← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / HO7

Policy HO7

Standards for accessibility, space and water efficiency in new homes

On pages 255 to 256 of the official PDF.

The human version

This policy sets standards for new homes. 5% of new homes must meet Building Regulations Part M4(2). Where the Council allocates or nominates occupants, 10% of homes must meet M4(3)(2)(b), and 5% of all new market dwellings must meet M4(3)(2)(a). These are applied across the housing mix, and may be waived where robust evidence shows a site is unsuitable, for example because of flooding or topography. The internal floor area and storage of all new build homes must meet National Space Standards. All new homes must comply with a water efficiency limit of 110 litres per person per day.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 255

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy HO7 – Standards for accessibility, space and water efficiency in new homes A. To meet the needs of residents and to deliver homes which are capable of meeting people’s changing circumstances over their lifetime the following standards will need to be met: i. 5% of new homes must be designed to meet the requirements of Building Regulations Part M4(2) (Accessible and adaptable dwellings) or its successor standard. ii. 10% of homes, where the Council is responsible for allocating or nominating occupants, are to be constructed to Building Regulations Part M4(3) (2) (b) or their successor and 5% of all new market dwellings are to be built to Building Regulations M4(3) (2) (a). iii. The standards set out in A.i. and A.ii. will be implemented proportionately across the housing mix. iv. Where it can be robustly evidenced that site specific factors such as vulnerability to flooding, site topography and other circumstances make a site unsuitable for M4(2) and M4(3) the requirements for part M in A.i. and Aii. will not be applied. B. The internal floor area and storage provision of all new build homes must meet National Space Standards as a minimum. C. All new homes shall include water efficiency measures to comply with a limit of 110 litres per person per day, as set out in Building Regulations Part G2. WNLP objectives: 1, 5, 7, 12 11.12. Self and custom home building 11.12.1. Self and custom build housing is housing built by individuals or groups for their own use, either by building the dwelling on their own or by working with builders. The Government is promoting this type of homebuilding and requires local authority assistance by placing a duty on local authorities to maintain a register of interest through the Self-Build and Custom Housebuilding Act 2015, and subsequently a duty to grant sufficient planning permissions for self-build and custom housebuilding to meet this demand. The Council maintains such a register and further information can be found on its website. 11.12.2. National planning policy also requires the housing needs of those who wish to commission or build their own homes to be reflected in planning policies. In the base year (31 October 2023 to 30 October 2024), 42 applicants were entered on to the register, giving an indication of the level of demand for which the Council needs to ensure provision. Whilst the market has made provision for some self- build and custom build homes, it is important that the supply continues to come forward through various mechanisms and in a variety of locations. Therefore, in order to add to the supply, the Council requires that 5% of plots on development sites of more than 100 dwellings be provided as serviced plots for self-build and custom build dwellings. 11.12.3. Applications for self-build housing will often be for individual plots within or immediately adjoining existing settlements. Proposals for single self-build plots immediately adjoining the confines at Primary Service Villages, Secondary Service Villages and Other Villages will be considered where a local connection can be demonstrated. Self-build can also come forward as part of a larger residential scheme. Applications on multi-lot sites must be accompanied by a design code to clearly set out what form of development is proposed to be pre- approved. This will ensure that development of individual plots within a multi-lot scheme is designed in such a way that they would not stifle development of the neighbouring plot, ensuring that a consistent development is delivered that is well integrated into the surrounding area, but allowing for design variation, creativity, innovation and originality.
Design & placemakingFlooding & waterHomes & housing
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.