← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / 10 Transport and Connectivity

From the plan

10 Transport and Connectivity

On page 216 of the official PDF.

The human version

This section introduces the transport chapter. It says Southend sits on a peninsula at the mouth of the Thames Estuary, with a mainly east to west transport corridor. The main roads are the A127 and A13/A1159, linking to the M25, the Dartford River Crossing and the A130. Two railway lines, the c2c line and the Great Eastern main line, link the city to London, and there are nine railway stations in the area. North to south links are limited, especially by public transport. Road congestion affects the economy and tourism, car ownership is just over one car per household, and electric charging points are limited.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 216

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

10. Transport and Connectivity Strategic Policy 10.1 The transport connectivity of Southend is dictated by the geography of the area, the city being located on a peninsula at the mouth of the Thames Estuary with a predominantly east – west transport corridor. Where we are now ● The strategic highway network serving Southend is provided by the A127 and A13/A1159, with links to the London orbital M25 and Dartford River Crossing, and A130 to Canvey Island and to Chelmsford; ● Two railway lines link the city to London and the national network, namely the c2c line to London Fenchurch Street and the Great Eastern main line to London Liverpool Street, which provide links to the Elizabeth Line at Shenfield and High-Speed Rail at Stratford; ● There are nine railway stations within the local authority area while Southend Airport station is just outside within Rochford District; ● London Southend Airport is partly located in the city with much of the runway and infrastructure within neighbouring Rochford District; ● North-south links exist but are limited, especially by public transport; ● Bus services operate on a commercial basis, with frequent services on key corridors and with more limited services elsewhere; ● Congestion on the road network impacts on the local economy and tourism industry and the ability to re-allocate road space to other users including cyclists and buses; ● There are significant variations between neighbourhoods, although generally car ownership is low across the city with just over one car per household; ● A comprehensive network of attractive linked corridors is required to encourage people to walk and use their bikes more and become more active and promote inclusive access; ● Provision of electric charging points is limited. Where we want to be Strategic Objective 1 Strategic Objective 20 Strategic Objective 21 Strategic Objective 22 Strategic Objective 23 Strategic Objective 24 Key Supporting Documents Key supporting documents that underpin the policies are available on the Council’s Evidence Documents | Southend Local Plan , particular under the heading ‘Providing for a sustainable transport system’.
Health, schools & communityTransport & travel📍 London Southend Airport📍 Rochford📍 Southend
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.