Site allocation EC11

Northampton, land south of Junction 16 M1

On pages 294 to 298 of the official PDF.

The human version

This site allocation sets aside 50 ha south of Junction 16 of the M1, Northampton, for strategic B8 warehousing and logistics. A masterplan is needed before any application. Proposals must follow minerals extraction and restoration policies, use low-carbon design, offer training, and provide public transport and active travel. Landscape buffers must separate the site from Nether Heyford and Upper Heyford. Applicants must show no adverse effect on the nearby SSSI, and deliver biodiversity net gain. Heritage, noise, lighting, transport, flood risk and crime assessments are required. Two years of overwintering bird surveys must check links to the Upper Nene Valley Gravel Pits Special Protection Area.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 294

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy EC11 – Northampton, land south of Junction 16 M1 Land to the south of Junction 16 is allocated for 50 ha of strategic B8 warehousing and logistics development. A. An integrated, coordinated and comprehensive planning approach will be required for the employment site and a masterplan must be prepared, in consultation with the local planning authority, the local highway authority and other statutory undertakers prior to the submission of a planning application covering the development of the whole site. B. Development proposals must have regard to the phased extraction and restoration of minerals on the site and demonstrate compliance with relevant minerals planning policies. C. Alternative uses which are ancillary to the main use will be supported, provided it can be demonstrated that these uses are required to support the role of the site and its employees. D. Development proposals will be required to: i. Integrate low-carbon and renewable energy principles into the design, materials and construction process in accordance with the sustainable design and construction policies of the plan; ii. Offer good quality training as part of the construction process and recruitment drive; iii. Ensure that transport connectivity and accessibility form a vital part of the development design process, including provision for public transport and active travel; and iv. Include details on the maintenance and management of the natural environment (including parkland, trees, and green infrastructure) to ensure that these features continue to thrive. E. Development must incorporate enhanced landscape buffers and green infrastructure along boundaries with neighbouring settlements, including Nether Heyford and Upper Heyford, to protect village character, maintain clear physical and visual separation, and support biodiversity and the local environment. A detailed strategic landscape assessment will be required to demonstrate how the scheme respects the character of the landscape and the setting of nearby settlements, ensuring a high-quality landscaped setting within and around the proposal's boundary. F. Proposals must demonstrate, through appropriate ecological assessment, that there will be no adverse effects on the integrity of the nearby Site of Special Scientific Interest (SSSI), and must deliver biodiversity net gain and ecological enhancements in line with national and local policy. G. Proposals will be required to be supported by a detailed heritage and environmental impact assessment. This will inform the height, layout, and extent of development, and include appropriate mitigation for any identified impacts. H. Proposals must include noise and lighting impact surveys that also detail appropriate mitigation measures in order to protect the amenity of surrounding villages and the environment. I. Proposals must be supported by a detailed Transport Assessment, including consideration of cumulative impacts on the strategic and local highway network. J. Proposals must provide an appropriate contribution towards off site sustainable transport and highways mitigation measures as set out in the Local Plan’s Strategic Transport Assessment (2026). K. Subject to detailed assessment (including an assessment of contaminated land), development on this site should maximise the use of Sustainable Drainage Systems (SuDS) to reduce the rate of surface water runoff. L. Any proposal for this site should be accompanied by a site-specific Flood Risk Assessment. Any proposal should also take into account the fact that the site is included within the Upper Nene Catchment Local standards for surface water drainage of 1 in 200 year plus an allowance for climate change to protect against pluvial flooding. M. Development proposals must be supported by an assessment of crime prevention and community safety considerations, identifying potential impacts and any measures necessary to address them through the design and layout of the site. N. Prior to submission, two years of overwintering bird surveys shall be undertaken to determine whether the site is used by overwintering Golden Plover / Lapwing and to identify whether it acts as functionally linked land to the Upper Nene Valley Gravel Pits Special Protection Area. If the site is found to be functionally linked land, appropriate mitigation will be required for the loss of habitat. Development proposals should be accompanied by a Construction Environmental Management Plan (CEMP) that includes measures that avoid the displacement of protected birds from construction noise and construction activity including, where appropriate, restrictions on the timing of works and shall incorporate sensitive design measures to avoid the displacement of protected birds from operational activity. WNLP objectives: 14, 15 Figure 41: Development for Northampton, land south of Junction 16 M1 Land east of M1 (extension of Daventry International Rail Freight Terminal (DIRFT) 12.12.14 DIRFT is strategically located central to the “golden logistics triangle” with direct rail access to the West Coast Main Line, one of the UK’s principal freight routes. It is also positioned at the junction of the M1 motorway, the A5 and the A428. 12.12.15 The site has evolved through three phases. DIRFT I included a rail freight terminal at its southern end which served the original development alongside one other unit with a dedicated rail siding. DIRFT II provided rail connections to individual units but did not have a dedicated rail freight terminal. The current phase DIRFT III, is being delivered under a Development Consent Order (DCO), which sets the framework for most of the infrastructure and development. Whilst the majority of DIRFT III complies with the DCO parameters there have been examples where planning permissions have been required for development that have been outside of the DCO. 12.12.16 DIRFT aspires to maintain its position as one of UK’s leading rail served logistics and warehousing operations. The vision is to continue its role as an internationally significant centre for rail connected strategic distribution, exemplary in the field of sustainable logistics, with links to the University of Northampton. 12.12.17 It is important that the strategic B8 warehousing and logistics uses are supported at DIRFT, with ancillary uses which support the role and function of the area and the wellbeing of its employees and visitors. 12.12.18 DIRFT is a major source of investment and employment for West Northamptonshire, supporting the creation of thousands of jobs and strengthening the local economy. This plan proposes the allocation of DIRFT IV to reinforce this role and meet the demand for strategic employment identified in the HENA. By allocating further land adjacent to DIRFT, existing road and rail infrastructure can be utilised, and existing investment capitalised upon. 12.12.19 DIRFT IV will be located to the east of the M1, on a site between the motorway to the west and Yelvertoft to the east. The site will provide approximately 100ha of strategic employment land. It is acknowledged that development to the east of the M1 will need to be carefully considered to ensure its impact is acceptable. The landscape impact both in distant views and more locally in relation to nearby neighbouring settlements, including Crick, Clay Coton, Lilbourne and Yelvertoft, will need to be assessed and the recommendations of the Councils Green Wedge Report (January 2026) addressed through enhanced landscape buffers and green infrastructure to protect village character and amenity, maintain clear separation, and support biodiversity and the local environment. 12.12.20 The height of development will also need to be carefully assessed to ensure it is appropriate for the location and minimises visual impact on surrounding settlements. In addition, highway access must be carefully planned, with all vehicle movements routed through the existing DIRFT site to the west of the M1, avoiding direct access from local road networks.
Jobs & economySite allocationsTransport & travel📍 Crick📍 Daventry📍 DIRFT📍 Nether Heyford📍 Northampton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.