← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull plan / SMBC/HA1

Site allocation SMBC/HA1

Meriden Road, Hampton in Arden

On pages 135 to 137 of the official PDF.

The human version

This site allocation is for 100 dwellings at Meriden Road, Hampton in Arden. The site measures about 3.4 hectares and sits next to land allocated in the SLP 2013, and the two should ideally be linked. It would reuse a former ammunitions depot, which is a brownfield site. Development should keep TPO trees and hedgerows, place open space and play at its heart, and have higher density housing reducing towards the Green Belt edge. There should be no building in higher flood risk zones, and above ground SuDS are needed. Developers will contribute to education, health services and playing pitches, and improve walking and cycling links to the rail station.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 135

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy SMBC/HA1: Meriden Road, Hampton in Arden 1. The site is allocated for 100 dwellings 2. Development of this site should be consistent with the following principles: A Retention of TPO trees and established hedgerows; B Provision of public open space and play facilities at the heart of the development; C P rotection of the local landscape, ecology and drainage assets; D Perimeter block development to maximise natural surveillance and encourage active streets and views over the countryside; E Higher density housing reducing towards the edge of the Green Belt; F Facilitating easy access by walking through the site and into the countryside. G No development within any area of higher flood risk zones H Provision of above ground SuDS features 3. Likely infrastructure requirements will include: A Financial contribution to education provision as required by the Local Education Authority; B Developer contributions to primary and secondary care health services in conjunction with Birmingham and Solihull Integrated Care Board (BSOL ICB). C Consideration to realigning the surface water flood risk within the site to continue in a west to east direction through the POS to the receiving floodplain; D Appropriate measures to promote and enhance sustainable modes of transport including pedestrian and cycle connectivity towards Hampton in Arden rail station, shops and health centre; E Financial contribution to provision of new playing pitches and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy. Justification 605. This site sits adjacent to that allocated in the SLP 2013 and they should ideally be linked in a comprehensive manner. This will help improve connectivity between the new developments and maximise the effectiveness and efficiency of new infrastructure. It provides an opportunity to re-use the former ammunitions depot which is a brownfield site (and is included on the Council’s BLR). Open space provision serving the development as a whole will be an important consideration. 606. The parcel of land immediately east of the village is a moderately performing parcel in Green Belt terms. The land has low capacity to accommodate change in the Landscape Character Assessment, 2016. The site has medium accessibility and is close to the rail station. A large part of this area is included on the Council’s BLR. 607. The Level 2 Strategic Flood Risk Assessment identifies surface water flood risk within the site and highlights the opportunity for realigning the flood risk east to west through the area of green infrastructure. 608. This allocation measures approximately 3.4 hectares. The site lies within the Arden landscape character area and is on the urban fringe. The site is well screened to the boundaries so views in are screened by existing vegetation although glimpses can be se en through the tree cover especially in the winter months Site SO1 – East of Solihull 609. Whilst this site is located within the Parish boundary of Hampton-in-Arden and Catherine-de- Barnes, it functions as part of the urban area rather than as an expansion of one of the parish’s villages. It is therefore not included within this chapter and is dealt with under the Solihull chapter. 610. The capacity from this site, together with other allocations in this plan, and the site under construction from the SLP , will see over 1,000 dwellings being accommodated within the parish on allocated sites. Broad locations54 HA3 - Land around Hampton in Arden Railway Station 611. NDMPs S5 (1)(h): Principle of development outside settlement and GB7 (1 )(h): Development which is not inappropriate in the Green Belt, now support development within reasonable 54 See Policy SMBC/HO2: Broad Locations for the policy wording relating to these areas. walking distances of railway stations and as such development consistent with these national policies can be expected to come forward in this settlement. This will include development around Hampton in Arden station and as such it is included as a broad location in this plan. For the reasons outlined earlier in this chapter development associated with this broad location in particular will benefit from comprehensive masterplanning.
Flooding & waterSite allocationsTransport & travel📍 Hampton in Arden📍 Meriden📍 Solihull
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.