The human version (we wrote this, not the council)
This site allocation safeguards 6.8 hectares of employment land at Holly Lane, Atherstone (E1). Aldi currently has an interest in the land. If Aldi no longer needs it, the site stays safeguarded as a long term employment site for smaller scale mixed E(g)(ii) and B2 uses. Access would be from Holly Lane and/or Abeles Way. Area A is the developable area and Area B is a semi natural buffer along Innage Brook. A Level 3 Flood Risk Assessment must show how much land lies outside flood zones 2 and 3 plus climate change freeboard.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
E1 Land at Holly Lane, Atherstone
6.8 hectares of employment land at Holly Lane will be safeguarded. In the event that the allocation
becomes surplus to the requirements of Aldi, who currently have an interest in it, the site will
continue to be safeguarded as a long term employment site for smaller scale, mixed E(g)(ii) and B2
uses appropriate to the location reflecting the proximity with existing residential development to the
north and accessed off Holly Lane and/or Abeles Way.
The site is shown on the Policies Map indicating Areas A and B. Area A is the developable area
and area B will be a semi natural buffer along Innage Brook. A Level 3 Flood Risk Assessment must
be undertaken to demonstrate the extent of land available for development outside of flood zones
2 and 3 plus climate change freeboard, on the basis of (high resolution) detailed modelling. The
extents of Area A and Area B will be defined as indicative and based upon the EA Flood Zones until
such modelling outputs become available.