← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / WAT4

Policy WAT4

Water resources, water quality and water infrastructure

On page 57 of the official PDF.

The human version

This policy requires development to minimise demand for potable water and use water efficiently. New homes must use no more than 110 litres per person per day, or any replacement national standard. Measures such as rainwater harvesting and greywater recycling are encouraged where suitable. Development must protect the quality of rivers and groundwater, including Groundwater Source Protection Zones, and prevent pollution. Developers must show there is enough water supply, sewerage and wastewater treatment capacity, or that it will be delivered before development starts. Schemes must connect to the public foul sewer where reasonably practical and keep foul and surface water separate. Land for water infrastructure must be safeguarded.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 57

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy WAT4: Water resources, water quality and water infrastructure 1. Development must minimise demand for potable water and use water resources efficiently. 2. New residential development must achieve a water consumption rate of no more than 110 litres per person per day, or any replacement national standard. 3. Development should incorporate water efficient design measures and where appropriate to its scale and nature, measures such as rainwater harvesting, greywater recycling and water reuse. 4. Development must protect and where possible, enhance the quality of rivers and other watercourses. 5. Development must: a. Protect Groundwater Source Protection Zones, drinking water resources and other sensitive water environments. b. Prevent pollution from entering groundwater or watercourses. c. Maintain or enhance the natural function of watercourses where practical. d. Incorporate appropriate mitigation where risks to water quality are identified. Water supply and wastewater capacity 6. Development must demonstrate adequate water supply, sewerage and wastewater-treatment capacity is available to serve the development, or that the necessary infrastructure will be delivered prior to commencement of any development. 7. Where additional infrastructure is required to support development, applicants must demonstrate how it will be delivered, funded and phased. 8. Development will not be supported where it would lead to unacceptable impacts on water supply, sewerage networks or wastewater-treatment infrastructure that cannot be satisfactorily mitigated. Foul drainage and infrastructure 9. Development must connect to the public foul sewerage network wherever reasonably practical. 10. Non-mains foul drainage will only be supported where connection to the public sewer is not reasonably practical and where it can be demonstrated the proposed system would not result in unacceptable impacts on human health, groundwater, the water environment or nearby occupiers. 11. Foul and surface water drainage systems must be separated wherever practical. Development must not increase the discharge of surface water to the foul sewer network. 12. Development proposals must safeguard land required for existing or planned water supply, sewerage and wastewater infrastructure and must not prejudice its operation, improvement or future delivery. 13. Proposals for new or upgraded water supply, sewerage and wastewater infrastructure necessary to support planned growth will be supported where they are appropriately located and are in accordance with other policies of the Local Plan.
Flooding & waterInfrastructure & utilities
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.