OpenConsult / Tandridge plan / 8. Infrastructure and transport

From the plan

8. Infrastructure and transport

On pages 47 to 48 of the official PDF.

The human version

This section introduces the infrastructure and transport policies INF1 and INF2. It says development must be coordinated with timely infrastructure, as capacity varies across the district. Infrastructure covers transport, education, healthcare, water, wastewater, flood and drainage, energy, digital links and community facilities. The Infrastructure Delivery Plan (IDP) is the main evidence and will be kept up to date. Funding can come from developer contributions, the Community Infrastructure Levy (CIL), public investment and other sources, but funding strategic infrastructure remains challenging. Contributions should only address a development's own impacts. Cumulative impacts matter, and some development may need phasing. Land for future infrastructure should be safeguarded.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 47

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

8. Infrastructure and transport 8.1 The delivery of the Local Plan’s Spatial Strategy depends on development being supported by the provision of suitable and timely infrastructure and a reliable transport network necessary to create sustainable, well- functioning and resilient communities. Infrastructure capacity varies across the district and in some locations, existing networks and services are already constrained. The scale, location and timing of development must be coordinated with the provision of infrastructure rather than considered separately from it. 8.2 Infrastructure includes the physical, social and environmental facilities and networks necessary to support development and communities. This includes transport, education, healthcare, emergency services, community, cultural, sports and leisure facilities, green and blue infrastructure, water supply and wastewater treatment, flood and drainage infrastructure, energy, waste and recycling and digital and telecommunications infrastructure. 8.3 The Infrastructure Delivery Plan (IDP) provides the principal evidence base for infrastructure planning. It establishes the baseline position, identifying existing provision, capacity, known constraints and evidence gaps. It then goes on to assess the additional demands arising from the scale and distribution of growth proposed by the Local Plan and identify the infrastructure interventions required to support growth, including their broad timing, delivery responsibilities, dependencies and potential funding sources. The IDP is intended to remain a live document and will be updated as further information becomes available and infrastructure priorities, programmes and funding arrangements evolve. 8.4 Infrastructure can be delivered in several ways, including through direct delivery, developer contributions, Community Infrastructure Levy (CIL), public sector investment (such as central government funding for major projects), utility billing, Strategic Access Management and Monitoring (SAMM) contributions and through the business plans of statutory undertakers. As government funding continues to be limited and developer contributions are often affected by viability issues, funding strategic infrastructure remains challenging. 8.5 Transport forms a particularly important component of infrastructure planning in the district, which is heavily car dependent. The Tandridge District has strong strategic connections to London, Gatwick Airport and surrounding economic centres, but also contains dispersed rural communities with more limited public transport accessibility. Existing pressures on parts of the local and strategic road networks, variable bus provision and constraints affecting active travel mean that development must both minimise additional transport impacts and maximise realistic opportunities for sustainable movement. 8.6 The Infrastructure and Transport policy suite comprises: Policy INF1: Infrastructure delivery and funding. Policy INF2: Transport and sustainable movement. Infrastructure delivery 8.7 The IDP identifies differing levels of capacity across the Tandridge District. Issues include existing constraints affecting parts of the strategic and local transport networks, primary healthcare, potable water supply and wastewater treatment. Education provision presents a more varied picture, while energy, emergency services, digital infrastructure and community facilities have their own investment and delivery requirements. 8.8 These findings do not by themselves establish the additional infrastructure requirement generated by the Local Plan. The IDP also assesses planned growth against available capacity and identifies the additional provision or mitigation necessary. It is a crucial piece of evidence which will support the proposed Spatial Strategy, by identifying what interventions are required and whether development needs to be phased to align with their delivery. 8.9 Infrastructure requirements will continue to evolve during the plan period. Investment programmes, service models, technology, demographic pressures and infrastructure-provider priorities may change. The IDP will be kept under review and will provide the appropriate mechanism for maintaining detailed information on individual projects, costs, delivery organisations, funding sources and delivery status without requiring frequent changes to the Local Plan itself. 8.10 Where a development generates a need for additional infrastructure, it should contribute only to the extent necessary to mitigate the impacts arising from that development and in accordance with the relevant statutory and national policy tests. Developer contributions are not intended simply to remedy unrelated existing deficiencies. However, where an existing facility or network requires enhancement to accommodate additional development, a proportionate contribution towards that intervention may be appropriate. 8.11 The distributed nature of planned growth makes consideration of cumulative impacts particularly important. Multiple developments may affect the same school planning area, GP catchment, wastewater treatment works, transport corridor or community facility even where the impact of each development considered individually is modest. Infrastructure planning and developer contributions may need to be coordinated across several sites. In some circumstances, development may need to be phased to ensure necessary infrastructure is delivered at the appropriate stage and occupiers are not reliant on infrastructure which has yet to be provided. Site allocation policies will identify infrastructure requirements that are fundamental to the delivery of individual allocations. This is particularly important where the scale or location of development means a specific item of infrastructure, land requirement or delivery trigger is necessary to establish that the site is developable and deliverable. 8.12 The Council expects infrastructure requirements to be considered at an early stage in the development process. This includes, where necessary, direct liaison with the relevant infrastructure provider such as utility and water companies to ensure capacity and connection at the time of application. For major development proposals and other proposals where significant infrastructure requirements or known capacity constraints exist, applicants may be required to submit proportionate information demonstrating how infrastructure needs will be addressed. This may include infrastructure capacity, mitigation measures, delivery responsibilities, funding arrangements and any necessary phasing or occupation triggers. 8.13 Certain infrastructure projects may require the safeguarding of land routes, corridors or operational assets to ensure their future delivery, operation or enhancement. Development should not prejudice infrastructure identified through the Local Plan, Infrastructure Delivery Plan, Local Transport Plan, Local Cycling and Walking Infrastructure Plan or other adopted strategies and committed infrastructure programmes unless suitable alternative provision can be secured.
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Tandridge
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.