The human version (we wrote this, not the council)
This section sets out Southend's context and main issues. The city boundary tightly abuts the urban area and the countryside around it is Green Belt, so land is very limited. Southend has 83,500 dwellings housing 182,000 people, and the Government Standard Method says 1,405 new homes are needed each year. There are around 80,000 jobs, and 86% of companies employ 10 staff or fewer. The resort draws around 7 million day visitors and over 200,000 staying visitors a year. The section also covers seven miles of foreshore, over 500 hectares of green space, flood risk, congestion on the A127 and A13, and the Airport's recovery after Covid-19.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
2. About Southend
Southend Today – context and issues
a. About Southend – Southend’s administrative boundary tightly abuts
the existing urban area, and the surrounding open countryside is
designated as forming part of the wider Metropolitan Green Belt
stretching from east London across South Essex. These factors mean
that land resources in the city are extremely limited and provides
for a significant planning challenge in seeking to meet future
development needs, particularly for housing, whist safeguarding
the character and natural amenities of the area. Being located
on a peninsula, the geography of the area dictates the surface
transportation links to the city which are concentrated in a narrow
east-west corridor which present congestion and accessibility issues
affecting the local economy and tourism industry.
A CITY BY THE SEA
b. Strategy and Objectives – sustainable growth that contributes
to future needs whilst protecting and safeguarding the character
and natural amenities of the city requires the development of
a comprehensive strategy and objectives which underpin the
principles and policies of the Plan.
c. Securing and Improving Infrastructure – it will be essential that the
social and physical infrastructure is secured to meet the needs of a
growing population. Education, health, sewage and drainage, and
highway infrastructure is already struggling to cope with demand.
Further developments need to be carefully planned to ensure
that the necessary infrastructure is in place to meet the increasing
cumulative demands. This document therefore seeks to adopt an
‘infrastructure led’ approach.
d. A new neighbourhood on land north of Southend – due to a
significant need for new homes, including family and affordable
housing, which cannot be fully met the Local Plan makes provision
for a series of urban villages providing a range of uses, parkland
and supporting infrastructure on land to the north of Southend.
A CITY THAT IS HEALTHY AND SAFE
e. Enabling Healthy Lifestyles & Wellbeing – There are health
inequalities across Southend often exceeding the national average.
It will be essential that new development embraces the principle
of facilitating healthy lifestyles through promoting opportunities
for active travel including walking and cycling and the provision
of sport and recreation facilities and protected green space. The
concept of facilitating complete neighbourhoods across the city,
where everyday essentials and services are within a convenient
walking distance, will help promote healthy lifestyles.
A CITY OF OPPORTUNITY
f. Homes – the city has grown into a substantial residential area
comprising 83,500 dwellings, providing homes for 182,000
people. This has resulted in the city having one of the highest
residential densities in the UK outside London. The Government
www.southend.gov.uk | 11
2. About Southend
Standard Method for calculating housing need indicates that 1,405
new homes are needed each year in Southend. Recent housing
provision has been concentrated on brownfield sites mainly in the
central urban areas with a large proportion of flatted developments.
In the City Centre conversion from obsolete office blocks to
residential have provided a significant stock of accommodation.
However, this provision has not kept pace with demand particularly
for affordable and family housing.
g. Securing a Thriving Local Economy – the local economy is
dominated by small to medium enterprises with 86% of companies
employing 10 staff or fewer. There are approximately 80,000 jobs in
Southend provided in a variety of commercial areas and designated
business estates. There is a need to provide additional jobs with
opportunities for growth in several sectors, including construction,
aviation, health industries, tourism and leisure, and business and
financial services. It will be essential that the Plan embraces this
potential and satisfactorily accommodates the trend for increased
working from home and the need for digital infrastructure. The City
Centre, London Southend Airport and associated business park, and
a cluster of existing employments areas located along the A127/
A1159 corridor are well placed to achieve economic growth. It will
also be important that education and further education is facilitated,
focusing on building the skills base locally.
h. Tourism – Southend is a major UK resort and attracts around 7
million day visitors and over 200,000 staying visitors each year
which enrich the local economy. There is significant potential
to maximise Southend’s potential as a visitor destination and
resort, particularly in terms of the evening economy and through
encouraging overnight and longer stays by capitalising on the
resort’s success as a day visitor destination. Managing these visitor
numbers in a sustainable way will need to be addressed by the
Plan, having regard to access and visitor parking.
A CITY TO BE PROUD OF
i. Urban Design, Character and Heritage – with limited land
resources, areas of high urban building densities and an established
local character, quality design and layout will be an important
ingredient in new development schemes in seeking to protect
the unique character of areas and their sense of place to provide
safe and attractive environments where heritage is celebrated
and recognised for the role it can play in place making and
regeneration.
A CITY THAT IS GREEN AND SUSTAINABLE
j. Enhancing our Natural Environment – with seven miles of
foreshore and over 500 hectares of green space, the city has a rich
and varied landscape providing for recreation and important wildlife
habitats and green lungs within the densely developed urban
area. It will be essential that the foreshore and green spaces are
protected, and biodiversity is enhanced within an improved network
of green corridors.
k. Climate Change and Environmental Protection – all development
and future proposals will need to address the challenges of climate
change and flood risk, including energy efficiency. Southend is
susceptible to local water surface flooding under conditions of
extreme rainfall and from tidal flooding in certain locations. It is
essential that these issues are properly managed and planned and
that sustainable drainage systems (SuDS) are incorporated into
development schemes.
12 | Southend Local Plan • Proposed Submission Draft (Regulation 19)
2. About Southend
A CITY THAT IS CONNECTED AND SMART
l. Transport and Connectivity –the city is served by two railway lines
and two highway arteries (the A127 and A13) within a confined east
- west corridor to London. Reliability and congestion issues can
have major impacts on the local economy and its tourism offer. It
will also be important for the Plan to embrace sustainable transport
provision, including bus, cycling and walking particularly for short
journeys, whilst recognising the role that rail and the private car
have to play in the local economy.
m. London Southend Airport – Following the impacts of Covid-19 the
Airport is in a state of recovery and it is likely to take several years
to return to pre-pandemic levels. Any further growth will need to be
carefully managed in association with all relevant partners to ensure
that growth takes into full account environmental considerations,
particularly those relating to noise and surface access. The Airport
Business Park continues to provide a significant opportunity for new
employment floorspace and jobs.
THE NEIGHBOURHOODS OF SOUTHEND
n. Place Specific Policies – Southend has grown organically from the
villages of Leigh, Prittlewell and Shoeburyness to form a cohesive
urban area comprising a number of distinct neighbourhoods (see
Figure 1.2). It will be important that this local distinctiveness and
character is recognised and respected in future development
schemes. It will also be important for the Plan to address the
changing role of the retail and commercial centres within the
neighbourhoods, particularly in the City Centre. The City Centre
has been greatly impacted by the changing shopping patterns of
customers with the advent of on-line shopping and the demise of a
number of prominent national retail outlets.
www.southend.gov.uk | 13
2. About Southend
Figure 2.1: The Places of Southend
(Southend Neighbourhoods)
14 | Southend Local Plan • Proposed Submission Draft (Regulation 19)
2. About Southend