This section introduces the housing policies H1 to H7. The Plan provides a minimum of 9,946 net additional dwellings between 1 April 2027 and 31 March 2042, through a stepped trajectory. Supply comes from commitments of around 1,612 dwellings, about 2,350 at Redhill Aerodrome from year 6, about 4,124 on new allocations, about 1,300 from the Settlement and Windfall Study and about 560 from rural windfall. Land next to Redhill Aerodrome is removed from the Green Belt but not allocated. The stepped requirement rises from 350 dwellings in 2027/2028 to 600 a year, averaging 470 over five years, then 760 a year from 2032/2033.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
6. Housing policies
6.1 Providing enough homes is only one component of meeting the district’s housing needs. The Local Plan
must also ensure the homes delivered are affordable, provide an appropriate range of sizes, types and
tenures, respond to the needs of different sections of the community and contribute to mixed, inclusive and
sustainable places.
6.2 The Tandridge District is characterised by a high-value and constrained housing market, with significant
affordability pressures and a diverse range of housing needs. The HEDNA identifies substantial need for
affordable housing along with requirements arising from changing household composition, an ageing
population and the housing needs of people requiring accessible, adaptable or specialist accommodation.
The Plan must also make appropriate provision for Gypsies, Travellers and Travelling Showpeople.
6.3 The housing policies should be read alongside the Spatial Strategy and the relevant site allocation policies.
Policy H1 sets out the sources of supply to meet the Plan’s housing requirement. The remaining housing
policies establish the requirements for the composition and form of the different types of housing that will
be delivered over the plan period.
6.4 The Council will seek to ensure new housing contributes positively to the creation of balanced communities
and responds to identified needs throughout the Plan period. The detailed mix and form of provision will
be considered having regard to the latest evidence of housing need, the characteristics and location of
individual sites, viability and the requirements of other relevant Local Plan policies.
6.5 The housing policy suite comprises:
Policy H1: Housing requirement and supply.
Policy H2: Affordable housing.
Policy H3: Housing mix and space standards.
Policy H4: Housing for older people and accessible homes.
Policy H5: Self build and custom build housing.
Policy H6: Gypsy, Traveller and Travelling Showpeople accommodation.
Policy H7: Houses in Multiple Occupation.
Meeting housing need
6.6 The Plan makes provision for a minimum of 9,946 net additional dwellings between 1 April 2027 and 31 March
2042. This will be delivered through a stepped trajectory to reflect that it will take time for the market to
increase the delivery rate from current levels. Delivery is drawn from existing commitments, new allocations,
strategic development at Redhill Aerodrome, additional settlement capacity, permissions expected to be
granted before 31st March 2027 and rural windfall development. In addition, the five year housing land supply
will be assessed against the stepped trajectory and include any buffers required by national planning policy.
Commitments
6.7 Commitments make an important contribution to supply. They comprise housing supported by an extant
planning permission as well as an allowance for dwellings expected to be approved by 31 March 2027. This
source amounts to around 1,612 dwellings at the time of publication. This will be updated prior to submission.
Strategic development at Redhill Aerodrome
6.8 Redhill Aerodrome is expected to provide approximately 2,350 dwellings as part of a comprehensively
planned, infrastructure-led community. Because development of this scale and complexity involves longer
lead-in times, its delivery is phased across the Plan period to start from year 6 in accordance with Policy
ALL1, the site masterplan and the Infrastructure Delivery Plan.
6.9 Additional land adjacent to Redhill Aerodrome, in the Tandridge District boundary has been removed
from the Green Belt in this plan. While it is not allocated, it is identified as an opportunity area to assist in
addressing any residual housing need over the plan period through the principal strategic growth location
identified in the Spatial Strategy. The land is not allocated for development and will only be brought forward
through a review of this Plan or a successor development plan. In the interim, it will be protected from
development that would prejudice its long-term development potential.
New housing and mixed-use site allocations
6.10 New housing and mixed-use site allocations are expected to contribute approximately 4,124 dwellings. Sites
have been selected through the assessment of major residential planning permissions, the Housing and
Economic Land Availability Assessment, land in the Green Belt identified as potentially suitable in the Green
Belt Assessment and other site-specific evidence, having regard to deliverability, infrastructure capacity and
environmental constraints.
Settlement and Windfall Study
6.11 This source of supply identifies approximately 1,300 dwellings from redevelopment, intensification and
other opportunities within defined settlement boundaries that are not already counted as commitments or
allocations. The assessment defines areas of search by reference to existing built form, settlement geography,
services and constraints. It combines a review of known land sources with a systematic survey to identify
opportunities for redevelopment, intensification, infill and regeneration and assesses capacity having
regard to local densities, plot ratios and site constraints. Sources considered include small Council-owned
garage sites, settlement capacity opportunities identified through the HELAA, regeneration opportunities
and additional sites identified through the survey process. Existing public open space, community facilities,
in-use car parks, shops and employment premises are not relied upon as sources of supply, although
opportunities such as residential development above shops may contribute where appropriate.
6.12 The allowance represents additional capacity beyond sites already counted as commitments, allocations or
other identified sources of supply and will be monitored to avoid double counting. The significant majority
of supply will come from allocated sites. However, there is clear evidence that historic intensification and
brownfield re-development will continue within settlements and remain an important component of supply.
Delivery is assumed within the latter part of the Plan period, with individual proposals remaining subject to
the policies of the development plan and the assessment of availability and deliverability.
Rural windfall
6.13 Rural sites have historically provided a consistent source of housing in the District. The allowance of
approximately 560 dwellings over the Plan period is based on evidence of past delivery and expected future
trends. This reflects the contribution expected from otherwise acceptable development opportunities
arising outside the identified settlement supply, including redevelopment and regeneration opportunities
on previously developed land, rural brownfield sites, conversions, self-build and custom-build housing, rural
exception schemes and other forms of development supported by the policies of this Plan. The allowance
does not assume the release of additional unallocated Green Belt or countryside sites beyond those identified
through the Plan and supported by national policy.
Stepped housing requirement
6.14 Recent housing delivery has averaged approximately 247 dwellings each year. An immediate increase to
deliver the Plan’s housing requirement would not reflect the time required to bring forward new allocations,
secure permissions and supporting infrastructure and establish higher build-out rates. The proposed stepped
requirement commits to an upward trend of delivery with 350 dwellings in 2027/2028, 400 dwellings each
year in 2028/2029 and 2029/2030 and then 600 dwellings each year in 2030/2031 and 2031/2032. For a total
delivery of 2,350 over the first five years at an average rate of 470 dwellings each year in this part of the Plan
period. For years 6 to 15 the trajectory will step up from year 6 (2032/2033) to an expected annual average
delivery rate of 760 dwellings each year. This approach reflects the expected expansion of delivery from
allocations including from the strategic development site.
Infrastructure and delivery
6.15 Housing delivery cannot be considered separately from the infrastructure needed to support it. The
Infrastructure Delivery Plan identifies what is required across sectors including transport, water, wastewater,
education, health and green infrastructure and how and when it will be delivered.
6.16 Delivery will be monitored annually against the housing requirement and the contribution expected from each
source identified above, including performance against the five-year housing land supply and the Housing
Delivery Test, with the housing trajectory and where necessary, this Plan’s policies kept under review.