← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / H28

Site allocation H28

Atherstone Football Ground

On page 106 of the official PDF.

The human version

This site allocation covers Atherstone Football Ground (H28). It will deliver at least 46 dwellings and needs the football ground to move. The preferred new location is east of Sheepy Road, north of Atherstone, with access from Sheepy Road or Royal Meadow Drive. Extra enabling housing may be allowed if site conditions permit. The site needs a detailed Flood Risk Assessment to show how much land outside the Flood Zone 3 climate change extent can be built on. Until new modelling is available, the developable area will be based on the EA Flood Zones. Ground levels may be adjusted for safe access if third party flood risk does not rise.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 106

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

H28 Atherstone Football Ground Site H28 will deliver at least 46 dwellings and require the re-location of the football ground. Relocation To facilitate the redevelopment of the site the football ground will need to be re-located to a new location. The preferred location, which will keep the ground close to the Main Town of Atherstone, is to the east of Sheepy Road, north of Atherstone. Options for access could be from Sheepy Road or from Royal Meadow Drive, Atherstone. Additional enabling residential development may be permitted if site conditions allow. Flooding The site will require a detailed site-specific Flood Risk Assessment to prove, with higher accuracy, the extents available for safe development outside of the Flood Zone 3 climate change extent defined by new (high resolution) detailed modelling. The extent of the developable area will be defined and based upon the EA Flood Zones until such modelling outputs become available. It may be possible to redistribute ground levels within the site to ensure safe access and egress to all parts of the site, however this will need to be explored in greater detail as part of a FRA to ensure it does not increase the risk of flooding to third parties. Employment Land 14.24 Land north-west of Atherstone off Holly Lane/Rowland Way (6.8 hectares) will be brought forward as a long-term employment site subject to the single user restrictions. The landowner, Aldi, now wishes to retain this land for their expansion plans. Therefore, although available, it is for a specific end user of Aldi themselves. 14.25 The site lies partially within flood zones 2 and 3 to the eastern end of the site. A Level 2 Strategic Flood Risk assessment will therefore be necessary to assess the implications. However, this area can be targeted for uses that will not affect flood storage capacity, such as parking, landscaping and natural open space to reduce impact on flooding and surface water drainage and maintain the capacity of the site. In addition, major employment development within the Atherstone and Mancetter areas, generating traffic onto the A5, will need to address the requirements of Policy LP26a, for contributions towards highway improvements along the A5.
Flooding & waterJobs & economySite allocations📍 Atherstone📍 Mancetter
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.