Policy SMBC/TM1

Rapid Transit

On pages 84 to 85 of the official PDF.

The human version

This policy supports in principle the delivery of Metro and Sprint rapid transit lines, especially along three corridors serving the UK Central Hub. These run from Digbeth and the east of Birmingham, from Blythe Valley through central Solihull to Chelmsley Wood, and from Hall Green through central Solihull. Development in or next to these corridors will be asked to contribute to Metro or Sprint and to design in access from the start. The supporting text notes HS2 is expected to open between 2036-39, and that the HS2 Act limits how plan policies apply. It also says an alternative route for Balsall Common traffic is justified.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 84

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy SMBC/TM1: Rapid Transit 1 The Council will support the principle of proposals for the delivery of Metro and Sprint as part of a network of rapid-transit lines across the West Midlands, particularly along the following corridors in the Borough that provide access to UK Central Hub: A From Digbeth and the east of Birmingham to UK Central Hub. B From Blythe Valley to central Solihull, UK Central Hub and Chelmsley Wood. C From Hall Green to central Solihull and UK Central Hub. 2 Where development proposals sit either within or adjacent to these corridors, they will be requested to contribute towards the delivery of Metro or Sprint (as appropriate). In addition, developments will be expected to design in access opportunities to ensure connectivity to rapid transit infrastructure is maximised from the outset. Rapid Transit 351. An efficient and accessible inter-connected rapid -transit network can play a vital role in improving the current transport system both locally and regionally whilst accommodating forecast increases in travel demand. The network can also help support wider urban regeneration and, in a more local context, go some way to reducing the transport severance between North and South Solihull. High Speed 2 Rail 352. The HS2 Act received Royal Assent in February 2017, with the Notice to Proceed issued in April 2020 and construction works are now underway; with the line expected to be open between 2036-39. 353. The Act provides the powers and land necessary to construct and operate High Speed 2. Detailed matters relating to design and construction arrangements will be submitted to, and considered by, the Council as the approval body (termed ‘Qualifying Authority’) under the HS2 Planning Regime. 354. However, the Act also ‘disapplies’ many aspects of national, regional and local legislation and policy, replacing it with that which is more directly relevant to the design and delivery of the railway. Specific grounds are set out upon which HS2 related applications can be considered, conditioned or refused; meaning that the policies set out in this Plan cannot be applied by the Council in the usual manner when considering such applications. 355. The Council will continue to work with HS2 Ltd on measures to minimise impacts on communities and the environment as a result of the construction of the railway and associated infrastructure. 356. Other policies in the plan (most notably Policy SMBC/E1), provide the policy framework for considering development proposals associated with the railway, such that no further policies are required in this chapter. Bypass Improvement Lines 357. The 2006 UDP sought to safeguard the lines of three longstanding potential by- passes to Balsall Common, Hockley Heath and Knowle. The 2013 SLP concluded that the need to retain safeguarding of the lines was no longer justified. In relation to Hockley Heath and Knowle, there is nothing to suggest that this conclusion needs to be revisited. However, this is not the case in relation to Balsall Common. 358. The traffic associated with the HS2 Interchange site (and wider Hub area), and growth potential south of Coventry, especially when combined with traffic generated from new housing in the area, is likely to have an effect on the A452 as it passes through Balsall Common. This justifies the provision of an alternative route that could accommodate through traffic and provide a basis for new residential developments to access the network in an appropriate manner. The Balsall Common settlement chapter gives more detail in relation to this.
Infrastructure & utilitiesTransport & travel📍 Balsall Common📍 Blythe Valley📍 Chelmsley Wood📍 Hockley Heath📍 Knowle📍 Solihull
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.