← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / SP10

Policy SP10

Transport and Connectivity

On pages 217 to 221 of the official PDF.

The human version

This policy seeks a 'step change' in transport, working with partners on a modern integrated system. Developments must contribute to improvements in the Southend Infrastructure Delivery Plan and Local Transport Plan where related and necessary. New development must provide for walking, cycling, public transport and new highways. This includes improving the A127/A1159 corridor, better access to places such as Bournes Green New Neighbourhood, Fossetts Farm and London Southend Airport, and high-quality interchanges at places like Leigh Railway Station. Other aims include better buses, use of the River Thames and electric and hydrogen vehicle charging. Large traffic generating schemes will go to well served areas near the City Centre.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 217

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Strategic Policy SP10: Transport and Connectivity 1. Improvements to transport infrastructure and services will be sought in partnership to secure a ‘step change’ in provision to achieve a modern integrated transport system necessary to secure the sustainable growth of the city and support delivery of site proposals as part of an infrastructure led approach. 2. Development proposals will be required to contribute to the implementation of the transport improvements set out in the Southend Infrastructure Delivery Plan and the provisions of the Southend on Sea Local Transport Plan and their subsequent reviews where such contributions would be related to the development proposed and necessary for the development to proceed. 3. New development must provide for sustainable transport including walking, cycling, and public transport modes and new highway infrastructure. These provisions include but are not limited to: i. improving the road and rail network to deliver improvements to accessibility, traffic flows, travel choice and freight distribution as set out in the Southend Infrastructure Delivery Plan, including by: a. improving the A127/A1159 strategic transport corridor including junction and capacity improvements; b. improving accessibility to key development sites, the City Centre and Central Seafront, Bournes Green New Neighbourhood, Fossetts Farm, and London Southend Airport to support the potential of the Airport as a catalyst for economic growth, as well as improving access to employment areas, parks and sports/ leisure facilities; c. providing high-quality transport interchanges in the City Centre, Leigh Railway Station, Shoeburyness Railway Station, Southend University Hospital and London Southend Airport; ii. widening travel choice and opportunities for active travel, particularly walking and cycling, rail, bus (including the enhancement and creation of key bus corridors and mobility hubs, and demand-responsive transport), car share/ clubs, and taxi. iii. enhancing the level of bus provision and connectivity through improved mobility hubs and interchanges (and potentially through Park-and- Ride/Rail and rapid transit where feasible). iv. realising the potential of the River Thames to function as a sustainable transport corridor, including improved access to Leigh Port, subject to environmental considerations; How we are going to get there v. providing for new and enhanced technologies that support the efficient operation of the transport network, including signing and intelligent transport management systems, and maximising the opportunities for use of 5G and the Fibre to the premise (FTTP) network to facilitate opportunities for new transport technologies such as autonomous vehicles, improving road safety, and equality of access for all. vi. provision of appropriate on and off-street infrastructure to facilitate electric and hydrogen powered vehicles as part of a move towards a low carbon transport network. vii. parking management that enhances the quality of place, the effective function of the transport network and encouragement of low carbon modes of travel. 4. Significant development proposals which would generate large traffic movements, or which are of sub-regional importance, will be directed to those areas well served by a range of transport modes and in areas close to the City Centre. All development will need to reduce sole reliance on the car for accessibility by enabling access by sustainable travel modes including public transport. Why we have taken this approach 10.1 The physical location of the city and its geography present both challenges and opportunities in terms of the management of the transport network. The Local Plan Transport Modelling Assessment (2026)147 provides evidence that the forecast impacts of Local Plan growth to 2045 can be mitigated through a package of transport interventions modelled and set out within the assessment. These mitigation measures and improvements are also set out in the Southend Infrastructure Delivery Plan (2026) and broadly summarised in Appendix 4. 10.2 The use of electric and hydrogen fuelled vehicles will help to reduce vehicle emissions, and provision of re-fuelling infrastructure to enable this will be essential. Enhancing the level of bus provision and connectivity through improved transport hubs (and potentially through Park-and-Ride/Rail where feasible) would help to achieve changes in how people travel and provide sustainable solutions. They will however require a fresh look at how the existing infrastructure could accommodate such facilities through the Local Transport Plan (LTP) and relevant studies. 10.3 The Bus Service Improvement Plan 2024-2029 identifies Key Corridors for bus services and Mobility Hubs which will be linked together by frequent, high quality bus services, building upon the strengths of the commercial bus network, and providing links to local rail services, cycle parking and electric vehicle charging close to everyday shops and services. Mobility hubs will be prioritised at Leigh Station, City Centre (Southend Central and Southend Victoria Stations), Shoeburyness Station, Southend Hospital, Thorpe Bay 147 https://localplan.southend.gov.uk/evidence-documents Station, and London Southend Airport Station. 10.4 Co-ordinated provision of new and improved walking and cycling routes and facilities, especially to neighbourhood and local centres, will be essential if the ambition of connected neighbourhoods is to be achieved. It will be an important element in improving health and wellbeing and reducing emissions and highway congestion around the city. The emerging Southend-on-Sea Local Cycling and Walking Infrastructure Plan (LCWIP) sets out where improvements will be prioritised. 10.5 Significant technological innovation is expected to occur within the lifetime of the Local Plan. Digital technology, both in its own right but also as an enabler of new transport solutions. This covers everything from co-ordination of traffic signals to management of autonomous vehicles; the use of drones for cargo deliveries and “air taxis” for moving people in the future. 10.6 The Policy reflects the approach that developments which generate a significant amount of movement should be situated in sustainable locations. Sustainable locations are defined as sites which minimise the need to travel, such as the City Centre, and also takes advantage of the opportunities to utilise and enhance public transport and both the cycling and walking network. Consequently, it is considered appropriate that large retail, commercial, employment or leisure developments should be concentrated in locations where existing transport infrastructure can sustain such developments for the long-term, or where new developments can unlock opportunities to provide new services to both the new development and surrounding neighbourhood. Promoting Sustainable Transport & Reducing Congestion – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 17 Strategic Objective 20 Strategic Objective 21 Strategic Objective 22 Strategic Policy SP10 Why we need this Policy 10.7 Sustainable Transport in Southend plays a key role in supporting economic growth, reducing carbon emissions, promoting equality of opportunity and improving the quality of life and health. Sustainable transport management will provide a number of benefits that contribute towards sustainable development such as: ● Reducing emissions and contribution to climate change; ● Improving health through better air quality and making walking and cycling an attractive alternative to the use of private motor vehicles; ● Helping equitable access to services for all, not putting those who cannot or do not own a car at a disadvantage; and ● Reducing congestion on the road network from car travel, which can have benefits for the economy. 10.8 New development often generates additional traffic and can require new access requirements. The location of development and the intensity of the usage are the two crucial variables that will ultimately determine whether developments are sustainable in terms of the local or regional transport network. Therefore 148 National guidance, such as “Active Design” produced by Sport England, and Manual for Streets, should be followed. developments, if sustainably located, can provide tangible opportunities to improve the wider transport network. New Development should minimise the need to travel and maximise the use of sustainable transport modes, including rail and bus, and opportunities for active travel to contribute to improve the health and wellbeing of the population, particularly given the compact nature of the city. How the Policy Works 10.9 This policy will encourage modal shift, particularly to public transport (rail and bus), cycling and walking which will subsequently reduce greenhouse gas emissions and other pollutants and the use of private motor vehicles. 10.10 To promote sustainable development, the policy supports the national policy objectives of identifying and pursuing opportunities to promote walking, cycling and public transport use; providing for high-quality walking and cycling networks particularly with respect to ‘complete neighbourhoods’; and ensuring that the design and access arrangements of new developments give priority first to pedestrian and cycling movements 148. 10.11 The Local Cycling and Walking Infrastructure Plan (LCWIP) identifies Southend City Centre, Westcliff, Shoeburyness, Eastwood, Leigh (London Road and Leigh Broadway), Prittlewell Chase, Southchurch and Thorpe Bay as walking zones which contain a high density of trip attractors, providing opportunities for improving the pedestrian experience in terms of safety, attractiveness, comfort, directness and coherence. The highest potential areas for cycle growth in the city, based on existing cycle flow data and key points of interest such as town centres, hospitals and workplaces are Central Southend, Westcliff and Leigh, where short, medium and long-term route improvements can be focussed, providing safer and more attractive cycle routes, generally on quieter, more lightly trafficked roads. 10.12 Developments* should be supported by a Transport Statement or Transport Assessment. The current thresholds are set out in Council’s Local Validation List. Comprehensive information should be provided to support planning applications. 10.13 The Southend-on-Sea LTP seeks to tackle congestion by promoting active travel. It places greater emphasis on travel plans and by the incorporation of other sustainable travel modes to influence people’s travel behaviour towards more sustainable alternatives. Applicants will need to agree appropriate sustainable travel measures with the Council prior to a planning application submission. A travel plan and arrangements for its monitoring will be required for any proposal where the Council considers it necessary, based on the potential individual or cumulative impact of the proposal on the area. 10.14 The overall aim is to limit the growth in traffic congestion as part of an overall package to make other more sustainable forms of transport more attractive. Developments should mitigate transport impacts according to the following hierarchy: ● reduce overall travel demand; ● minimise mode share by private car; ● seek to spread or time shift demand away from peak hours as well as considering off-peak effects; ● offset residual impact through highways improvements, which must be achieved with no adverse impact on highway safety or to users of sustainable modes. 10.15 Southend benefits from a “metro quality” of service on its rail corridors. The C2C line provides around four trains per hour east- west to seven stations across the south of the city and onward to Basildon and London Fenchurch Street. The Greater Anglia line from Southend Victoria to London Liverpool Street provides access from Southend through to London Southend Airport and onto Stratford and London Liverpool Street. The city’s railway stations perform an important role in supporting complete and accessible neighbourhoods. 10.16 The two railway lines operate in isolation to each other with a half mile gap between Southend Central and Victoria stations along the High Street in the City Centre. While all the stations operate effectively there are opportunities for improvements, especially to the two central stations. Southend Central station in particular is somewhat hidden from the High Street and has a poor external environment, particularly to its forecourt fronting Clifftown Road. While there is some level of bus interchange at most stations it is only at Southend Victoria that this is particularly effective. 10.17 Southend Central and Southend Victoria railway stations are key gateways to the city and are integral to the sustainable development of Southend Central neighbourhood, including the City Centre. The rail stations of Leigh, Thorpe Bay, Shoeburyness and at London Southend Airport have also been identified as mobility hubs, which are places in a community that can maximise shared transport and interchange with public transport and active travel in spaces designed to improve the public realm for all. How
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Eastwood📍 Fossetts📍 Leigh📍 Prittlewell📍 Southchurch📍 Southend📍 Southend-on-Sea📍 Westcliff
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.