What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy SMBC/HO2: Broad Locations
1 The areas identified on the Policies Map as a Broad Location for Development are
expected to contribute towards meeting the Borough's development needs during the
plan period.
2 Development proposals within the broad location will be supported in principle where
they:
A A re consistent with the spatial strategy of the Plan;
B D emonstrate a comprehensive and coordinated approach to development;
C P rovide or contribute towards necessary infrastructure; and
D Avoid, mitigate or compensate for adverse environmental impacts.
3 The broad locations do not constitute site allocations, and the precise scale, form and
disposition of development will be determined through either (i) subsequent planning
applications having regard to all NDMPs and relevant development plan policies or (b)
through further work in accordance with part 4 of this policy.
4 The future amendment of Green Belt boundaries in these location s will be confirmed
through one of the following 3 mechanisms:
A The next review/update of the Councils local plan;
B A new or an update to the respective Neighbourhood Plan; or
C A new Supplementary Plan brought forward under the new planning system.
101. It is recognised that delivery of this policy will be through a mix of (a) reacting to planning
applications and (b) being more proactive with bringing forward a plan of a type included in
part 4 of the above policy. This is partly a reflection of the likelihood for planning applications
to be submitted in for developments that may be consistent with NDMPs S5 (1 )(h) and GB7
(1)(h).
102. The Council’s preference is for joint working with promotors, developers and other
stakeholders (including parish councils and neighbourhood forum (s) to achieve a
comprehensive development that addresses infrastructure needs in a coordinated manner.
103. The adoption of this plan does not automatically remove Green Belt status from land within
the broad locations included in the plan 19 . As noted in the above policy, amendments to the
boundaries of the Green Belt will only occur through a further local plan, a Neighbourhood
plan or a Supplementary Plan.
Housing Requirement
Local Housing Need (LHN)
104. Paragraph 62 of the NPPF sets out that to determine the minimum number of homes needed,
strategic policies of the plan should be informed by a Local Housing Need assessment ,
conducted using the standard method in the national Planning Practice Guidance. The
standard method uses a formula that incorporates a baseline of local housing stock which is
then adjusted upwards to reflect local affordability pressures to identify the minimum number
of homes expected to be planned for.
19 The only exceptions to that are where the broad location areas overlap with: specific sites that are proposed
for allocation; specific sites that already have planning consent; or where land is situated within the existing
built form of Tidbury Green due to the village being inset from the Green Belt.
105. The table below sets out the key data inputs used and the resultant calculation of the LHN for
the plan period.
Data Description Value
Total dwelling stock (no. of existing dwellings) 96,333
0.8% annual increase in housing stock 771
Current median house price20 £330,000
Current median workplace earnings21 £42,587
Average affordability ratio (2022-26)22 8.54
Percentage increase23 67.2%
LHN (dwellings per annum) 1,289
Number of years in the plan period (2026-2043) 17
Total LHN for plan period 21,913
106. In the 2020 plan the local housing requirement was established at 816 dwellings per annum
(dpa). The new standard methodology for calculating Local Housing Need was subsequently
introduced in December 2024 and had a significant impact on the level of housing required
across the Borough. Under the new standard method the LHN for the Borough has now
increased to 1,289 dpa. This represents an increase of 473 dpa or 58%. Over the course of the
plan period (17 years) this would increase the number of dwellings to be accommodated by
around 8,000 dwellings.
Housing Completions 2015-25
107. It is useful to provide context to the LHN by drawing a comparison to completions that have
taken place in the Borough over the last ten years24 . Although annual numbers have fluctuated
between 287 and 828 dwellings per annum, the ten-year average has been 647 dpa. From this
it c an be s ee n t ha t t he L HN f or t he Borough is double the number of completions that has
taken place in recent years.
Stepped Trajectory
108. In the Housing Supply and Delivery chapter of the PPG, it states25 that:
20 ONS as published March 2026
21 ONS as published March 2026
22 The affordability ratios for 2022 (9.15), 2023 (7.74), 2024 (9.44), 2025 (8.62) and 2026 (7.75).
23 Using the standard method as follows: ((8.54-5) / 5) x 0.95
24 This covers the period the Housing Delivery Test results have covered.
25 Paragraph 012 (Reference ID: 68-021-20190722)
"A stepped housing requirement may be appropriate where there is to be a significant
change in the level of housing requirement between emerging and previous policies
and/or where strategic sites will have a phased delivery or are likely to be delivered later
in the plan period. "
109. It goes on to say that strategic policy makers must identify the stepped requirement in strategic
housing policy, support it with evidence, and must not unnecessarily delay meeting
development needs.
110. The housing requirement in this plan is significantly higher than (a) was to have been included
in the 2020 plan, and (b) previous delivery. Furthermore, a significant proportion of the land
supply is expected to come forward on strategic sites and/or from broad locations, the majority
of which are situated within the Green Belt. In these circumstances it is considered a stepped
trajectory is justified as indicated in Policy SMBC/HO1. This will be provided over three time
periods. This reflects the small number of completions expected in the two-year period before
the plan is adopted. The second period then seeks to provide 75% of LHN over the first five-
year period post adoption of the plan. The shortfall would then be made up over the remaining
10 years of the plan.
Housing Supply.
111. The table below sets out the land supply 2026-43 (as of 31st March 2026).
Source Capacity
1 – Site with planning permission (started) 493
2 – Sites with planning permission (not started) 2,249
3 – Sites identified in land availability assessments 665
4 – Sites identified in the brownfield land register 21
5 – Town centre sites 2,169
6 – SLP 2013 allocations without planning permission 65
7 – Less a 10% discount to rows 2, 3, 4, 5 & 6 -517
8 – Broad locations (inc. development around railway stations 8,219
9 – UK Central Hub Area (to 2043) 1,600
10 – Short-term Grey Belt windfalls 1,000
11 – Other windfall supply (2028-43) 2,250
12 – Allocated Sites 4,877
Total Capacity 23,091
112. Commentary on these land supply components is as follows.
Row 1: Site with planning permission (started)
113. This includes all planning permissions where development has commenced on site, but the
development has not been completed. This excludes dwellings on sites under construction
which were completed before 1 st April 2026, but will include the dwellings on such sites that
have been/will be completed after this date.
Row 2: Sites with planning permission (not started)
114. This relates to planning permissions (including outline, full and/or reserved matters approvals)
where permission has been granted, but the development has not commenced on site.
115. Following the work undertaken on the 2020 plan, which included allocating sites in the Green
Belt, a number of planning applications for these developments have now been submitted,
and some have now got planning permission. These are included in this part of the land supply.
Row 3: Sites identified in land availability assessments
116. This includes sites identified in land availability assessments that are expected to come
forward in the plan period. These are on sites that are not dependent on a change in planning
policy (e.g. to take a site out of the Green Belt).
Row 4: Sites identified in the brownfield land register (BLR)
117. Where not included in other parts of the land supply, this component includes the remaining
sites identified in the BLR.
Row 5: Town centre sites
118. This component includes developments expected to come forward in Solihull and Chelmsley
Wood town centres as follows:
• Chelmsley Wood – 100
• Solihull – 2,06926
119. A major development at Mell Square (which is to be known as Holbeche Place), which includes
provision for up to 1,600 residential units27, was granted planning permission on 1st April 2026.
The contribution to land supply from this development is therefore not yet included in row 2 of
the above table (planning permissions (not started)) but has been included in this component.
120. Other potential developments in the town centre that were envisaged by the Solihull Town
Centre Masterplan (2020) includes 469 dwellings in the Heart of Solihull quarter (Eastgate).
121. Following masterplanning work at Chelmsley Wood town centre , the centre is considered
capable of accommodation c100 dwellings.
26 Comprised of 1,600 units at Mell Square and 469 at Eastgate.
27 Of these 1,600 units, 574 have now got detailed consent, either because they were approved in full as part of
the hybrid application, or they have subsequently been granted reserved matters approval.
Row 6: SLP 2013 allocations without planning permission
122. The only remaining site to come forward from this plan is that relating to development at
Riddings Hill in Balsall Common (now referenced as site allocations BC7 in the Balsall
Common chapter).
Row 7: Less a 10% discount to rows 2, 3, 4, 5 & 6
123. To reflect potential non-implementation a 10% discount has been applied to these sources of
land supply.
Row 8: Broad locations (inc. development around railway stations)
124. The 2026 NPPF promotes development around well-connected railway stations through Policy
S5 (1)(h) and policy GB7 (1)(h). These policies specifically indicate development proposals
(within reasonable walking distances) can be considered as not inappropriate development in
the Green Belt. Effectively this would create another form of windfall supply that could be
expected to come forward in the plan -period without needing any further policy changes in a
development plan.
125. The 2026 NPPF defines a reasonable walking distance as 800m, and only those parts of a site
that fall within th is distance should be considered as appropriate development under the
relevant NDMPs. However, in the context of the land identified within Solihull, this could (a)
create illogical or arbitrary site boundaries and/or (b) fail to maximise the benefit of locating
development in the vicinity of railway stations, which are likely to be the more sustainable
locations in the Borough.
126. Therefore, an assessment on a station- by-station basis has been undertaken to identify the
likely capacity that could come forward from sites within 1,000m of railway stations and this
has been included in the above table. This exercise has considered the potential capacity
around relevant stations by excluding (a) land that is already built up and (b) other land that is
unlikely to be suitable for development as it would be contrary to a NDMP (such as parks,
ancient woodland or flood zones).
127. This approach, which is based on the new national policy position will help deliver a n
enhanced supply that can be provided in a more comprehensive manner. The Council will
work with landowners, site promotors and local communities (including the relevant Parish
Council and/or Neighbourhood Forum) to help steer deliver y of development in these broad
locations. This could be pursued through bringing forward supplementary plans (in
accordance with NDMP PM4 and/or neighbourhood plans (in accordance with NDMP PM5
which will identify detailed sites and strategic infrastructure. This approach will also help make
provision for treatment of development in a comprehensive manner.
128. Whilst development of land within 800m walking distance of a railway station may be
considered as appropriate development, development of land between 800m and 1,000m (or
even beyond) would need to be based on very special circumstances, having regard to relevant
site circumstances, infrastructure delivery and the context of this plan (and its spatial
strategy). As such, sites that fall within the 800m - 1,000m buffer zone are unlikely to be
isolated sites but instead more comprehensive sites that maintain connections and
accessibility to land within the 800m buffer area.
129. Other broad locations are as set out in the settlement chapters.
130. Summary table of broad locations to which Policy SMBC/HO2 applies is as follows:
Broad Location Capacity
BC9 – Land at Phase 3 of the Balsall Common Relief Road 1,100
BC10 - Berkswell 1,350
BC11 - Tile Hill 1,190
BL4 - Shirley, Whitlocks End, Wythall and Earlswood Stations 1,577
HA3 - Hampton in Arden 1,350
KN3 - Dorridge 814
NS2 - Marston Green 36
SO3 - Widney Manor 802
Total 8,219
Row 9: UK Central Hub Area (to 2043)
131. Development at Arden Cross and around the HS2 Interchange is expected to take place over
an extended period, which is partly in response to the timings for the return of the non -
operational elements of the HS2 land to landowners. The 2021 masterplan for the site
indicated the creation of a new residential community delivering up to 3,000 new homes
incorporating a mix of tenure, type and density.
132. Whilst the delivery of homes at Arden Cross is not dependent on the delivery of HS2 (which
has recently undergone a ‘reset’ and programme review) the revised programme for HS2 is
likely to have implications on the timescales for land becoming available for development at
Arden Cross, albeit the first land returns are expected by 2030. Therefore , at this stage it is
considered prudent to continue to acknowledge that the residential component of the
development will not be completed within the plan period, and for land supply purposes a total
of 1,600 is considered a reasonable expectation within the plan period, and this would be in
the later years.
133. As noted elsewhere in this plan, development at the NEC is expected to shift the focus from
residential development to employment and leisure uses in the more underutilised northern
car parks. Whilst later phases of a refreshed masterplan may make provision for some
residential development, this is likely to be in the long-term and probably beyond this plan
period. Therefore, this component of the land supply does not include any residential capacity
at the NEC.
Windfall Developments
134. Given the changes to the NPPF in 2024 which introduced the concept of Grey Belt , it is
considered appropriate to look at the windfall supply in two parts:
• Row 10: A short-term contribution to windfall supply from Grey Belt developments, and
• Row 11: A supply throughout the plan period from typical/traditional windfall
developments.
Row 10: Grey Belt Windfalls
135. This will effectively be a short-term interim windfall supply likely to come forward in the period
until the plan is adopted.
136. The 2024 NPPF introduced the concept of Grey Belt and under paragraph 155 some
developments under this paragraph should not be regarded as inappropriate development in
the Green Belt (if there evidenced unmet need for a development) . This prompted a number
of planning applications to be submitted, and more may follow. One of the conditions to be
met is that there must be a demonstrable unmet need for the development, and this can be
established through the lack of a 5-year land supply or where the Housing Delivery Test falls
below 75%. These tests are likely to be met until (at least) when this plan is adopted around
the end of 2027/beginning of 2028.
137. The practical consequence of this is that there will be a land supply from this source for around
two years. Indeed, there is evidence (through planning applications being granted either by
the Council or via the appeal route 28) that this source is already yielding a land supply. At the
time this plan was published, around 20 planning applications for major residential
development were awaiting determination29. In total, these applications contained proposals
for over 4,000 dwellings. These applications are likely to be determined before the plan is
adopted and, for those that are approved, will contribute to the land supply for the plan period.
This land supply would not otherwise be captured . Using a cautious approach, it has been
assumed 1,000 dwellings may reasonably be expected to come forward as part of the land
supply under this category, thus they have been included in the above table. This will be a ‘one
off’ contribution to the land supply, rather than an annual rate over the plan period
138. Where such sites also sit within reasonable distance of a railway station care has been taken
to avoid double counting within the respective supply components , as such sites would be
included in the railway stations windfall.
Row 11: Other windfall supply
139. Other windfall housing sites are sites that will become available for residential development
during the Plan period that cannot be identified now, even as either broad locations or types
of development as described above. Typically, these will be smaller sites than the other
windfalls noted above and are likely to come forward on an annual basis.
140. There is compelling evidence that such windfall sites consistently become available in
Solihull. The windfall assumption in the adopted Solihull Local Plan was 150 dpa. The average
windfall supply since 1992 increased up to 231 dpa (measured over a 10 -year period) . The
2020 plan included a windfall rate of 200 dpa which the Inspectors did not indicate would need
to be amended.
28 For example, Land at Rumbush Lane, Tidbury Green and Land at Gentleshaw Lane, Solihull have been
approved on the basis of Grey Belt policy, whilst land at Stratford Road in Hockley Heath has been approved on
appeal.
29 This relates to Green Belt sites but not including those that were included as allocations in the 2020 plan.
141. However, given the additional windfall categories noted above, it has been considered prudent
to reduce this ‘other windfall’ from 200 dpa to 150 dpa.
142. To prevent double counting with existing permissions, the windfall completions are counted
from the third year of supply, therefore from 2028 onwards. This will result in this category of
windfall development yielding supply over a 15-year period30 at 150 dpa, i.e. 2,250 dwellings in
the plan period.
Row 12: Allocated Sites
143. This relates to allocations proposed in this plan and includes those carried forward from the
2020 plan that (a) remain as appropriate allocations and (b) have not already received the
benefit of a planning permission (as at 31st March 2026).
144. Summary table of residential allocations31.
Site Capacity
BC1 – Barratt’s Farm, Balsall Common* 1,160
BC3 – Windmill Lane/Kenilworth Road, Balsall Common 132
BC5 – Trevallion Stud, Balsall Common 310
BC6 – Lavender Hall Farm, Balsall Common 92
BL1- West of Dickens Heath* 536
BL2 – South of Dog Kennel Lane (west), Blythe* 700
BL3 – Whitlock’s End Farm, Blythe 450
HA1 – Meriden Road, Hampton in Arden 100
HH1 – School Road, Hockley Heath* 100
KN1(A&B) – Hampton Road, Knowle 193
KN2 – South of Knowle* 225
ME1 – West of Meriden 10
SO1 – East of Solihull* 770
SO2 – Moat Lane Depot, Solihull 99
Total 4,877
30 2028 to 2043.
31 This table includes allocations which have not received planning permission by 31st March 2026. A number
of sites noted here have since received the benefit of planning permission and these are described in the
settlement chapters.
145. Within the above table, those sites that have either received planning permission or have been
the subject of a resolution to grant planning permission (at least in part) , since 1st April 2026
are marked with an *, when land supply is updated to a base date of 31st March 2027 these will
then be included in Row 2 of the land supply table.
146. To avoid confusion, the site references used in the 2020 plan have been carried forward (rather
than renumbering sites) and so it may appear that the above table is incomplete. For instance,
the entries jump from BC1 to BC3. For completeness th e list below fills the gaps and notes
why they are not now included:
• BC2 – Frog Lane, Balsall Common: site now has planning permission.
• BC4 – Pheasant Oak Farm, Balsall Common: site now has planning permission.
• HA2 – Oak Farm, Catherine-de-Barnes: site now has planning permission.
• NS1 – Kingshurst Village Centre: site now has planning permission and is under
construction (some residential completions have now take place).
Balance of Housing Need to Housing Supply
147. Measured against a need of 21,913 dwellings over the plan period, there is a supply of 23,091
dwellings, a surplus of 1,178 dwellings (or 5.4 % when measured against the need)32.
Affordable Housing Policy