← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / DM10.1

Policy DM10.1

Promoting Sustainable Transport & Reducing Congestion

On pages 222 to 224 of the official PDF.

The human version

This policy says development should be located and designed to improve health and wellbeing, encouraging walking, cycling and public transport and reducing reliance on private cars. Designs should put pedestrians, cyclists and public transport users first, with walking and cycling routes usable by first occupation. Access and traffic should not cause undue harm to the street scene, neighbours or highway safety. Schemes creating high travel demand should help fund off-site improvements such as bus priority measures. Proposals should show the network can cope, backed by a Transport Statement and Travel Plan Statement, or a Transport Assessment and full Travel Plan. Better railway stations, forecourts and step-free access will be supported.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 222

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy DM10.1: Promoting Sustainable Transport & Reducing Congestion 1. Development should be located and designed to contribute to improved health and wellbeing, encouraging walking and cycling and use of public transport routes, while reducing dependency on travel by private motor vehicle. This should include: i. designing developments to prioritise the needs of pedestrians, cyclists, users of public transport and co-location of facilities to reduce the need to travel and support opportunities for active travel; ii. phasing the development process so that walking and cycling infrastructure is in place and usable at the point of first occupation; iii. ensuring that access to the development, and any traffic generated, does not cause undue harm to the local street scene, including the amenity of neighbouring properties and/ or public rights of way, and does not cause an unacceptable impact in terms of increased traffic congestion or highway safety; iv. providing an appropriate amount and type of parking in accordance with Policy DM10.3; v. for development which generates a significant demand for travel and/ or is likely to have other transport implications: contributing to improved sustainable transport infrastructure off-site, including, where appropriate, bus priority measures and enhanced passenger information, and enhancements to the city’s walking and cycling network. 2. Development proposals should demonstrate that there is, or will be, physical and environmental capacity to accommodate the amount and type of traffic generated in a safe and sustainable manner, that the cumulative impact on the transport network can be satisfactorily mitigated, and other relevant local plan policies are satisfactorily addressed. To consider such impacts, development proposals* should be supported by a: i. Transport Statement, which assesses the impact of a development with relatively small transport implications, and a Travel Plan Statement**, which identifies how the development will maximise the usage of sustainable modes of transport; or ii. Transport Assessment, which assesses the impact of a development when there would be significant impact on the transport network, infrastructure and services, and a full Travel Plan **, which will identify how the development will optimise the usage of sustainable modes, including necessary improvements and introduce new infrastructure as required to mitigate development impacts. this will be developed for specific stations would require development of site-specific considerations. Opportunities to improve the accessibility, environment and interchange at stations will be given positive consideration, especially where they facilitate more effective integration with other sustainable modes. The Elizabeth Line recently opened, providing connections from Shenfield through central London to the west of England, and providing connections for travel to Kent. There is potential for the line to be extended to Southend Victoria during or beyond the plan period. The applicant should refer to the Local List of Planning Validation Requirements (or any subsequent document) to ensure that they submit an appropriate Transport Statement or Transport Assessment with their planning application. 3. Proposals to enhance the role of railway stations, access to them, the quality of surrounding public realm and station forecourts will be supported where these meet other relevant Local Plan policies. All stations will be prioritised for enhanced public realm and improved multi- modal connections and step-free access. Development will be supported where it would contribute to the implementation of enhanced rail infrastructure, capacity, improved timetabling or operational improvements. *Relevant thresholds for Transport Statement and Transport Assessment are set out within the Council’s Local List of Validation Requirements. ** Travel Plans, and Travel Plan Statements, should seek to reduce dependency on motor vehicles by considering a range of measures, including car clubs, car sharing and pooling, real-time public transport information, marketing and communication materials and travel packs. Ensuring that the highway network is safe and effective – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 20 Strategic Policy SP10 Why we need this Policy 10.18 Southend has a strategic objective to improve accessibility, connectivity, sustainability, and ease of movement to, from and within the city. Strategic Policy SP10 sets out the framework for ensuring business as usual despite new development. This policy provides further requirements to ensure the continued safe and efficient movement of the network. How the Policy Works 10.19 It is important for Southend to be able deliver new homes and jobs for its growing population, although this growth should not overly interfere with the day-to-day prosperity and function of the city’s centres, employment areas and transport network. Deliveries during construction can contribute to congestion, as can servicing and deliveries when the building is operational. Innovative solutions such as the implementation of last mile deliveries by foot, cycle or zero emission vehicles will be supported. 10.20 While onsite, major development can require large amounts of deliveries and servicing, these activities require the use of heavy construction vehicles and often result in disruption on the network. Site phasing must be undertaken in order to reduce the impact of these activities on the network. Equally, the servicing of operational facilities, especially out of hours, requires careful consideration. 10.21 Development can mitigate disruption to existing residents and businesses by providing off street servicing space where practicable or implementing freight reduction measures can ensure that deliveries and servicing requirements do not have a negative impact on the road network. This is particularly important for high density residential or commercial developments in the Southend Central neighbourhood and City Centre, and on the strategic highway and bus routes within Southend.
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Southend📍 Victoria
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.