← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull Plan Explorer

Hampton in Arden

11 sections of the plan, in document order.

The human version (we wrote this, not the council)This section introduces the new Solihull Local Plan. It notes that two thirds of the Borough is in the Green Belt, including the Meriden Gap that separates Solihull and the Birmingham conurbation from Coventry. The current plan was adopted in December 2013 and covers 2011 to 2028, but is now seen as largely out of date. A 2020 Draft Submission Plan was withdrawn in October 2024 after a long examination. This plan replaces the 2013 plan and the 2014 Gypsy and Traveller Site Allocations DPD. Without a plan, the Council could not show a 5-year land supply. Five neighbourhood plans have been made and remain part of the development plan.

The human version (we wrote this, not the council)This section describes the Borough. Solihull sits on the southern edge of the West Midlands conurbation, between Birmingham and the Black Country to the west and Coventry to the east. Its motto is "Urbs in Rure", or town in country. It has strong transport links, including the M42 and Birmingham Airport. The section outlines how towns and villages grew over time. In 2023 the population was 218,793. The economy supports around 145,000 jobs and produces goods and services worth £10.72 (bn). Around two thirds of the Borough's 17,800 hectares is countryside and Green Belt. However, 41% of North Solihull residents live in the 10% most deprived areas of England.

The human version (we wrote this, not the council)This section explains where development will go. The 2020 plan used a 'balanced dispersal' approach, mixing growth in a few large locations with growth spread over more places. Around 75% of residents live in the urban area, but land there is very limited, so Green Belt options were also needed. The 2026 NPPF promotes growth around railway stations, which the section says still fits this approach. Development will focus on the urban edge, towns, larger villages and land near suitable railway stations. Isolated development will be discouraged. A settlement hierarchy assessment adopted in October 2025 found Balsall Common and Knowle, Dorridge and Bentley Heath should be treated as towns.

The human version (we wrote this, not the council)This policy sets out the settlement hierarchy for the Borough in four levels. The Urban Area includes Solihull, Shirley, the UK Central Hub area and North Solihull. The towns are Balsall Common and Knowle, Dorridge & Bentley Heath. The larger villages are Cheswick Green, Dickens Heath, Hampton in Arden, Hockley Heath and Meriden. All other rural settlements are smaller villages and other settlements. The text that follows introduces vulnerable gaps. It explains that the gaps between smaller rural settlements can be narrow, especially in the Blythe area, where four settlements sit close together. Even modest building there could cause them to merge.

Policy SMBC/HO2

Broad Locations

pp. 28–37

The human version (we wrote this, not the council)This policy covers broad locations for development shown on the Policies Map. Proposals there will be supported in principle if they fit the spatial strategy, take a joined-up approach, provide or fund infrastructure and deal with environmental harm. Broad locations are not site allocations, and adopting the plan does not remove their Green Belt status. Boundaries will change only through a later local plan, a neighbourhood plan or a Supplementary Plan. The section also sets Local Housing Need at 1,289 dwellings per annum, or 21,913 over the plan period, against a supply of 23,091. Broad locations add 8,219 homes, including land within 1,000m of railway stations.

The human version (we wrote this, not the council)This section sets out why the historic environment matters to the Borough's character and civic pride. It lists features that add most to local character, including the historic core of Solihull Town Centre, the Mature Suburbs, the Arden landscape and historic villages such as Berkswell, Barston and Temple Balsall, and the canal and railway network. The Council's strategy is to sustain and enhance heritage assets and tackle risks from neglect and decay. It will keep a Local Heritage List, Conservation Area Appraisals and Management Plans, and a public Historic Environment Record. National policies HE4 to HE10 provide the basis for judging applications.

The human version (we wrote this, not the council)This section describes Balsall Common and how it should grow. The town has around 7,000 people in some 2,900 households. It has secondary and primary schools, health services and shops, so it is well placed for growth beyond its own needs. Planned infrastructure includes the Balsall Common Relief Road in three phases, an enhanced centre, station parking, a new two form entry primary school at Barratt’s Farm and a sports hub. The Green Belt boundary will be amended, mainly using the west coast main line and HS2. Decisions include up to 970 dwellings at Barratt’s Farm and up to 110 at Frog Lane.

The human version (we wrote this, not the council)This section describes the parish of Hampton in Arden, which includes the villages of Hampton-in-Arden and Catherine-de-Barnes, divided by the M42. The area lies in the Green Belt known as the Meriden Gap. The villages share a primary school, library, doctor’s surgery and shops, and Hampton-in-Arden has a station on the West Coast Mainline. Because services are limited, growth should be kept to proportionate extensions so the school is not overwhelmed. Needs include better walking and cycling links, green space and health provision. A resolution to grant up to 95 dwellings at Land at Oak Farm was taken in May 2023, and 96 dwellings off Meriden Road are under construction.

The human version (we wrote this, not the council)This site allocation is for 100 dwellings at Meriden Road, Hampton in Arden. The site measures about 3.4 hectares and sits next to land allocated in the SLP 2013, and the two should ideally be linked. It would reuse a former ammunitions depot, which is a brownfield site. Development should keep TPO trees and hedgerows, place open space and play at its heart, and have higher density housing reducing towards the Green Belt edge. There should be no building in higher flood risk zones, and above ground SuDS are needed. Developers will contribute to education, health services and playing pitches, and improve walking and cycling links to the rail station.

The human version (we wrote this, not the council)This section describes Solihull Town Centre and the Mature Suburbs, including Elmdon, Hillfield, Lyndon, Monkspath, Olton, Shirley and Solihull. The suburbs are largely built up, with few brownfield sites or chances for major growth. The Town Centre is likely to see some restructuring, with room for more homes, as set out in the 2020 Solihull Town Centre Master plan. Redevelopment at Mell Square, to be known as Holbeche Place, has planning permission. Other aims include better walking, cycling and public transport into the Town Centre and reuse of older industrial estates. It is important that sites such as SO1, East of Solihull, are considered comprehensively to avoid piecemeal development.

The human version (we wrote this, not the council)This site allocation is for 770 dwellings East of Solihull, an urban extension close to Solihull Town Centre. The site sits behind homes on the northern side of Hampton Lane, with the Grand Union canal as its northern boundary and Field Lane to the east. Development should protect the setting of the Grade II listed Field Farm and 239 Lugtrout Lane. It should provide open space, play areas and homes for older people. The existing sports pitch, used by Coldlands Colts Boys FC, must be kept. Developers will contribute to education, health services and playing pitches, with highway works on Damson Parkway and Lugtrout Lane.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.