This section summarises the Infrastructure Delivery Plan (IDP), which sets out the key infrastructure needed to support growth. The IDP is a live document that will be updated. The plan proposes a total of 14,700 dwellings up to 2045, including a new neighbourhood of 4,900 homes at Land North of Southend. A table splits needs between the existing urban area and Bournes Green. Needs include road, bus, rail, walking and cycling upgrades, community facilities, and health and emergency services. The existing urban area needs about 1,000 extra early years places. Bournes Green would need about 450 early years places, two primary schools and one secondary school.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Appendix 4
Summary of Infrastructure Requirements
A4.1 Background
A4.1.1 This appendix broadly summarises the requirements of the
Infrastructure Delivery Plan (IDP) which accompanies this
local plan. The full IDP can be viewed here: https://localplan.
southend.gov.uk/evidence-documents.
A4.1.2 The IDP should be treated as a ‘live document’ which
provides a snapshot at a point in time and will need to be
updated as development proposals and other circumstances
across the City area change. The IDP could therefore form the
basis for further updates as the Local Plan progresses through
examination and is subsequently adopted.
A4.1.3 The IDP forms a key part of the Local Plan evidence base. It
assesses the existing provision of infrastructure throughout
the city area and sets out details of what additional essential
infrastructure is required to ensure the successful sustainable
implementation of the strategic policies contained in the new
Local Plan.
A4.1.4 The IDP does not consider all infrastructure types but instead
focuses on key items of infrastructure which will be required
to support the delivery of growth proposed in the emerging
new Local Plan. ‘Infrastructure’ is defined as physical, social
and green items required to enable sustainable development.
A4.1.5 The IDP has assessed the infrastructure requirements of the
local plan growth strategy. This proposes a total of 14,700
dwellings over the Plan period up to 2045. As part of this total
the IDP considers the infrastructure required to support and
mitigate the allocation at Land North of Southend for a new
neighbourhood of 4,900 homes (plus other uses).
A4.1.6 The main infrastructure requirements are summarised in
Table A4.1 and are divided between the existing urban area
and Bournes Green (LNOS)..
Table A4.1: Main Infrastructure Requirements
Development within the existing urban area New neighbourhood Bournes Green (Land North of Southend)
Infrastructure Infrastructure Item Infrastructure Item
Transport, Highways Strategic highway improvements and junction capacity
enhancements.
Highway mitigation package including A127, A1159, Eastern
Avenue and local junction improvements
Strategic walking and cycling infrastructure and active travel
enhancements.
Increased capacity on the surrounding highway network,
particularly on the A1159, A13, and B1017 and the wider
strategic network (A127, A1159, including Priory Cresent).
Rail accessibility improvements and enhanced connections to
key rail stations.
New internal road network and strategic connections.
Highway, public transport and active travel mitigation
measures identified through the emerging Transport
Assessment and Pell Frischmann transport modelling.
Enhanced bus services, mobility hub, bus priority measures
and supporting infrastructure.
Public transport improvements, including bus priority
measures, mobility hubs and integrated, ticketing
infrastructure.
Improvements to rail station facilities, and improved public
transport connections to rail stations.
Create new pedestrian and cycle connections to surrounding
areas.
Community
Infrastructure
New and extended community infrastructure, including
community halls or hubs, library facilities, family hubs, cultural
facilities, allotments and cemetery/burial provision.
New and extended community infrastructure, including
community halls or hubs, library facilities, family hubs, cultural
facilities, allotments and cemetery/burial provision.
Development within the existing urban area New neighbourhood Bournes Green (Land North of Southend)
Infrastructure Infrastructure Item Infrastructure Item
Education Approximately 1,000 additional early years and childcare
(EY&C) places to be provided through extensions to existing
EY&C provision or new facilities.
Approximately 450 additional early years and childcare
places.
Additional primary education infrastructure - to be provided
predominantly through extensions to existing primary schools
as required.
2 x 2 FE primary schools.
Provision equivalent to a 6 form entry secondary school to be
provided through extensions to existing secondary capacity
1x 6 FE secondary school.
(could be delivered alongside 1 of the primary schools as an
all through school)
Additional post-16 education and training capacity. Additional post-16 education and training capacity which
does not necessarily need to be provided on site.
Additional SEND provision, including specialist resource
bases and improvements to existing facilities.
Additional SEND provision, including specialist resource
bases and improvements to existing facilities.
Emergency Services Expansion and enhancement of ambulance infrastructure,
vehicles and operational facilities.
Additional resources and facilities, including response
capacity, vehicle provision and hub enhancements.
Additional police infrastructure, accommodation and
operational resources.
Additional resources and facilities for Police and Fire services.
Additional fire and rescue, infrastructure, equipment,
communications technology and station modernisation.
Health Additional primary healthcare provision arising from
growth through possible expansion, enhancement and
reconfiguration of existing primary healthcare facilities.
Provision of additional healthcare hub facilities where
required.
Provision of site for a new purpose built primary care
provision operating as a multi practice hub or an integrated
health and community facility within local centre – 1,000-
1,200 sqm.
Development within the existing urban area New neighbourhood Bournes Green (Land North of Southend)
Infrastructure Infrastructure Item Infrastructure Item
Green Infrastructure Additional publicly accessible Protected Green Space in line
with national and local standards including parks, children’s
play space, and natural and semi-natural greenspace.
Suitable Alternative Natural Greenspace (SANG) should
be provided where required; on site where preferable, or
alternatively off-site on existing Protected Green space.
Provision of multifunctional Green Infrastructure in line with
national and local standards, including Protected Green
Space formed of parks, natural and semi-natural greenspace,
allotments, MUGAs, and children’s play space. Suitable
Alternative Natural Greenspace (SANG) should be provided
where required; on site where preferable, or alternatively off-
site on existing Protected Green Space.
Sports, indoor and
built facilities
Improvements and expansion to the quality of existing
infrastructure including additional 3G pitch provision and
ancillary facilities.
New and improved sports provision including additional grass
pitches, tennis and padel courts and 3G pitch provision.
Flood management
including potable
water
Flood management and water supply infrastructure
incorporated into all emerging development proposals.
Flood management and water supply infrastructure
incorporated into all emerging development proposals.
Electricity Infrastructure to support increased electricity demand, electric
vehicles and low-carbon technologies.
Infrastructure to support increased electricity demand, electric
vehicles and low-carbon technologies. Potential new primary
substation and network reinforcement subject to UKPN
assessment.
Gas Ongoing gas network modernisation and reinforcement where
required.
Extended gas distribution infrastructure where required,
subject to Cadent assessment.
Wastewater Wastewater infrastructure upgrades delivered through
Anglian Water investment and developer-funded works where
required.
Wastewater management system additions and upgrades
delivered through Anglian Water investment and developer-
funded works where required.
Communications Gigabit broadband, mobile connectivity and digital
infrastructure improvements
Full fibre, gigabit-capable broadband and digital infrastructure
delivered as part of development