The human version (we wrote this, not the council)
This section sets out the site allocations for Croxley Green. Five housing sites are allocated with a combined indicative capacity of around 300 homes. The largest are Land at Croxley Station on Watford Road (163 homes) and Cinnamond House (80 homes), alongside smaller sites at garages off Grove Crescent (19), Land at Barton Way (8) and Land South of Scots Hill (30). Each site table lists size, phasing, whether land is greenfield or brownfield, Green Belt status and detailed requirements for future applications.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
CROXLEY GREEN
H27 – Land at Croxley Station, Watford Road
H27 – Land at Croxley Station, Watford Road, Croxley Green
SHELAA Reference:
CFS20
Size: 2.3ha
Proposed use(s):
Residential
Indicative Dwelling
Capacity: 163
Phasing:
0 – 10 years
Greenfield/Brownfield:
Brownfield
Green Belt / Grey Belt:
N/A (Not in Green Belt)
Main Development Requirements:
• Indicative dwelling capacity of 163
• Due to the nature of the site and proximity to open space, on-site provision of open space/ play
space will not be required
• A 3 metre development buffer area (except vehicular access) from the railway is required
• The existing level of parking serving the station should be retained unless a proposal is
accompanied by a parking survey and associated report provide robust evidence justifying any
reduction in the level of station parking
• Allow space for a transport interchange for the proposed Watford to Croxley Link
Site Constraints and Other Requirements and Considerations:
Access, Highways, Parking and Sustainable Transport
• The existing access via Watford Road should be utilised
• The existing level of parking serving the station should be retained unless a proposal is
accompanied by a parking survey and associated report robustly justifying any reduction in the
level of station parking
• Allow space for a transport interchange for the proposed Watford to Croxley Link
Design
• A 3 metre development buffer area (except vehicular access) from the railway is required
Flooding
• There is a small area at the north of the site at risk of surface water flooding. Ponding along the
embankment also occurs during heavy rainfall events. Any development would be required to
provide suitable mitigation to address surface water flood risk
• The council’s Level 2 SFRA (2026) has concluded that development should be steered outside
the areas of surface water flood risk on the site. Where this is not possible, flood resilience and
resistance measures should be implemented. Arrangements for safe access and escape will need
to be provided for the 1% AEP surface water events with an appropriate allowance for climate
change, considering depth, velocity, and hazard. A Flood Risk Assessment (FRA) must be
submitted at the planning application (and preferably pre-application) stage
• The LLFA have indicated that the site has high potential for groundwater emergence. Site-specific
ground investigations should be conducted to assess groundwater levels at the earliest stage
• The site is wholly within GSPZ1, which may limit the use of SuDS, deep foundations and below
ground development. A preliminary risk assessment is required at the planning (and preferably
pre-application stage) to determine whether there is contamination of the site, and whether
remediation works would be needed
Green Infrastructure, Biodiversity and TPOs
• Natural England state that the site triggers the SSSI Impact Risk Zones for residential
development. Natural England should be consulted at the planning application stage
Historic Environment
• Croxley Station is a Locally Listed Building. A Heritage Impact Assessment/ Heritage Statement
may be required at a planning application (and preferably pre-application) stage
Environmental Health and Pollution
• Potential noise and vibrations caused by the use of the station/railway line would need to be
addressed through mitigation measures . Relevant assessments and reports (such as Noise
Assessments) would be required at a planning application (and preferably pre-application) stage
Mineral and Waste
• HCC Mineral and Waste stated that consideration must be given to the use of material on site
through opportunistic extraction, in order to reduce the need for material to be imported
• A Site Waste Management Plan (SWMP) will be required to support any proposal at the planning
application stage
Utilities/ Infrastructure
• The HWE Integrated Care Board is likely to seek a financial contribution towards a new premises
solution for the New Road Surgery
H28 – Cinnamond House
H28 – Cinnamond House
SHELAA Reference:
CFS61
Size: 1ha
Proposed use(s):
Residential
Indicative Dwelling
Capacity: 80
Phasing:
0 - 5 years
Greenfield/Brownfield:
Mixed (mainly
brownfield)
Green Belt / Grey Belt:
The site is considered to be grey belt. During the Local Plan process the Green Belt boundaries were
altered, and the site was entirely removed from the Green Belt
Main Development Requirements:
• Indicative dwelling capacity of 80
• Play space/ open space would not be required given the brownfield nature of the site and
proximity to open space and play space, however, a financial requirement to improve local
open space/ play space may be required
Site Constraints and Other Requirements and Considerations:
Access, Highways and Sustainable Transport
• The existing access from Watford Road should be utilised
• Hertfordshire County Council state that an agreed access strategy should be agreed prior to
determination, and the developer is encouraged to undertake pre -application discussions with
HCC Highways
Historic Environment
• There are two Grade II Listed Buildings to the north of the site, which should not be impacted as
views from the site are blocked by the railway embankment. Another Grade II Listed Building is
situated to the east of the site, with the impact on this heritage asset dependent on the proposed
building height. Any future developer should consult the Conservation Officer at an early
design stage. A Heritage Impact Assessment/ Heritage Statement may be required at a planning
application (and preferably pre-application) stage
• HCC Historic Environment advised that the site includes/has potential to include heritage assets
of archaeological interest. Any development proposals on the site should be accompanied by a
pre-application or pre-determination archaeological assessment
Flooding
• The majority of the site is at risk of surface water flooding ranging from medium -high risk at the
western portion and low-medium risk at the southern portion respectively.. The LLFA also state
that the site is indicated to have high potential (>50%) for groun dwater emergence due to the
shallow groundwater levels. Site -specific ground investigations should be conducted to assess
groundwater levels at the earliest stage. Any development would be required to provide suitable
mitigation to address surface water flood risk and groundwater flood risk on the site
• The council’s Level 2 SFRA (2026) has concluded that the site is at significant surface water
flood risk. A Flood Risk Assessment (FRA) must be submitted at the planning application (and
preferably pre-application) stage. Future proposals will need to care fully consider this risk and
demonstrate users of the site can be kept safe during the lifetime of the development through a
detailed site-specific FRA including detailed surface water modelling. Development should be
steered away from the areas identified to be at highest risk of surface water flooding within the
site. Arrangements for safe access and escape will need to be provided for the 1% AEP surface
water events with an appropriate allowance for climate change, considering depth, velocity, and
hazard
• The site is wholly within GSPZ1 which may limit the use of SuDS, deep foundations and below
ground development. A preliminary risk assessment is required at the planning (and preferably
pre-application) stage to determine whether there is contamination of the site, and whether
remediation works would be needed
Green Infrastructure, Biodiversity and TPOs
• Natural England state that the site triggers the SSSI Impact Risk Zones for residential
development. Natural England should be consulted at the planning application stage
Environmental Health and Pollution
• Noise and vibrations caused by the close proximity of the railway line may have an impact on
the Site and its future occupiers (although there is an existing tree buffer between the site and
railway). Noise mitigation measures should be further considered as part of any future proposals
Mineral and Waste
• HCC Mineral and Waste stated that consideration must be given to the use of material on site
through opportunistic extraction, in order to reduce the need for material to be imported
• A Site Waste Management Plan (SWMP) will be required to support any proposal at the planning
application stage
Other
• The HWE Integrated Care Board is likely to seek a financial contribution towards a new premises
solution for the New Road Practice
H29 – Garages off Grove Crescent
H29 – Garage off Grove Crescent
SHELAA Reference:
CG47
Size: 0.26ha
Proposed use(s):
Residential
Indicative Dwelling
Capacity: 19
Phasing: 0 – 5 years
Greenfield/Brownfield:
Brownfield
Green Belt / Grey Belt:
N/A (Not in Green Belt)
Main Development Requirements:
• Indicative dwelling capacity of 19
Site Constraints and Other Requirements and Considerations:
Access, Highways and Sustainable Transport
• There are two existing vehicular access points from Grove Crescent which should be utilised
Flooding
• The access road at the south of the site ranges from medium to high risk of surface water
flooding. The area at low risk of flooding extends into a flow path which reaches the highway in
Grove Crescent. Any development would need to provide suitable mitigation to address surface
water flood risk on areas of the site
• The council’s Level 2 SFRA (2026) has concluded that almost a quarter of the site at risk of
flooding in the 100 year plus climate change flood event. A Flood Risk Assessment (FRA) must
be submitted at the planning application (and preferably pre -application) stage. Flooding
potential is mainly on the access road, so safe access will need to be demonstrated in the FRA,
without increasing flood risk elsewhere
Mineral and Waste
• HCC Minerals and Waste stated the consideration must be given to the use of material on -site
through opportunistic extraction, in order to reduce the need for material to be imported
• A Site Waste Management Plan (SWMP) will be required to support any proposal at the planning
application stage
Utilities / Infrastructure
• The site is located close to Affinity Water apparatus. Developers will be expected to engage with
Affinity Water as early as is practicable to ensure that these are taken into consideration
H30 – Land at Barton Way
H30 – Land at Barton Way
SHELAA Reference:
CG65
Size: 0.06ha
Proposed use(s):
Residential and
Community Space
Indicative Dwelling
Capacity: 8
Phasing: 0 – 5 years
Greenfield/Brownfield:
Brownfield
Green Belt / Grey Belt:
N/A (Not in Green Belt)
Main Development Requirements:
• Indicative dwelling capacity of 8
• Community space must be provided and maintained on the ground floor (unless robust
evidence demonstrates that there is no current or future forecast demand, including an impact
assessment to show why the site cannot support the social or community use and identify
impacts on users)
Site Constraints and Other Requirements and Considerations:
Access, Highways and Sustainable Transport
• The existing access is via Community Way branched off from Barton Way and this existing
access should be utilised
• A public Right of Way ( PROW) is situated adjacent the northern boundary of the site along
Community Way, which any development must take account of
Historic Environment
• Dickinson Square Conservation Area is located to the south of the site, although this is beyond
development on New Road and is unlikely to be impacted by the development. A Heritage Impact
Assessment/Heritage Statement may be required at the planning (and preferably pre-application)
stage
Social and Community
• Community space must be provided and maintained on the ground floor (unless robust
evidence demonstrates that there is no current or future forecast demand, including an impact
assessment to show why the site cannot support the social or community use and identify
impacts on users)
H31 – Land South of Scots Hill
H31 – Land South of Scots Hill
SHELAA Reference:
NCFS21
Size: 0.87ha
Proposed use(s):
Residential
Indicative Dwelling
Capacity: 30
Phasing:
0 – 5 years
Greenfield/Brownfield:
Greenfield
Green Belt / Grey Belt:
The site was located within the Green Belt. During the Local Plan process the Green Belt boundaries
were altered, and the site was entirely removed from the Green Belt
Main Development Requirements:
• Indicative dwelling capacity of 30
• Play space/ open space would not be required given the proximity to open space and play
space, however, a financial requirement to improve local open space/ play space may be
required
Site Constraints and Other Requirements and Considerations:
Access, Highways and Sustainable Transport
• The site currently does not have vehicular access, although future vehicular access could be
created off Scots Hill / Park Road. The developer is strongly encouraged to engage with HCC
Highways as early in the design process as possible
Flooding
• The majority of the site falls within Groundwater Source Protection Zone (GSPZ) 1 which may
limit the use of SuDS, deep foundations and below ground development. A preliminary risk
assessment is required at the planning application (and preferably pre -application) stage
to determine whether there is contamination, and whether remediation works would be needed
Green Infrastructure, Biodiversity and TPOs
• There are protected trees along the northern and western boundaries of the site, which future
development must take account of. An Arboricultural Impact Assessment would be required at a
planning (and preferably pre-application) stage
• HCC Ecology stated that Preliminary Roost Assessments and Preliminary Ecological Appraisals
may be required prior to determination of a planning application
Minerals and Waste
• HCC Mineral and Waste state that a Site Waste Management Plan (SWMP) will be re