This policy allocates sites in Northampton for employment use, which must accord with the Development Plan. A table lists the sites with area in hectares and indicative jobs. Sixfields East is 10.18 hectares with 871 jobs. Crow Lane is 2.92 hectares with 94 jobs. Martin's Yard is 1.4 hectares with 194 jobs. Land at Waterside Way is 0.98 hectares with 445 jobs. South of Junction 15, M1 is listed at 68 hectares under policy N23. The supporting text covers strategic distribution, including Northampton Gateway.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy N7 – Northampton, land allocated for employment
The following sites, as identified on the Policies Map, are allocated for employment use and
must accord with the Development Plan.
Reference Address Area (ha) No. of jobs
(indicative)
Relevant policy
(non-
exhaustive)
N7 (i) Sixfields East (NLPP2) 10.18 871
N7 (ii) Crow Lane (NLPP2) 2.92 94
N7 (iii) Martin’s Yard (NLPP2) 1.4 194
N7 (iv) Land at Waterside Way
(NLPP2)
0.98 445
N7 (v)
South of Junction 15,
M1
68 N23
WNLP Objectives: 7, 10, 14, 15
5.7. Strategic distribution
5.7.1. The Economic Growth chapter of this Plan identifies continuing demand for
strategic logistics space. Some of that need will be met by existing provision
including the Logistics Park at Junction 15 of the M1 which is currently under
construction, further growth at DIRFT and through the proposed allocation to the
south of Junction 16, M1.
5.7.2. The SEGRO Logistics Park Northampton Gateway (NG) facility is a large-scale
logistics park located adjacent to J15 of the M1 with a Strategic Rail Freight
Interchange (SRFI) that has been designated as a Nationally Significant
Infrastructure Project (NSIP) and has a Development Consent Order (DCO)
permitting development of up to 464,515 sq. m (5 million sq. ft) of distribution
buildings. It consists of a 182 ha (450 acre) state-of-the-art multi-modal logistics
development, which will accommodate around five million square feet of modern
sustainable warehouse space and logistics facilities. It is anticipated that most
schemes coming forward at the Segro Logistics Park will be in accordance with the
DCO and will not, therefore, require planning permission.
5.7.3. The project aims to create in excess of 7,450 jobs and includes:
• A 14 ha (35 acres) Strategic Rail Freight Interchange
• An intermodal freight terminal capable of handling trains up to 775m in
length
• Up to 5 million sq. ft of distribution buildings
• New road infrastructure and improvements on the A508, A45 and M1 J15
• A508 Bypass of Roade village (now complete)
• Numerous junction improvements on the surrounding road network
• Extensive landscaping, including new footways and cycleways
• Planting of 60,000 trees and 30,000 shrubs
• Over 32 ha (80 acres) of parkland and amenity grassland
5.7.4. Any planning applications submitted at the Northampton Gateway development will
be considered in the context of policy EC14 in the Economic Growth Chapter,
together with any other relevant policies.
5.7.5. As noted in the Economic Growth Chapter, existing provision will not meet all of the
demand in the plan period and therefore there is a need to provide more land for
strategic logistics.
5.7.6. This includes further provision proposed on a site south of junction 16, in close
proximity to Northampton. This is dealt with in the Economic Growth chapter.
5.8. Burial space and related provision
5.8.1. Northampton’s continued growth means that demand for burial space and
cremations will also increase over the plan period, highlighting the need to plan for
future requirements. Evidence shows that there are changing representations of
faith communities in Northampton and this will need to be reflected in the future
provision of burial space.
5.8.2. Northampton accommodates mainly large burial sites which are owned and
managed by the Council, including Towcester Road cemetery and Kingsthorpe
Cemetery, and a private crematorium. In addition, several churches also provide
some burial/ interment capacity, but space is very limited and insufficient to
cater for need. This Plan therefore aims to ensure that sufficient land is
allocated and safeguarded to meet the identified requirements for burial space.
A study commissioned by the Council concluded that, by 2029, there will be a
deficit of burial space capacity of 4,011 plots. One of the sites identified in the
study is under construction (Dallington).
5.8.3. The Council has duties both as the ‘responsible authority’ for the
Northamptonshire Coroner Area and as a ‘category 1’ responder for civil
contingencies to make provision for properly storing bodies of the deceased and
enabling postmortems to take place. The current arrangements for this are
fragile and increasingly expensive. The Council is therefore proposing to
construct a new public mortuary on land at Riverside, to the south of
Northampton.