This site allocation covers 1.4 hectares of allotments next to Memorial Park, Coleshill (H3). It is allocated for at least 30 dwellings. Replacement allotments are required, and policy C1 allocates about 2.5 hectares off Maxstoke Lane, south of the cemetery, for cemetery and allotment use. The text notes that Coleshill Town Council identified a need for a cemetery extension. It also covers the Coleshill Manor employment site, where a 1991 permission for up to 10,033 sq.m of offices has been affected by HS2. The council does not encourage logistics or major employment uses there.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
H3 Allotments adjacent to Memorial Park, Coleshill
1.4 hectares of land, currently used as allotments, adjacent to the Memorial Park, Coleshill is
allocated for residential development for at least 30 dwellings. Replacement allotments will be
required. Land has been allocated, Policy C1, to the east of Coleshill to allow for this provision.
Community Facilities
14.32 Coleshill Town Council identified, as part of work on the Infrastructure Delivery Plan a need
for a cemetery extension. They have also expressed this need within their Neighbourhood
Plan. The most optimum site for such a use is directly adjacent to the existing cemetery.
C1 Land off Maxstoke Lane, south of St Peter and St Paul’s Cemetery
Approximately 2.5 hectares of land north of Maxstoke Lane, south of St Peter and St Paul’s
Cemetery Coleshill will be allocated for cemetery and allotment use for the Parish and Coleshill
Community.
Employment
14.32a Planning permission was granted in 1991 (Reference: OAP/1991/0130) for the conversion
of, and new office accommodation at the former Coleshill Hospital, now known as Coleshill
Manor. This was on 16.3 hectares (gross) of land within the Green Belt. The permission
allowed for the construction of up to 10,033 sq.m. (107,994 sq.ft) of offices in a parkland
setting. The indicative masterplan from a later 1999 planning permission showed 7
buildings in addition to the conversion of the manor house, which had previously been used
as the hospital.
14.32b Some parts of the original permission have been implemented; therefore, extant planning
permission remains for the site. However, since 2010 the site has been under threat by the
construction of the Birmingham section of HS2 as part of the Delta Junction.
14.32c The NWLP 2021 recognised this issue and indicated that the Borough Council would
consider favourably applications for replacement buildings if they were to be demolished
due to HS2. This occurred in early 2025, when a relatively new office block was demolished
to make way for HS2. In addition, some of the other proposed office blocks shown on the
indicative masterplan for the site will also be impacted by the route of HS2. It is considered
important for the Borough Council to signal that although HS2 has carved through part of
the site, alternative solutions for the site should be explored.
14.32d The current consent is for delivery of offices in a parkland setting. The site is located in the
Green Belt and within a sensitive gap between Coleshill and Castle Bromwich/Solihull. As
such, the policy does not encourage logistics, warehousing or major employment uses on
the site as this would adversely affect and impact upon this sensitive location. The policy
recognises that any development of the site should reflect the parkland setting. Therefore
offices, hospitality or, research and development uses that complement a ‘campus’ style
setting would be appropriate. A proposal should have a minimal impact on the area.
14.32e Please refer to Appendix Q.