Appendix 4 – Summary of Infrastructure Requirements

On pages 354 to 357 of the official PDF.

The human version

This section summarises the Infrastructure Delivery Plan (IDP), which sets out the key infrastructure needed to support growth. The IDP is a live document that will be updated. The plan proposes a total of 14,700 dwellings up to 2045, including a new neighbourhood of 4,900 homes at Land North of Southend. A table splits needs between the existing urban area and Bournes Green. Needs include road, bus, rail, walking and cycling upgrades, community facilities, and health and emergency services. The existing urban area needs about 1,000 extra early years places. Bournes Green would need about 450 early years places, two primary schools and one secondary school.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 354

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Appendix 4 Summary of Infrastructure Requirements A4.1 Background A4.1.1 This appendix broadly summarises the requirements of the Infrastructure Delivery Plan (IDP) which accompanies this local plan. The full IDP can be viewed here: https://localplan. southend.gov.uk/evidence-documents. A4.1.2 The IDP should be treated as a ‘live document’ which provides a snapshot at a point in time and will need to be updated as development proposals and other circumstances across the City area change. The IDP could therefore form the basis for further updates as the Local Plan progresses through examination and is subsequently adopted. A4.1.3 The IDP forms a key part of the Local Plan evidence base. It assesses the existing provision of infrastructure throughout the city area and sets out details of what additional essential infrastructure is required to ensure the successful sustainable implementation of the strategic policies contained in the new Local Plan. A4.1.4 The IDP does not consider all infrastructure types but instead focuses on key items of infrastructure which will be required to support the delivery of growth proposed in the emerging new Local Plan. ‘Infrastructure’ is defined as physical, social and green items required to enable sustainable development. A4.1.5 The IDP has assessed the infrastructure requirements of the local plan growth strategy. This proposes a total of 14,700 dwellings over the Plan period up to 2045. As part of this total the IDP considers the infrastructure required to support and mitigate the allocation at Land North of Southend for a new neighbourhood of 4,900 homes (plus other uses). A4.1.6 The main infrastructure requirements are summarised in Table A4.1 and are divided between the existing urban area and Bournes Green (LNOS).. Table A4.1: Main Infrastructure Requirements Development within the existing urban area New neighbourhood Bournes Green (Land North of Southend) Infrastructure Infrastructure Item Infrastructure Item Transport, Highways Strategic highway improvements and junction capacity enhancements. Highway mitigation package including A127, A1159, Eastern Avenue and local junction improvements Strategic walking and cycling infrastructure and active travel enhancements. Increased capacity on the surrounding highway network, particularly on the A1159, A13, and B1017 and the wider strategic network (A127, A1159, including Priory Cresent). Rail accessibility improvements and enhanced connections to key rail stations. New internal road network and strategic connections. Highway, public transport and active travel mitigation measures identified through the emerging Transport Assessment and Pell Frischmann transport modelling. Enhanced bus services, mobility hub, bus priority measures and supporting infrastructure. Public transport improvements, including bus priority measures, mobility hubs and integrated, ticketing infrastructure. Improvements to rail station facilities, and improved public transport connections to rail stations. Create new pedestrian and cycle connections to surrounding areas. Community Infrastructure New and extended community infrastructure, including community halls or hubs, library facilities, family hubs, cultural facilities, allotments and cemetery/burial provision. New and extended community infrastructure, including community halls or hubs, library facilities, family hubs, cultural facilities, allotments and cemetery/burial provision. Development within the existing urban area New neighbourhood Bournes Green (Land North of Southend) Infrastructure Infrastructure Item Infrastructure Item Education Approximately 1,000 additional early years and childcare (EY&C) places to be provided through extensions to existing EY&C provision or new facilities. Approximately 450 additional early years and childcare places. Additional primary education infrastructure - to be provided predominantly through extensions to existing primary schools as required. 2 x 2 FE primary schools. Provision equivalent to a 6 form entry secondary school to be provided through extensions to existing secondary capacity 1x 6 FE secondary school. (could be delivered alongside 1 of the primary schools as an all through school) Additional post-16 education and training capacity. Additional post-16 education and training capacity which does not necessarily need to be provided on site. Additional SEND provision, including specialist resource bases and improvements to existing facilities. Additional SEND provision, including specialist resource bases and improvements to existing facilities. Emergency Services Expansion and enhancement of ambulance infrastructure, vehicles and operational facilities. Additional resources and facilities, including response capacity, vehicle provision and hub enhancements. Additional police infrastructure, accommodation and operational resources. Additional resources and facilities for Police and Fire services. Additional fire and rescue, infrastructure, equipment, communications technology and station modernisation. Health Additional primary healthcare provision arising from growth through possible expansion, enhancement and reconfiguration of existing primary healthcare facilities. Provision of additional healthcare hub facilities where required. Provision of site for a new purpose built primary care provision operating as a multi practice hub or an integrated health and community facility within local centre – 1,000- 1,200 sqm. Development within the existing urban area New neighbourhood Bournes Green (Land North of Southend) Infrastructure Infrastructure Item Infrastructure Item Green Infrastructure Additional publicly accessible Protected Green Space in line with national and local standards including parks, children’s play space, and natural and semi-natural greenspace. Suitable Alternative Natural Greenspace (SANG) should be provided where required; on site where preferable, or alternatively off-site on existing Protected Green space. Provision of multifunctional Green Infrastructure in line with national and local standards, including Protected Green Space formed of parks, natural and semi-natural greenspace, allotments, MUGAs, and children’s play space. Suitable Alternative Natural Greenspace (SANG) should be provided where required; on site where preferable, or alternatively off- site on existing Protected Green Space. Sports, indoor and built facilities Improvements and expansion to the quality of existing infrastructure including additional 3G pitch provision and ancillary facilities. New and improved sports provision including additional grass pitches, tennis and padel courts and 3G pitch provision. Flood management including potable water Flood management and water supply infrastructure incorporated into all emerging development proposals. Flood management and water supply infrastructure incorporated into all emerging development proposals. Electricity Infrastructure to support increased electricity demand, electric vehicles and low-carbon technologies. Infrastructure to support increased electricity demand, electric vehicles and low-carbon technologies. Potential new primary substation and network reinforcement subject to UKPN assessment. Gas Ongoing gas network modernisation and reinforcement where required. Extended gas distribution infrastructure where required, subject to Cadent assessment. Wastewater Wastewater infrastructure upgrades delivered through Anglian Water investment and developer-funded works where required. Wastewater management system additions and upgrades delivered through Anglian Water investment and developer- funded works where required. Communications Gigabit broadband, mobile connectivity and digital infrastructure improvements Full fibre, gigabit-capable broadband and digital infrastructure delivered as part of development Waste Management Recycling infrastructure and service enhancements. Recycling infrastructure and service enhancements.
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Bournes Green📍 Southend
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.