The human version (we wrote this, not the council)
This section describes Hockley Heath, a small village in the far south of the Borough, bisected by the A3400 Stratford Road. The parish has 1,900 people in some 770 households. The village has a small centre and a one-form entry primary school, but no doctors surgery. Growth is limited to small, proportionate extensions so the school is not overwhelmed. The Green Belt boundary will change, using the Stratford-upon-Avon Canal as the new southern edge. Needs include better school parking on School Road. Recent decisions include up to 99 dwellings south of School Road, up to 9 next to 84 School Road, and up to 80 west of Stratford Road.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Hockley Heath
The Settlement Now
612. Hockley Heath village is a largely inter and post-war small settlement formed by ribbon
development. It is bisected by the A3400 Stratford Road, which is a key connection to Junction
4 of the M42 to the north and Stratford-upon-Avon to the South.
613. Located within Hockley Heath Parish, near the boundary with Stratford and Warwick Districts,
this semi-rural settlement lies to the far south of the Borough. The population of the parish is
1,900 in some 770 households with the majority of residents in the parish residing within the
village of Hockley Heath.
614. The settlement is characterised by low-density residential areas, many dwellings of detached
or semi-detached form. The settlement has a small village centre, which provides a range of
shops and restaurants. However, it lacks some services such as a doctors surgery.
615. The village of Hockley Heath is inset in the Green Belt, which separates it from neighbouring
Knowle, Dorridge and Bentley Heath and gives it a sense of remoteness. The Green Belt is also
valuable in the settlement’s overall environmental quality and contributes to its semi -rural
setting. Hockley Heath Recreation Ground provides valuable green space for residents to use
within the village. The settlement also benefits from significant blue infrastructure in the form
of the Stratford-Upon-Avon Canal, which provides a linear heritage asset with a village wharf.
616. The area has a high-quality residential environment and a good, popular school (Tudor Grange
Primary Academy - Hockley Heath). This one -form entry primary school can accommodate
some 210 pupils plus early years. However, secondary education needs are met outside of the
Parish.
617. Hockley Heath has bus services running through the village connecting Solihull and Stratford
and a more frequent service linking to Dorridge/Solihull and Cheswick Green/Shirley. Rail
access is available at Dorridge railway station, connecting the settlement to Birmingham and
London.
The Settlement in the Future
618. The A3400 will continue to provide an important part of the highway network, enabling vehicles
to travel from Stratford -upon-Avon, and to travel to the north, connecting Hockley Heath to
Blythe Valley Park and the M42.
619. Due to the proximity to the Borough boundary, future expansion of the settlement within
Solihull Borough is limited and largely restricted to the north and west of the village.
620. Whilst being classified in the settlement hierarchy as a larger village, given the more limited
ranges of services and the less accessible nature of the settlement, it is considered that
development options are restricted to what would be limited and proportionate extensions to
the settlement. A key aspect to this is to ensure that the existing infrastructure supporting the
village, especially the school, is not overwhelmed from additional demands that may occur
from larger expansions.
What is Required for the Settlement in the Future?
621. Hockley Heath will require protection from excessive development that may impact upon the
character and attractiveness of the village, and the services it provides. Where development
is provided, the following issues will need to be addressed:
622. School Parking – Congestion around
school pick up and drop off times
currently occurs in School Road.
Development on land south of School
Road will provide an opportunity to
deliver access/parking improvements
and routes for pedestrians that takes
this into account.
623. Community Infrastructure Levy –
Presently, the parish council will
directly receive 15% of the levy
collected in the area. This will
increase to 25% once any
Neighbourhood Plan is adopted. This
will provide a significant source of
funding that can be used to take
forward appropriate projects that the
community have identified as
priorities. This can include simple ,
relatively low-cost actions (e.g.
further traffic regulation orders)
through to more substantial projects.
It will be for the parish council to
decide how this ‘local’ element of the CIL receipts is to be spent and there is potential for
partnership working to maximise the use of monies from this source.
624. Pedestrian and Cycling Connectivity – Enhancements to encourage and promote walking
and cycling in the settlement, particularly towards the local centre, schools and public
transport will be required. Developments will be expected to ensure that walking and cycling
connectivity is provided both within and beyond the site boundary, linking in with the existing
and proposed cycle and walking networks identified in the Council’s Cycling and Walking
Strategy, as well as routes for recreation.
625. Green Space Improvements – In accordance with the NPPF and the ‘golden rules’ ,
opportunities for the provision and improvement of local green space that is accessible and of
high quality will be maximised.
626. Health provision – The Council is working with the BSOL ICB to establish the impact of new
development on local GPs and other services, and how this can be addressed.
627. Other necessary improvements to local infrastructure - Where development generates a
need for new or improved infrastructure, developers will be expected to deliver such
improvements to ensure that growth does not place unacceptable pressure on existing
infrastructure networks and services and contribute s to the creation of sustainable, well -
served communities.
Proposed Approach
628. Hockley Heath is identified for limited and proportionate expansion of the village, with no other
large-scale allocations being considered appropriate. This reflects the semi-rural character of
the village and the need to manage the capacity and viability of local infrastructure.
629. The Green Belt boundary around Hockley Heath will need to be amended to accommodate the
level of growth proposed for the settlement. To provide a logical, strong and defensible new
southern boundary, it is proposed to use the Stratford-upon-Avon Canal. Changes to the Green
Belt boundary north of School Road are also proposed to recognise the existing built-up nature
of this frontage.
630. A mix of market and affordable housing, as well as smaller market homes for young people
wishing to remain in the area, and specialist housing to meet the needs of older people will be
provided in the settlement. This will seek to align the types and sizes of homes to be made
available and the needs of the community. However, there will need to be a careful balance
struck between making the most efficient use of land and respecting the character of the local
area.
631. In addition to the site south of School Road that would then fall within the settlement
boundary, if the Green Belt boundary were amended as described above, a further small site
may then be considered appropriate for development as it would then also be within the
settlement boundary. The site is not being allocated as part of this plan but is being highlighted
as it has been promoted for development by the landowner/developer and if the Green Belt
boundary is changed, it would no longer be subject to Green Belt policy. The principle as to
whether development would be allowed would be established through the planning
application process. The site is as follows
• Land adjacent to 84 School Road
Recent Planning Applications
632. A number of recent planning applications need to be highlighted as they are also relevant to
how the settlement will develop in the future, and they will have implications for determining
what an appropriate amended boundary to the Green Belt ought to be. The proposals include
the following:
Development of up to 99 dwellings on land south of School Road
633. A resolution to grant outline planning permission for up to 99 dwellings , subject to a S106
Agreement, has been made on this Green Belt site previously identified as allocation HH1 in
the draft 2020 Local Plan. It also includes infrastructure and open space.
Development of up to 9 dwellings on land adjacent to 84 School Road
634. Planning permission in principle has been obtained for the provision of up to 9 dwellings on
this site. Whilst technical details consent needs to be submitted and all relevant matters
approved before full planning permission is secured, the permission in principle consent
provides early certainty on the acceptability of development on this site.
Development of up to 80 dwellings on land west of Stratford Road
Outline planning permission for up to 80 dwellings and associated infrastructure was granted
on appeal in July 2026.