← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / NE2

Policy NE2

Green and blue infrastructure

On pages 65 to 66 of the official PDF.

The human version

This policy says development must protect and, where suitable, improve the district's green and blue infrastructure, such as trees, hedgerows, watercourses, ponds and green spaces. It should avoid needless loss or breaks in the network, and unavoidable loss must be replaced or mitigated. Development on land not previously developed must provide green or blue infrastructure on site. Development on previously developed land must make the most of chances for urban greening. Features should serve several purposes where possible. Existing trees, hedgerows and water features must be kept, or applicants must explain why not. Management and maintenance must be shown for at least 25 years.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 65

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy NE2: Green and blue infrastructure 1. Development must protect and where appropriate, enhance the function, quality and connectivity of the Tandridge District’s green and blue infrastructure network. 2. Development should avoid the unnecessary loss, fragmentation or severance of green and blue infrastructure and should maintain and strengthen connections in the site and beyond to the wider network. 3. Where the loss of green or blue infrastructure is unavoidable, appropriate mitigation or replacement must be provided to maintain or improve the overall function and connectivity of the network. Green infrastructure provision 4. Development on land which has not been previously developed must provide onsite green and/or blue Infrastructure as an integral component of the scheme design. 5. Development on previously developed land must maximise opportunities for urban greening and provide green and/or blue infrastructure appropriate to the scale, nature and location of the development. 6. Green and/or blue infrastructure should be multifunctional wherever compatible and contribute to biodiversity, climate resilience, sustainable drainage, landscape character, recreation, health and wellbeing. Design and delivery 7. Major development and other development where green and blue infrastructure is fundamental to the structure of the site must demonstrate how existing and proposed green and blue infrastructure will form a coherent and connected network. 8. Trees, woodland, hedgerows, watercourses, ponds, wetlands and other features which are present on site should contribute to the green and blue infrastructure quota and must be retained and incorporated positively into development. Where retention is not possible, applicants will need to demonstrate why. 9. Development creating or relying upon green and blue infrastructure must demonstrate how it will be established, managed and maintained over at least 25 years. Countryside 11.32 The Tandridge District contains a distinctive network of towns, villages, hamlets and dispersed development set within a predominantly rural landscape. The countryside performs agricultural, economic, environmental, recreational and landscape functions and contributes strongly to the setting and identity of settlements. This policy seeks to accommodate sustainable rural development while ensuring that it does not result in the incremental urbanisation, fragmentation or erosion of rural character and the surrounding landscape. 11.33 The countryside performs a range of functions which extend beyond its visual appearance. These include food production and land management, biodiversity and ecological connectivity, natural flood management, carbon storage, recreation and access to nature, health and wellbeing, tourism and the maintenance of the physical and perceptual separation of settlements. The contribution made by land to these functions may be an important planning consideration even where the land is not subject to a specific landscape, ecological or Green Belt designation. 11.34 Incremental losses of countryside can individually appear limited but may collectively result in the fragmentation of agricultural land, the erosion of landscape character and structure, the weakening of settlement boundaries and the gradual urbanisation of rural areas. Development should therefore be designed and located so that it conserves the wider character, function and appearance of the countryside. 11.35 The District contains areas of Best and Most Versatile agricultural land which represent an important and finite natural resource. The Council will seek to avoid its unnecessary loss whilst recognising the role of agriculture, farm diversification and other rural enterprises in supporting the long-term economic vitality of the countryside. 11.36 The Spatial Strategy establishes the appropriate distribution of growth across the District. The role of Policy NE3 is not to establish an alternative basis for development outside the Spatial Strategy, but to manage development that may be appropriate in rural locations and to ensure cumulative changes do not result in the progressive suburbanisation or fragmentation of the countryside. 11.37 For the purposes of this Plan, countryside comprises land outside the defined settlement boundaries of settlements inset from the Green Belt. Policy NE3 does not apply to the principle of development on sites allocated through this Plan, which will be assessed against their allocation policies and the development plan as a whole. This reflects the fact that the principle of development on allocated sites has been established through the plan-making process.
Green Belt & countrysideInfrastructure & utilitiesNature & environment📍 Tandridge
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.