← Open Consultation: all consultations

Three Rivers Plan Explorer

Search the Three Rivers Local Plan. 408 pages in two parts, made findable.

The consultation closes at 11:59pm, Sunday 6 September 2026.

OpenConsult / Buckinghamshire plan / 9 Maple Lodge Wastewater Treatment Works

From the plan

9 Maple Lodge Wastewater Treatment Works

On pages 162 to 163 of the official PDF.

The human version

This section covers Maple Lodge Wastewater Treatment Works, east of Maple Cross. It is a key infrastructure asset serving Three Rivers and the wider area, and keeps its designation as a significant infrastructure site in the Green Belt. The policy allows redevelopment or limited infilling to meet future operational needs, provided the continued use of the site for wastewater treatment is safeguarded, the mature landscaped boundaries are retained, and any further buildings are of comparable height to nearby structures on the site.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 162

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

9 Maple Lodge Wastewater Treatment Works 9.1 Maple Lodge Wastewater Treatment Works is a substantial developed feature in the local landscape to the east of Maple Cross and has an industrial character. It is a key infrastructure asset serving Three Rivers and the wider area. The pre -existing Site Allocations LDD (adopted 2014) identifies Maple Lodge Wastewater Treatment Works as a significant infrastructure site in the Green Belt. Within this Local Plan the Maple Lodge Wastewater Treatment Works retains its designation as a significant infrastructure site in the Green Belt. 9.2 It is recognised that change on the site may be required to meet future operational needs. Whilst redevelopment or limited infilling of the site may not be inappropriate development in the Green Belt, proposals should continue to take into account the provisions of the policy set out below and any redevelopment and limited infilling should safeguard the continued use of the site for wastewater treatment works. 9.3 The Maple Lodge Wastewater Treatment Works policy can be seen below. Maple Lodge Wastewater Treatment Works 1) Maple Lodge Wastewater Treatment Works is a significant infrastructure site in the district. 2) The landscaped setting provided by mature vegetation on the site boundaries and area surrounding the site should be retained in any proposals for infilling or redevelopment 3) Any further buildings should be of comparable height to other nearby structures on the site. Site Ref. MLWTW Site Maple Lodge Wastewater Treatment Works
Green Belt & countrysideInfrastructure & utilities📍 Maple Cross
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →

Deadline: 11:59pm, Friday 25 September 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.