← Open Consultation: all consultations

Three Rivers Plan Explorer

Search the Three Rivers Local Plan. 408 pages in two parts, made findable.

The consultation closes at 11:59pm, Sunday 6 September 2026.

OpenConsult / Buckinghamshire plan / TC5

Policy TC5

Broadband and Electronic Communications

On pages 172 to 175 of the official PDF.

The human version

This policy covers broadband and communications equipment. Masts, antennae, dishes and cabinets must not significantly harm the appearance of buildings or their surroundings, with particular care in conservation areas, and operators should share equipment and use camouflage or miniaturised designs where possible. All new residential, employment and commercial developments must be served by, or capable of being served by, super-fast full-fibre broadband. The connection works should be finished before the development is first occupied.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 172

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

aspect of modern life. TC5 - Broadband and Electronic Communications 1) Proposals for the installation of electronic communications equipment should: a) Have no significant adverse effect on the external appearance of the building on which, or space in which, they are to be located, or the surrounding area. Particular care should be taken in Conservation Areas; b) Fully explore the possibility of sharing facilities, such as masts, cabinet boxes and satellite dishes, and erecting antennae on existing buildings or other structures; c) Fully explore technologies to miniaturise and camouflage any electronic communications apparatus; d) Be appropriately designed, coloured and landscaped to take account of their setting 2) All residential, employment and commercial developments must be served by or be capable of being served by super-fast full-fibre broadband through the integration of appropriate measures such as open access ducting to industry standards. 3) Electronic communications construction and engineering work for new developments should be operational prior to first occupation of the development. Reasoned Justification: 12.52 The National Planning Policy Framework sets out the Governments policy on full fibre broadband connections and electronic communications networks which include next generation mobile technology (such as 5G). It recognises that high quality and reliable communications infrastructure is essential for economic growth and social well-being. 12.53 The council recognises the importance of electronic communications networks and the availability, reliability and speed of broadband provision, so supports the expansion of electronic communications networks and full fibre broadband connections for all new development. 12.54 With regards to electronic communications equipment (including satellite dishes, microwave antennae, radio masts, public call boxes, cabinets and other types of telecommunication equipment) the aim is to ensure that these are kept to a minimum through encouraging the sharing of equipment where this is technically possible. The impact of telecommunications can be minimised through careful design, colouring and landscaping to minimise visual intrusion which can help to protect the character and appearance of an area. When considering applications the council shall have regard to the legal requirements placed upon electronic communications operators to provide an adequate service and any technical and operational obligations that the operator is required to undertake. 12.55 It will be important for all new residential, employment and commercial developments to provide the means to enable connection to be made to fibre optic broadband infrastructure as the main technology for delivering superfast connections. This should be designed and installed as an integral part of development to avoid the visual impact and future disturbance caused by retrofitting. It is recognised that the availability of broadband infrastructure will vary across the district. 12.56 The expectation is that where such infrastructure is not readily available nearby, provision is made for ducting and cabinets to enable easy connection at a later date. In 2021 the Government defined superfast broadband as being at least 30 Mbps download speed, therefo
Infrastructure & utilitiesJobs & economyTransport & travel
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →

Deadline: 11:59pm, Friday 25 September 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.