OpenConsult / Southend plan / DM10.3

Policy DM10.3

Parking Standards

On pages 228 to 230 of the official PDF.

The human version

This policy says all development should meet the parking standards, including cycle parking, in Appendix 9. Residential standards may be applied flexibly in sustainable locations with frequent public transport, or where strict use would harm local character. On-street parking is only acceptable where the applicant shows there is capacity. Proposals must put pedestrians, disabled people and cyclists first, with safe, secure and covered cycle parking. Major schemes must provide safe access to public transport and for emergency vehicles. Car Club parking is supported, especially in car free or car lite schemes. Vehicle crossovers should not harm highway safety. A 'Park and Ride/Rail' is supported if it meets set requirements.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 228

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy DM10.3: Parking Standards 1. All development should meet the parking standards (including cycle parking) set out in Appendix 9. Residential vehicle parking standards may be applied flexibly where it can be demonstrated that the development is proposed in a sustainable location with frequent and extensive links to public transport and/ or where the rigid application of these standards would have a clear detrimental impact on local character and context. Reliance upon on-street parking will only be considered appropriate where it can be demonstrated by the applicant that there is on-street parking capacity. All parking provision should contribute to high-quality design (see Policy DM7.1). The parking standards in Appendix 9 will be kept under review. 2. To prioritise and promote alternatives to private vehicle use, development proposals must prioritise the needs of pedestrians, including disabled persons and those with impaired mobility, and cyclists, including safe, secure and covered on-site cycle parking and, where appropriate, changing facilities, creating safe and secure layouts that minimise conflicts with traffic and avoid street clutter and barriers to movement. 3. All major development proposals must incorporate and include provision for: i. safe, convenient and legible access to public transport for pedestrians and cyclists, and sustainable alternatives to reduce dependency on vehicles. All other development should seek to include such measures where site specific circumstances allow; and ii. servicing and access for emergency vehicles. 4. Provision of parking for Car Clubs will be supported, to be agreed to the satisfaction of the Local Planning Authority, particularly in car free/ car lite developments where lower car parking provision is proposed. 5. Provision of vehicle crossovers for new or existing developments should not have any detrimental impact on highway safety and the effective functioning of bus and cycle routes and should not adversely impact overall on-street parking levels. 6. Electric vehicle charging points and infrastructure should be provided in line with the standards in Policy DM9.2: Energy. Infrastructure for public electric vehicle charging points should be focussed within commercial/ retail centres and public car parks. On-street residential charging points should be located where they would not inhibit access for pedestrians and other road users. 7. Provision of a “Park and Ride/Rail” will be supported subject to meeting the following requirements: i. be close to and have good access to the strategic road network; ii. incorporate a high-quality passenger waiting area with facilities and VMS signage; iii. be linked to bus priority measures on the network; iv. incorporate electric charging points; v. incorporate Low-Impact Lighting and CCTV security; vi. be supported by a full Transport Assessment. Telecommunications – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 1 Strategic Objective 20 Strategic Policy SP10 Why we need this Policy 10.33 Telecommunications, whether by full fibre to properties or by cellular data (such as 5G) are essential to the economy and transport systems. However, the networks do have locational needs and physical impacts that need to be addressed through the planning system. How the Policy Works 10.34 Digital infrastructure is a constantly evolving technology. This policy seeks to provide for the two main forms of digital communication: cellular communications that require equipment be placed on buildings and masts to relay signals, and 5G (and in future, 6G) that requires a denser network of cells to function, thus a need for more equipment, often at greater height. 10.35 Telecommunications also have a role in providing real time transport information. Bus stops and shelters provide real time service update, and signage also indicates public parking capacity within the City Centre. 10.36 Not all telecommunications development requires planning permission as set out by the relevant legislation, but where planning permission or prior approval is required, the provision of Policy DM10.4 apply. 10.37 Full fibre relies on underground networks. City Fibre have already installed a new network throughout Southend. T o maximise the benefits of this it is essential that any new premises are constructed in such a manner that enables easy access to the network, thus avoiding additional costs at a later stage for retrofitting. Permitted development rights have been altered nationally to facilitate this for residential uses, but the same principle of easy access should apply to all uses. 10.38 The Council will consider a range of impacts in determining applications, including cumulative impacts. Visual impacts are likely to be most common. Because of the potential site-specific impacts in a very densely populated urban area, the Council encourages the use of designs tailored to the locality rather than the use of standard models, and pre-application discussions are encouraged to resolve any issues.
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Southend
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.