← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / N22

Site allocation N22

Northampton, Horizon House, St Peter’s Way

On pages 155 to 158 of the official PDF.

The human version

This site allocation covers Horizon House, St Peter's Way in Northampton. Proposals to bring Horizon House back into office use, including extensions, are supported, with around 25,000 sq. m of commercial floorspace. Offices should be modern and include shared workspaces. Refurbishment must be sensitive to its heritage status as the former Corporation Gas Works offices and to nearby assets, including St Peter's Church, a Grade I listed building. Proposals must minimise inactive frontages, provide accessible greenspace, integrate the River Nene, improve walking, cycling and riverside safety, and contribute to transport mitigation. A flood risk assessment is needed.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 155

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy N22 – Northampton, Horizon House, St Peter’s Way A. Proposals which will bring Horizon House back into effective office use will be supported. Proposals for extending the building, to incorporate additional office spaces will also be supported. Around 25,000 sq. m of commercial floorspace will be supported. B. Any proposed office spaces will need to be designed in a manner that will offer modern units, together with shared workspaces for collaborative work, workshops, community facilities and cultural influences. C. Any refurbishment will need to be undertaken sensitively in light of its status as a heritage asset. Any proposal will need to be of a high quality that preserves and enhances the significance and appreciation of Horizon House, in its historical capacity as the former Corporation Gas Works offices and also its Victorian structure. Its setting and the impact on other heritage assets, including St Peter’s Church (a Grade I listed building), which is located to the north west of the site and on a higher elevation, will also form part of the consideration. The development should take into consideration the re-use/conversion of the locally listed building in the northern part of the site. Development within the immediate vicinity of this asset should be carefully considered in terms of scale and massing. D. Any proposal will need to ensure that inactive frontages are minimised by providing ground floor activities. E. Development proposals will need to provide details of how accessible natural greenspace is to be provided from the site to its surrounding areas, including the River Nene. Any proposal will need to demonstrate how the River Nene can be integrated into the scheme in terms of its use as natural blue infrastructure, whilst enhancing its role and function within the Central Area branch of the river. F. Proposal must secure permeability within the site for walking, cycling and wheeling, and those with mobility concerns particularly to the town centre, public transport hubs and across the river. Any proposals must also improve the safety along the river, providing better access, overlooking and safety measures including lighting and the reduction of foliage. G. Proposals must make an appropriate contribution towards off site sustainable transport and highways mitigation measures as set out in the Local Plan’s Strategic Transport Assessment (2026). H. Opportunities should be sought to improve water flow around the site by reducing surface-water runoff and introducing areas of floodplain to reduce the risk of flooding, absorb water and reduce sediment run-off. I. Subject to detailed assessment (including an assessment of contaminated land), development on this site should maximise the use of Sustainable Urban Drainage Systems (SuDS). J. Proposals should be accompanied by a site-specific Flood Risk Assessment. Any proposal should also take into account the fact that the site is included within the Upper Nene Catchment Local standards for surface water drainage of 1 in 200 year plus an allowance for climate change to protect against pluvial flooding. K. Any proposal should include the safeguarding of suitable access for the maintenance of foul drainage infrastructure. L. A minimum of 8m wide access is required at all times to ensure that repair and maintenance of flood defences can be carried out. WNLP Objectives: 1, 7, 10, 11, 14, 15 Figure 18: Development principles for Horizon House, St Peter’s Way (N3vi) Northampton, South of Junction 15, M1 5.9.100. Land to the south of junction 15 of the M1 provides an opportunity to provide a facility in close proximity to the motorway and adjacent to the rail freight terminal which is currently being constructed. 5.9.101. Its location south of Collingtree and Grange Park, and within 5 – 10 minutes journey time of Northampton town centre, mean that the site is accessible to labour supply within a short distance of the site. To the south is the village of Roade, which has connections to the A5 and Milton Keynes. In addition, connection to a strategic railfreight interchange will allow the industry to perform and progress in a sustainable manner. 5.9.102. To the north of the site, on the other side of Junction 15, there are other uses including commercial, hotel and leisure. To the south of the allocation the Historic Park and Garden of Courteenhall provides an attractive backdrop to the site. Proposals will need to respond to this designated heritage asset with both a strategic landscape assessment of the whole site and a detailed heritage impact assessment required prior to the design of the scheme in order to inform the height of any proposed buildings, layout and extent of the development. 5.9.103. Proposals will also need to demonstrate that they are following a design-led approach, that sees the delivery of contextually appropriate high-quality buildings situated within an attractive landscape setting. Applicants should demonstrate measures that will enhance the development's sustainability and address the environmental issues as set out in Chapter 4 of this plan. In addition, proposals should seek to maximise opportunities for sustainable travel, including the provision of safe and convenient active travel connections to Northampton and integration with existing and proposed walking and cycling networks where feasible and deliverable. 5.9.104. Due to its location an assessment will be required to identify if the site is functionally linked land to the Upper Nene Valley Gravel Pits SPA.
Flooding & waterSite allocationsTransport & travel📍 Collingtree📍 Grange Park📍 Northampton📍 Roade
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.