← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / DM8.1

Policy DM8.1

Green Infrastructure Network

On pages 170 to 172 of the official PDF.

The human version

This policy says all major residential developments must provide public open space, on site where possible, or else make a financial contribution. Developers should provide for long-term upkeep. Public open space can only be lost if a replacement of equal or better quality and size serves the same area. New green space, play space, food growing and better walking and cycling access are strongly encouraged. Developments should protect habitats, support the Essex Nature Recovery Strategy and use nature-based SuDS where they can. Allotments can only be redeveloped if no longer needed or replaced. The Council will also support countryside recreation, more footpaths and horse-riding routes, and better local play areas.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 170

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy DM8.1: Green Infrastructure Network 1. All major residential developments are required to provide public open space. Provision should be on-site, recognising in particular where the development would exacerbate existing deficiencies in quantity, quality and/or access. Where it can be robustly justified that on-site provision is not practicable a financial contribution will be sought for the provision of new/ improved public open space. Wherever new or improved green infrastructure is delivered as part of new development, the developer should make appropriate provision for its long-term management and maintenance. 2. The loss of public open space through new development will not be permitted unless it would result in a replacement open space of equivalent or better quality and quantity being provided that would serve the same locality. 3. Opportunities to provide new green space, play space and play on the way elements, local food growing and enhanced walking and cycling access are strongly encouraged, particularly where this would address deficiencies in quantity, quality and/or access. 4. Developments should promote the conservation, restoration and enhancement of priority habitats, ecological networks and the protection and recovery of priority species. All proposals will be expected to contribute to biodiversity and meet the objectives of the Essex Nature Recovery Strategy. 5. Developments should provide space for water where appropriate in accordance with Policy DM9.4. SuDS schemes should include nature- based solutions wherever practicable. 6. The redevelopment of existing allotment sites for other uses will only be permitted where it can clearly be shown that the facility is no longer required or can be adequately and conveniently provided elsewhere. 7. Facilities for informal countryside recreation which increase public access will be encouraged, provided this would not adversely affect land of nature conservation, landscape or archaeological importance. The Council will work with other local authorities, landowners, horse-riding and walking interests to create additional footpath and horse-riding opportunities within Southend and adjoining areas and will seek to incorporate such facilities within the definitive rights of way network. 8. Development proposals should not prejudice the informal recreation value of footpaths and bridleways. 9. The Council will seek to enhance public open space provision by: i. providing local areas for play within areas of deficiency as land and resources allow; ii. working in partnership to enhance connections between public open spaces for increased biodiversity, active travel and climate change resilience; iii. widening community access to school recreation facilities through community use agreements where new or improved facilities are permitted; iv. qualitative improvements to existing public open space. Urban Greening Factor – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 16 Strategic Objective 17 Strategic Policy SP8 Why we need this Policy 8.16 The Urban Greening Factor is a tool that evaluates the quantity and quality of urban greening provided by a development proposal. It aims to accelerate the greening of urban areas and results in well planned and high-quality interventions that add to a multi-functional green infrastructure network. 8.17 The central area of Southend, including the City Centre and Central Seafront will be the continued focus for civic, cultural and commercial activity, where a substantial proportion of planned residential growth in Southend to 2045 is expected to come forward. Aside from one or two notable examples such as Warrior Square and Prittlewell Square, the High Street and its environs is severely lacking in green infrastructure, and previous public engagement has confirmed that residents strongly support the need for urban greening to enhance the character of the City Centre and make it a more attractive and welcoming place. 8.18 Urban greening can also support climate change resilience. The Southend Heat Stress Strategy (2022) found that parts of Southend, including the City Centre and adjacent neighbourhoods lack green and blue infrastructure, which results in a higher average day and nighttime temperatures. This can contribute to increased levels of surface water run-off, causing localised surface water flooding issues, and higher temperatures are a risk factor for the health of vulnerable residents, including children and older people. 8.19 Southend is a densely developed area with limited opportunities for new green space. However, there will be opportunities to create Protected Green Space where new development is proposed, including enhanced public realm, as well as improving connections between green spaces through soft landscaping, tree planting, green roofs and walls, and better signage and way finding. Such small interventions can make a significant impact as part of the wider network and can also provide a means of enhancing biodiversity on urban and brownfield sites. How the Policy Works 8.20 Policy DM8.2 requires major developments to demonstrate how they have integrated urban greening into their proposals. The aim is to secure a measurable increase in green and blue infrastructure. Increasing the amount of permeable surface will aid surface water run-off, and reduce heat stress, as well as creating a more attractive place, with benefits for the environment, local residents, and local businesses. 8.21 The Urban Greening Factor (UGF) is a tool to evaluate the quantity and quality of urban greening and compares the amount of greening proposed against a target score. The Surface Cover Types and Factor Scores are set out in Appendix 8. 8.22 Different types of greening measures are categorised by surface types with a factor score assigned to reflect their relative quality. The UGF assigns a factor score to each surface type as a proxy for naturalness and functionality. Better quality surface types can achieve a higher UGF score without increasing the overall footprint of greening. As Southend has an urban character, a score of 0.4 for predominantly residential development, and 0.3 for predominantly commercial development is considered appropriate. This approach has been endorsed by Natural England, and the surface cover types are consistent with Natural England proposed weightings98. The Urban Greening Factor tool can be used to inform pre-application discussions and highlight opportunities to increase green and blue infrastructure as an integral part of the proposals, providing wider environmental, social and economic benefits. For mixed-use developments the land use class with the largest square meterage surface area can be used to determine the target score and if necessary, advice can be sought from the local planning authority. 8.23 Developers are expected to meet the target UGF scores. In case of a shortfall, developers are required to provide justification of the specific constraint to delivery. If not meet, developer should secure offsite greening in the immediate vicinity of the site through planning conditions and/or planning obligations. An operational and maintenance plan is required to demonstrate that green features will be maintained throughout the life of the development. A review of major developments granted planning permission indicates that a measurable increase in urban greening would be technically feasible with only minor adjustments to scheme design. 98 https://publications.naturalengland.org.uk/publication/5846537451339776 8.24 Policy DM8.2 does not replace the requirement to achieve 10% BNG (or higher) on qualifying developments. It is intended to complement other green infrastructure policy requirements in section 8 of the local plan. Where a proposal may affect a designated site for Nature Conservation the proposal should comply with Policy DM8.3 and Policy DM8.4 to avoid or mitigate any effects on the biodiversity value of the site.
Health, schools & communityInfrastructure & utilitiesNature & environment📍 Prittlewell📍 Southend
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.