← Open Consultation: all consultations

Three Rivers Plan Explorer

Search the Three Rivers Local Plan. 408 pages in two parts, made findable.

The consultation closes at 11:59pm, Sunday 6 September 2026.

OpenConsult / Buckinghamshire plan / CNZ1

Policy CNZ1

Renewable and Low Carbon Energy Developments

On pages 71 to 72 of the official PDF.

The human version

This policy allows renewable and low carbon energy schemes, including micro-renewables such as small wind turbines, micro-hydro and solar panels, and decentralised energy like combined heat and power. Support depends on an assessment of impacts on residential and workplace amenity, visual and landscape character, air and water quality, the natural, built and historic environment, biodiversity, public access to the countryside, and the openness of the Green Belt. The council will consider both individual and cumulative impacts of such applications.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 71

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

logies. CNZ1 - Renewable and Low Carbon Energy Developments 1) Proposals for renewable energy developments, micro-renewables (such as, but not limited to, micro-wind turbines, micro-hydro and solar panels), or low and zero carbon and decentralised energy (such as, but not limited to Combined Heat and Power systems) may be supported subject to assessment of potential impacts on: a) Residential/workplace amenity; b) The visual amenity of the local area, including landscape character; c) Local natural resources, including air and water quality; d) The natural, built and historic environments; e) Biodiversity; f) Public access to the countryside; g) The openness and visual amenity of the Green Belt; h) Other site constraints. 2) The council will take into account the individual and cumulative impacts of applications for renewable energy developments on the above. Reasoned Justification: 8.2 The council is keen to support the transition to a low carbon future and that the Local Plan should help to contribute to radical reductions in greenhouse gas emissions and support renewable and low carbon energy and associated infrastructure. 8.3 Hertfordshire as a whole has the technical potential to achieve a significant amount of renewable energy production by various means including Biomass, dedicated Combined Heat and Power facilities, Bio-diesel and Bio-ethanol. Given the district’s watercourses, there may also be opportunities for micro-hydro power generation. 8.4 Specific areas suitable for large -scale renewable and low or zero carbon and decentralised energy have not been identified. However, the council encourages applicants to integrate the use of renewable energy technologies into all proposals and supports the use of micro -renewables subject to an assessment of potential impacts. Net Zero Operational Carbon in New Build Residential Development 8.5 Operational carbon is an area where policy can ensure the provision of buildings that are fit for the future, both in terms of reduced energy consumption and holistic integration of design decisions that address climate adaptation. It is essential that housing developers prioritise these metrics and subsequent total energy consumption to best ensure that any on -site renewable energy can feasibly match total regulated energy use. If the energy use of a residential building is not mitigated in the first instance, on site renewable energy generation
Climate & energyDesign & placemakingInfrastructure & utilities
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →

Deadline: 11:59pm, Friday 25 September 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.