Policy N5

Northampton, University of Northampton Waterside Campus

On pages 103 to 105 of the official PDF.

The human version

This policy supports the University of Northampton at its Waterside Campus. The site is safeguarded for education and ancillary uses, and development should improve links with the wider Central Area. The Council will continue to support student accommodation and related uses. Proposals should respond to the riverside setting and green and blue infrastructure, and address flood risk, drainage and utility constraints. A site-specific Flood Risk Assessment is needed, meeting the Upper Nene design standard of a 0.5% probability event plus climate change allowance. Access for maintaining foul drainage infrastructure must be safeguarded.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 103

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy N5 – Northampton, University of Northampton Waterside Campus A. The role and contribution of the University of Northampton will be supported through the safeguarding of the site for education and ancillary uses which are required to serve the role and function of the University. Future development proposals should seek to enhance links between existing University facilities and the wider Northampton Central Area infrastructure, supporting the University’s integration within the town, including through improved connectivity, and in accordance with the other relevant requirements of this Plan. B. The Council will continue to support student accommodation and other relevant uses to meet the needs of existing and future students, staff, visitors and investors. C. Development proposals should respond positively to the site's riverside setting and green and blue infrastructure network and demonstrate that flood risk, drainage and utility infrastructure constraints have been appropriately addressed in accordance with relevant Development Plan policies. D. Proposals for this site should be accompanied by a site-specific Flood Risk Assessment meeting the design standard for the Upper Nene catchment through Northampton of a 0.5% probability (1 in 200 chance of occurring in any given year) event plus an allowance for climate change to protect against fluvial flooding. Surface water attenuation should be provided up to this standard. Any proposal should include the safeguarding of suitable access for the maintenance of foul drainage infrastructure. WNLP Objectives: 6, 7, 10, 11, 12, 14, 15 5.5. Provision for homes 5.5.1. A proportion of Northampton’s new housing in the plan period will be met by planning permissions and allocations in existing adopted plans (the WNJCS and the Northampton Part 2 plan). These include the allocations for the Sustainable Urban Extensions. 5.5.2. A number of those allocated sites do not yet have the benefit of planning permission. Because of their limited scale, it is not the intention to re-allocate any of the sites with a capacity of less than 50 units in this Plan, therefore, any of those sites that have not come forward after this Plan is adopted would be judged against the relevant policies in this Plan. Sites of more than 50 units are re- allocated in this Plan to provide certainty. 5.5.3. The spatial strategy prioritises regeneration and the use of brownfield sites within Northampton’s Central Area. Local evidence, including the Central Area assessment, identifies more capacity for residential developments within the Central Area. Policy N3 addresses such regeneration needs by allocating regeneration sites. 5.5.4. There are three allocations for Sustainable Urban Extensions in the WNJCS which do not yet have the benefit of planning permission in whole or in part: • Northampton North, allocated as N3 in the WNJCS, does not yet have planning permission for its northern part. An outline application has the benefit of a resolution to grant permission subject to the completion of a section 106 agreement. The southern part has permission and is under construction. • Northampton West, allocated as N4 in the WNJCS, does not yet have planning permission for its southern part. The northern part has permission and is under construction. • Northampton Upton Lodge, allocated as N9A in the WNJCS, does not yet have planning permission for its eastern part. An outline application has the benefit of a resolution to grant permission subject to the completion of a section 106 agreement. The western part of the allocation (Norwood Farm) has permission and is under construction. 5.5.5. To provide certainty, two of these sites are re-allocated in this plan as follows: • Northampton North - the northern part of Northampton North is re-allocated. It is proposed to extend this to the north and retitle as Land East of the A43. • Northampton West – the remaining part to the south of Roman Road is re- allocated in this Plan. 5.5.6. Northampton Upton Lodge has a resolution to grant, and permission is expected to be issued imminently, it is therefore not necessary to re-allocate this site. 5.5.7. Not all of the housing requirement for the plan period can be met through existing commitments and the regeneration sites. Further opportunities have been identified as follows: • East of Wooldale Road • North of Newport Pagnell Road • Land West of the A43 • Land East of the A43 (extension of Northampton North) • North of Buckton Fields • South of Grange Park • Land off Harlestone Road These are set out in policy N6.
Flooding & waterInfrastructure & utilitiesSite allocations📍 Buckton Fields📍 Grange Park📍 Northampton📍 Upton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.