The human version (we wrote this, not the council)
This policy supports in principle the delivery of Metro and Sprint rapid transit lines, especially along three corridors serving the UK Central Hub. These run from Digbeth and the east of Birmingham, from Blythe Valley through central Solihull to Chelmsley Wood, and from Hall Green through central Solihull. Development in or next to these corridors will be asked to contribute to Metro or Sprint and to design in access from the start. The supporting text notes HS2 is expected to open between 2036-39, and that the HS2 Act limits how plan policies apply. It also says an alternative route for Balsall Common traffic is justified.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy SMBC/TM1: Rapid Transit
1 The Council will support the principle of proposals for the delivery of Metro and Sprint
as part of a network of rapid-transit lines across the West Midlands, particularly along
the following corridors in the Borough that provide access to UK Central Hub:
A From Digbeth and the east of Birmingham to UK Central Hub.
B From Blythe Valley to central Solihull, UK Central Hub and Chelmsley Wood.
C From Hall Green to central Solihull and UK Central Hub.
2 Where development proposals sit either within or adjacent to these corridors, they will
be requested to contribute towards the delivery of Metro or Sprint (as appropriate). In
addition, developments will be expected to design in access opportunities to ensure
connectivity to rapid transit infrastructure is maximised from the outset.
Rapid Transit
351. An efficient and accessible inter-connected rapid -transit network can play a vital role in
improving the current transport system both locally and regionally whilst accommodating
forecast increases in travel demand. The network can also help support wider urban
regeneration and, in a more local context, go some way to reducing the transport severance
between North and South Solihull.
High Speed 2 Rail
352. The HS2 Act received Royal Assent in February 2017, with the Notice to Proceed issued in April
2020 and construction works are now underway; with the line expected to be open between
2036-39.
353. The Act provides the powers and land necessary to construct and operate High Speed 2.
Detailed matters relating to design and construction arrangements will be submitted to, and
considered by, the Council as the approval body (termed ‘Qualifying Authority’) under the HS2
Planning Regime.
354. However, the Act also ‘disapplies’ many aspects of national, regional and local legislation and
policy, replacing it with that which is more directly relevant to the design and delivery of the
railway. Specific grounds are set out upon which HS2 related applications can be considered,
conditioned or refused; meaning that the policies set out in this Plan cannot be applied by the
Council in the usual manner when considering such applications.
355. The Council will continue to work with HS2 Ltd on measures to minimise impacts on
communities and the environment as a result of the construction of the railway and associated
infrastructure.
356. Other policies in the plan (most notably Policy SMBC/E1), provide the policy framework for
considering development proposals associated with the railway, such that no further policies
are required in this chapter.
Bypass Improvement Lines
357. The 2006 UDP sought to safeguard the lines of three longstanding potential by- passes to
Balsall Common, Hockley Heath and Knowle. The 2013 SLP concluded that the need to retain
safeguarding of the lines was no longer justified. In relation to Hockley Heath and Knowle,
there is nothing to suggest that this conclusion needs to be revisited. However, this is not the
case in relation to Balsall Common.
358. The traffic associated with the HS2 Interchange site (and wider Hub area), and growth potential
south of Coventry, especially when combined with traffic generated from new housing in the
area, is likely to have an effect on the A452 as it passes through Balsall Common. This justifies
the provision of an alternative route that could accommodate through traffic and provide a
basis for new residential developments to access the network in an appropriate manner. The
Balsall Common settlement chapter gives more detail in relation to this.