapter.
610. The capacity from this site, together with other allocations in this plan, and the site under
construction from the SLP , will see over 1,000 dwellings being accommodated within the
parish on allocated sites.
Broad locations54
HA3 - Land around Hampton in Arden Railway Station
611. NDMPs S5 (1)(h): Principle of development outside settlement and GB7 (1 )(h): Development
which is not inappropriate in the Green Belt, now support development within reasonable
54 See Policy SMBC/HO2: Broad Locations for the policy wording relating to these areas.
walking distances of railway stations and as such development consistent with these national
policies can be expected to come forward in this settlement. This will include development
around Hampton in Arden station and as such it is included as a broad location in this plan.
For the reasons outlined earlier in this chapter development associated with this broad
location in particular will benefit from comprehensive masterplanning.