OpenConsult / Tandridge plan / 9. Water management

From the plan

9. Water management

On page 52 of the official PDF.

The human version

This section introduces the water management policies WAT1 to WAT4. It says growth should be resilient to flood risk and climate change and should not overload water resources, drainage or wastewater networks. Development should follow the sequential approach to flood risk, use sustainable drainage and cut demand for potable water. The Plan draws on Level 1 and Level 2 Strategic Flood Risk Assessments and a Water Cycle Study, with any mitigation set out in the Infrastructure Delivery Plan. Applicants should talk to water companies early. The Council will work with the Environment Agency, SES Water, Southern Water, Thames Water and others.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 52

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

9. Water management 9.1 The Local Plan seeks to ensure growth is directed and designed in a manner which is resilient to flood risk and climate change and does not place unacceptable pressure on water resources, drainage networks or wastewater infrastructure. Development should follow the sequential approach to flood risk, manage surface water at source through multifunctional sustainable drainage systems, minimise demand for potable water and protect the quality and ecological function of the water environment. 9.2 Development will be required to manage water sustainably throughout its lifetime, informed by the most up-to-date flood risk, water resources and infrastructure evidence and must demonstrate it can be accommodated without increasing flood risk, adversely affecting the water environment or proceeding ahead of the water and wastewater infrastructure necessary to support it. 9.3 The Water Management policy suite comprises: Policy WAT1: Integrated water management. Policy WAT2: Flood risk. Policy WAT3: Surface water and Sustainable Urban Drainage systems. Policy WAT4: Water resources, water quality and water infrastructure. Integrated water management 9.4 The sustainable management of water is fundamental to the delivery of the Local Plan. Water cannot be considered solely as an infrastructure issue. Flood risk, drainage, water resources, wastewater, water quality and the ecological condition of rivers and groundwater are interconnected and need to be considered collectively from the earliest stages of the design process. 9.5 The Local Plan is supported by Level 1 and Level 2 Strategic Flood Risk Assessments which have considered the cumulative effects of development. Individual developments may have limited effects when assessed in isolation, but the combined loss of permeable surfaces, flood storage and drainage pathways across a catchment can increase downstream risk. Development in catchments identified as particularly sensitive should seek opportunities to provide flood risk betterment and support wider catchment interventions where this is proportionate. Such measures may include additional flood storage, natural flood management, river restoration and enhancements to blue-green infrastructure. 9.6 The Water Cycle Study provides the detailed assessment of how the development proposed through the Local Plan interacts with water resources, supply infrastructure, wastewater networks, treatment capacity and the water environment. Its findings have informed the detailed water management policies and any identified mitigation is included in the Infrastructure Delivery Plan and where necessary, site-specific policies including details on any phasing triggers. The study has also helped to identify whether sufficient water supply, wastewater and drainage capacity exists or needs to be enhanced to accommodate planned growth. 9.7 Applicants should liaise at the outset with water companies to ensure where necessary, an increase in capacity can be included in their programmes. Development should not proceed ahead of infrastructure where doing so would result in unacceptable impacts on flood risk, water quality, wastewater capacity or water resources. 9.8 The Council will continue to work with the Environment Agency, the Lead Local Flood Authority, the Upper Medway Internal Drainage Board where relevant, SES Water, Southern Water, Thames Water and neighbouring authorities to coordinate water management and infrastructure provision throughout the plan period.
Flooding & waterInfrastructure & utilities
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.