← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / SP5

Policy SP5

Homes

On pages 57 to 67 of the official PDF.

The human version

This policy, Strategic Policy SP5, plans for 14,700 net dwellings to 2045. These are split between Southend Central Neighbourhood (3,600), Land North of Southend (4,900), Fossetts Farm (1,350), other neighbourhoods (1,850) and windfall (3,000). Delivery is stepped: 365 dwellings a year in 2025-2030, 655 in 2030-2035 and 960 in 2035-2045. Homes will come from existing permissions, site allocations, opportunity sites and windfall. Affordable housing is required on all sites of 10 or more dwellings, and the loss of homes will be resisted. No need for gypsy or traveller pitches is identified, but criteria are set for any future application.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 57

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Strategic Policy SP5: Homes The Delivery of new homes 1. Provision is made for 14,700 net dwellings to 2045, distributed as follows: i. Southend Central Neighbourhood (incorporating City Centre and Central Seafront): 3,600 ii. new neighbourhoods at Land North of Southend: 4,900 iii. a new community at Fossetts Farm: 1,350 iv. the other neighbourhoods of Southend: 1,850 v. intensification across the city (windfall): 3,000 This requirement will be phased so a greater proportion of homes are delivered in the latter half the plan period. This will help ensure the provision of requisite infrastructure. 2. This requirement will be broken down into an annual average requirement on a stepped basis as follows: i. Y ears 1-5 (2025-2030): 365 dwellings per annum (dpa) ii. Y ears 6-10 (2030-2035): 655 dpa iii. Y ears 11-20 (2035-2045): 960 dpa 3. This will be achieved by: i. promoting the efficient use of land/ sites across the city by optimising densities, particularly in highly accessible locations and those with the most capacity to accommodate new homes, whilst respecting the local distinctiveness of Southend’s Neighbourhoods and protecting the city’s built, natural and historic environment; (see DM7.2 and DM7.3) ii. requiring residential development schemes within designated centres to include replacement and/ or new retail and commercial uses, in order to safeguard, maintain and enhance the vitality and viability of these shopping and commercial areas. iii. requiring a vibrant mix of employment, residential and community uses on larger sites, to support greater economic and social diversity and sustainable transport principles by creating places where residents can meet their daily needs within a short walk/ cycle if they so wish. WITH PLANNING PERMISSION iv. the implementation of existing planning permissions to deliver 3,500 new homes*. WITHOUT PLANNING PERMISSION (see chapter 12 and policies map for all site proposals) v. Allocating land for development to deliver an additional 7,700 new homes * vi. identifying Broad Locations/ Opportunity Sites to deliver an additional 500 new homes*, including underutilised employment sites. vii. positively considering proposals for the provision of homes from other sites (windfall development) to deliver 3,000 new homes*. In this regard the Council will support the improvement and/ or renewal of existing housing estates and sheltered housing to provide high quality, adaptable, energy efficient homes. Opportunities to increase the net number of units will be considered favourably unless adverse impacts would significantly and demonstrably outweigh the benefits, when assessed against the policies in the Development Plan when taken as a whole. If redevelopment is proposed the tenure and affordability of any potential new accommodation should not preclude existing residents or suitable accommodation is available elsewhere locally. The type of new homes 4. In order to provide a choice of housing the Council will seek to deliver 14,700 new homes by: i. delivering a wide choice of high-quality, safe and well-designed homes that contribute to the creation of mixed, balanced, inclusive and sustainable communities, meeting space standards and providing useable amenity space (Policy DM5.2, DM5.5, DM7.1). ii. requiring the provision of affordable housing on all sites of 10 or more dwellings (net) (Policy DM5.1). iii. positively manage the impact of houses in multiple occupation (Policy DM5.6). iv. resist development proposals that involve the loss of dwellings, having regard to the limited land resources in the city, the need to safeguard an adequate stock of single family dwellinghouses, and to protect the character of residential areas (DM5.3 and DM5.4). Gypsies and Travellers 5. Gypsy and Traveller Area Assessments* identify that there is no need for gypsy or traveller pitches in Southend during the Plan period and this would be the starting position should any application for new pitches be made. Only where it can clearly be established that changing circumstances indicate that there is a clear identified need for new gypsy or traveller pitches in Southend will applications be considered. In such circumstances applications will need to meet the following criteria. Sites should: i. be available and deliverable and have access to local services; ii. be of an appropriate size that can satisfactorily accommodate the planned number of caravans/pitches; the need for space for commercial vehicles; play area for children; amenity blocks; and space for the safe circulation of vehicles (and for Travelling Showpeople space for the storage and maintenance of equipment); iii. provide an acceptable living environment and conditions for residents with respect to noise, light and privacy; iv. allow for the successful integration of the scheme with neighbouring uses and not detrimentally impact upon the local environment and the settled community; v. incorporate a planned and integrated landscaping scheme; vi. be located so that the site has good and safe access to the highway network and essential services such as health and education facilities; vii. provide access to water supply, sewerage, drainage and waste disposal and management; and viii. be made acceptable in respect to flood risk as a highly vulnerable use. *Approximate number of new homes delivered by 2045 **Southend-on-Sea City Council Gypsy and Traveller Accommodation Assessment (GTAA), 2024 Why we have taken this approach 5.3 Over many years Southend has continued to grow leading to pressure on its social and physical infrastructure. It is also suffering from a worsening housing crisis, with higher rates of overcrowding, enforced house sharing and homelessness compared to the national average. House prices and private rents continue to outstrip local wage levels, and it is very hard for young people to get on the housing ladder. 5.4 The Local Plan seeks to provide people with a choice of decent, well-designed housing to meet their needs at a cost they can afford. There is a need to plan for an annual increase in housing and to identify the location of new homes and provide for a variety or mix of homes in terms of type, size and tenure (the type of new homes). 5.5 It is important that new development is accompanied by supporting infrastructure, meets a range of local housing needs and contributes to the creation of mixed and sustainable communities by respecting local distinctiveness and protecting the built, natural and historic environment. What it will look like Figure SP5: Distribution of new homes to 2045 (Planning Permissions + Allocations + Opportunity Sites) Plus 3,000 new homes from windfall development The Delivery of New Homes 5.6 It is vital that growth in Southend is ‘infrastructure led’. This means that the provision of new homes is supported by improvements in the quality of services, transportation, and facilities for the future health, education, emergency services, sports and leisure and community needs of residents. (Strategic Policy SP3 sets out the approach to securing and improving infrastructure). 5.7 In seeking to meet future housing needs and creating balanced and sustainable communities in the face of limited land resources, it will be essential that not only is optimum use made of available sites but that these are developed to a high standard and quality of design to ensure the successful integration of the scheme within the area and that the character and amenities of existing residential areas are protected in accordance with the provisions of Chapter 7 of this Plan (Urban Design, Character and Heritage). It will also be important to ensure that a wide choice of homes is delivered providing for a range and mix of housing to meet future identified needs, with homes designed to provide a good standard of accommodation and amenity space (see Policy DM7.1: Design Quality). 5.8 The Local Plan makes provisions for at least 14,700 homes that could be sustainably accommodated within Southend, including land at Fossetts Farm and through the provision of a new neighbourhood on land north of Southend by 2045. 5.9 The Local Plan preparation process has highlighted that there is not enough land to meet housing need as defined by the national standard methodology, despite multiple call for sites (allocations), identifying broad locations for development (opportunity sites), 32 Southend Housing Needs Assessment (2026) applying a range of density assumptions based on typologies and making an allowance for unidentified development based on past rates (windfall). Appendix 2 provides more information on the sources of supply in delivering new homes. The type of new homes 5.10 A large portion of the resident population find it difficult to afford a home. With rising house prices and interest rates, and large deposits required, owner occupied housing is increasingly becoming beyond the financial means of a significant number of local residents. This trend is reflected in a significant growth in the private rented sector. However, the private rental sector has also witnessed increasing rental values which have exacerbated the affordability issue. 5.11 Privately rented households are likely to increase in number in Southend given projected growth in this type of housing – such as unrelated sharing adults and families. This demand could be predominantly met through stock managed by private landlords but Build to Rent schemes may also become more prominent in the city. 5.12 In line with wider trends, Southend will see the ageing of its population over the plan period, generating a requirement for specialist housing to meet their specific needs and consideration of opportunity to enable people to live independently in their own homes for as long as possible 32. There also remains a need for family sized housing, which is suitable for a wide range of occupiers, balancing demographic trends towards smaller average household sizes and the projected ageing population whilst acknowledging potential demand for larger and more flexible living spaces that can adapt to needs including homeworking and reflect existing problems of overcrowding. The student population in Southend has been stable in recent years but following the closure of the university campus within Southend (which will see study relocated to Colchester), it is considered that there a no specific housing needs of students that need to be planned for 33. 5.13 The provision of housing also impacts on people’s health and wellbeing which need to be addressed in all development schemes. This includes internal space, accessibility and adaptability, outdoor amenity space, and suitably adapted homes to support independence at home. Future development should therefore seek to provide for a diverse range and mix of housing products within the local housing market including the affordable sectors. This is necessary to meet the housing needs of the city, including units suitable for families, older people, and people wishing to build their own homes. In seeking to meet this provision, it is essential that the existing residential stock is safeguarded and planning applications that result in the loss of residential accommodation will not normally be permitted, particularly small family dwellinghouses providing accommodation for families with children. 33 Southend Housing Needs Assessment (2026) 34 South Essex Gypsy and Traveller Area Assessment Update, 2019 35 Southend-on-Sea City Council Gypsy and Traveller Accommodation Assessment (GTAA), December 2024 36 Planning Practice Guidance (PPG), Planning Policy for Traveller Sites, Ministry of Housing, Communities and Local Government, December 2024 (Paragraph 11) Gypsies and Travellers 5.14 Gypsies and Travellers have their own specific housing requirements. The South Essex Gypsy and Traveller Area Assessment Update 201934 does not identify any need for permanent pitches within the city. This is reiterated in the more recently completed assessment undertaken specifically for the Southend area with no identified need over the plan period. 35 However, while there is no current identified need for Gypsy and Traveller sites in the city, Policy SP5 sets out a criteria-based framework should any established need be identified and an application be received for such facilities. This accords with national guidance36. Affordable Housing – development management policy Strategy and Objectives Linkage Strategic Objective 2 Strategic Objective 3 Strategic Objective 9 Strategic Policy SP5 Why we need this Policy 5.15 House prices in Southend have risen considerably over the past 20 years partly fuelled by strong house price growth in London and as a result of a limited housing supply in reference to the size of the population. This combined with the requirement for purchasers to have an initial deposit has created an increasingly significant barrier for people wishing to purchase their own home. Many of these households have turned to alternative housing products with smaller immediate financial requirements, thereby delaying their buying of a home. 5.16 The private rented sector has seen considerable growth as a result with the cost of privately renting any size of property rising most notably for properties with three bedrooms. However, despite increasing rental levels, Southend has the lowest rents, both overall and for each size of property, in South Essex 37. In Southend the percentage of private renting increased from 22.0% in 2011 to 26.5% in 2021 whilst the rate of social renting remained constant at 11.5% and the rate of home ownership decreased from 65.2% to 61.3%. As 37 ONS (2021) Private Rental Market Statistics 38 National Planning Policy Framework 2024, Annex 2 Glossary (further detail on each of the affordable housing types provided in this glossary). 39 National Planning Policy Framework 2024 – paragraphs 65 and 66. a result of these circumstances many people in Southend who want to own their own homes simply cannot afford to do so. In addition, over a third of newly arising households are now unable to afford a lower quartile private sector rented property without spending over a third of their income on rent. 5.17 The National Planning Policy Framework (NPPF) requires local authorities to assess the number of affordable homes that are evidenced as being required in their area. Affordable housing is defined as: “housing for sale or rent, for those whose needs are not met by the market (including housing that provides a subsidised route to home ownership and/or is for essential local workers); and which complies with one or more of the following definitions: Social Rent, Other affordable housing for rent, discounted market sales housing, Other affordable routes to home ownership 38” 5.18 National Planning Policy provides that affordable housing should not be sought for residential developments that are not major developments (less than 10 units) and on major development sites planning policies and decisions should expect that the mix of affordable housing required meets identified local needs, across Social Rent, and other affordable housing for rent and affordable home ownership tenures39. 5.19 The planning guidance establishes a methodology 40 for assessing affordable housing need which takes into account households on the Council’s housing registers, newly arising households in need as a result of changing circumstances (for example when their financial or family circumstances change) and the available supply of affordable housing taking into account lettings, the release of occupied affordable homes and committed supply. This results in a significant need for affordable housing well above recent delivery. The Housing Needs Assessment identifies net annual affordable housing needs in Southend of 678 affordable homes for rent and 192 affordable homes for ownership (intermediate). This supports a proposed tenure split for new affordable housing of 80% being affordable housing for rent (e.g. affordable rent or social rent) and 20% being affordable routes to home ownership (e.g. intermediate tenures, such as shared-ownership). 5.20 In terms of affordable homes to rent there is a high identified need for social rent. However, for households who fall into need for any type of affordable rented housing (whether Affordable Rent or Social Rent) it would be reasonable to assume that their needs would be met by any form of affordable rented housing, because they would be provided with the necessary top-ups to their housing benefit (or universal credit) to enable them to live in affordable housing, considering their needs and income. Ultimately, the proportion of affordable housing that is Social Rented on any site will necessarily be subject to viability, taking into account any grant funding availability. The Southend Local Plan Viability Study tested 40 PPG Section 67 – “Housing needs of different groups”; relevant paragraphs last revised in July 2019. At the time of writing, Section 2 of the PPG (“Housing and economic needs assessment”) retains almost identical guidance on assessing affordable housing needs, which was last revised in February 2019. 41 Southend Housing Needs Assessment (2026) the application of the 80% affordable housing for rent on a 50% basis between social rented and affordable rented and found that development was broadly viable over the plan period. 5.21 Policy SP5: Homes establishes that due to the limited availability of land it is not possible for Southend to meet the Government’s objectively assessed standard method in full, nor the identified scale of affordable housing need which is part of that overall need. Nevertheless, the methodology for assessing affordable housing need highlights the significant demand for affordable housing in Southend and the need to make optimum use of land and property resources in seeking to maximise the opportunities for achieving affordable housing provision whilst recognising the viability constraints to achieving this in terms of land purchase, development and other related costs. The plan also recognises the need for provision of key worker housing, encouraging opportunities for delivery, supporting local need, working with registered providers. 5.22 The assessment of affordable housing need when broken down by the size of property required suggests that in Southend there is a shortfall of every size of property, and in the short term there are significant needs for 2 and 3 bed properties, and likely demand for 1 bed properties in the longer term41. 5.23 In seeking to meet the need for affordable housing, the Council has applied an affordable housing policy since 2007 as contained in its Core Strategy. This sought to ensure that in residential developments of 10-49 dwellings (or 0.3 hectares up to 1.99 hectares) not less than 20% of the total number of units were affordable, whilst for residential proposals of 50 dwellings (or 2 hectares) or more, not less than 30% of the total number of units on the site were affordable. 5.24 The NPPF requires Local Plans to be informed by viability assessments based on market evidence. This is to ensure planning policies are set at a level so as not to place an unreasonable burden on development so it can be demonstrated that growth set out in the local plan is broadly deliverable over the plan period. The plan should not expect every site to be ‘deliverable’ now, within the current market, but with a realistic prospect of sites coming forward at a later date. 5.25 The Local Plan Viability Study notes that affordable housing will have an impact on development viability. It groups places in Southend into two value areas reflecting stronger and weaker viability. Value Area 1 reflects relatively lower values and comprises Westcliff, Prittlewell, Southend Central, Southchurch, Fossetts and an area of Shoeburyness, where viability is more marginal for flatted development on brownfield land. Therefore, an affordable rate of 10% is recommended for brownfield flatted development within Value Area 1 and 30% for all other residential development. Value Area 2 includes Leigh, Eastwood, Thorpe Bay and parts of Shoeburyness, where 30% affordable housing is recommended for all types of residential development. The Viability Study recommends 45% affordable housing for Bournes Green New Neighbourhood (see Policy DM2b – site proposal BG001). 42 https://localplan.southend.gov.uk/evidence-documents How the Policy Works 5.26 The policy provisions are based on current and future demographic and market trends which indicate a significant need for affordable housing provision in Southend to meet the locally generated needs to 2045. 5.27 The Policy presents the rate of affordable housing to be applied to new major development schemes, applying a rate that reflects the viability across different parts of the city as informed by the Local Plan Viability Study 42. 5.28 Policy Table DM5.1 reflects the findings of the Integrated Needs Assessment (2026) and is intended to provide an overall target for new residential development within the city. For individual development proposals the preferred dwelling mix should not be treated as a definitive mix but should be used during negotiations. When considering development proposals that deviate from this mix, the Council will take account of the latest available evidence from the HNA (or its equivalent successor); meeting specific needs (including for older people) the site context; viability and any pressing short-term housing need as identified by Southend Council’s Homeseekers Register. For Build to Rent schemes, an affordable housing or key worker provision of not less than 20% of the total number of units will be applied. Policy Table DM5.1: Affordable Rent and Intermediate Dwelling Mix (2026) Property Size (affordable rent) Property Size (intermediate) 1 bed 2 bed 3 bed 4+ bed 1 bed 2 bed 3 bed 4+ bed Proportion of dwellings 40-50% 30-35% 20-25% 0-5% 60-70% 20-40% 0-10% 0-5%
Gypsy & Traveller sitesHomes & housingInfrastructure & utilities📍 Eastwood📍 Fossetts📍 Leigh📍 Prittlewell📍 Southchurch📍 Southend📍 Southend-on-Sea📍 Westcliff
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.