The human version (we wrote this, not the council)
This section introduces the Southend Local Plan. Southend is a city by the sea at the mouth of the Thames Estuary, some forty miles east of London. Land is limited and the urban area is densely built. The Plan sets out how the city should grow sustainably to 2045, giving new homes and jobs while protecting parks, heritage and the coast. Once adopted it will replace the Core Strategy (2007), the Development Management Document (DPD 2015), the Southend Central Area Action Plan (SCAAP 2018) and some JAAP 2014 policies. A new South East Essex unitary authority is planned, but this does not affect the legal status of local plans.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
1. Introduction
1.1 Southend is a vibrant city by the sea. It is a major tourist
destination and business centre with a growing population.
It is a city of enterprise, culture and opportunity.
1.2 The city lies at the eastern most extremity of the south Essex
peninsula at the mouth of the Thames Estuary some forty
miles east of London. It stretches along a foreshore of around
seven miles, which provides an east/ west linear layout.
1.3 With limited land resources and one of the most densely
developed urban areas in the country outside London,
harnessing the city’s potential for growth and meeting the
needs of its resident and business community while addressing
the impacts of climate change and technological advances,
and having regard to the natural and historic environment,
is a major challenge and requires careful planning.
1.4 The Local Plan seeks to meet this challenge by planning for
the future sustainable development of the city to 2045, whilst
seeking to provide for new homes and jobs and safeguarding
the city’s valuable parks and green spaces, distinctive heritage
and character, and its sensitive coastal environment.
1.5 It sets out a spatial vision and policies and proposals to address the
needs of the city. This is set out under specific themes as follows:
● A CITY BY THE SEA – setting out objectives, spatial strategy and
principles; managing the impacts of growth and infrastructure and
providing for a new neighbourhood on land north of Southend.
● A CITY THAT IS HEALTHY AND SAFE –
enabling healthy lifestyles and wellbeing;
● A CITY OF OPPORTUNITY – the provision and type
of new homes and securing a thriving economy;
● A CITY TO BE PROUD OF – urban design, character and heritage;
● A CITY THAT IS GREEN AND SUSTAINABLE –
the natural environment, biodiversity and climate change;
● A CITY THAT IS CONNECTED AND SMART –
transport and connectivity;
● THE NEIGHBOURHOODS OF SOUTHEND –
proposals for the neighbourhoods of Southend;
● A CITY THAT DELIVERS – how the Local
Plan will be delivered and monitored.
1.6 The preparation timetable for the Local Plan is detailed in the
Southend Local Development Scheme (LDS). There have been
3 stages of public consultation under regulation 18. The final
draft version of the local plan is now published for comments.
8 | Southend Local Plan • Proposed Submission Draft (Regulation 19)
1. Introduction
1.7 The various stages of Local Plan preparation have drawn upon an
extensive evidence base which is regularly updated. Documents
comprising the evidence base are referenced throughout this
document. The Local Plan is also accompanied by an Integrated
Assessment, comprising Sustainability Appraisal setting out
the impact of the draft strategy and planning policies from
an environmental, social and economic perspective, and an
Infrastructure Delivery Plan detailing infrastructure needs.
1.8 Once adopted the Southend New Local Plan will replace
several current adopted planning policy documents, namely:
● the Southend Core Strategy (2007);
● Development Management Document (DPD 2015);
● Southend Central Area Action Plan (SCAAP 2018); and
● some of the strategic policies within the London Southend Airport
and Environs Joint Area Action Plan (JAAP 2014);
1.9 The Essex and Southend Waste Local Plan (2017), prepared jointly
by Southend and Essex County Council, sets out an approach
to 2032 and will be reviewed in due course separately.
1.10 The current adopted planning policies to be replaced by the
New Local Plan upon adoption are detailed in Appendix 3.
Southend in the wider sub-region
1.11 Southend is a Unitary Authority responsible for all local government
services, unlike many other ‘2-tier’ local authorities that rely on
County Council’s to delivery certain services, including transport,
education and waste. Nevertheless, the Southend new Local
Plan has been prepared in close collaboration with neighbouring
1 www.southessex.org.uk
authorities, including the South Essex Councils and other key
stakeholders to ensure it has regard to its strategic context.
1.12 The future development of Southend needs to be viewed in
the context of growth and development within the South Essex
sub region (Figure 1.1). The councils of Basildon, Brentwood,
Castle Point, Rochford, Southend-on-Sea, Thurrock and Essex
County formed South Essex Councils 1 (SEC) and worked
together to promote prosperity and wellbeing in the region.
1.13 Local Government Re-organisation (LGR) is where the structure
and responsibilities of existing local authorities are reconfigured.
On 25 March 2026 the government selected the proposals
for five new unitary authorities in Greater Essex. As a result,
Southend-on-Sea will be represented by a new South East
Essex unitary authority. This will replace the existing authorities
of Southend-on-Sea, Castle Point, and Rochford, and services
from Essex County Council overing Castle Point and Rochford
will be disaggregated into the new unitary authorities. The
legal status of local plans is not impacted by local government
reorganisation. The Government remains committed to ensuring
delivery of up-to-date Local Plans as quickly as possible and
has stated that strategic planning reform proposals should not
be used as a reason to delay the preparation of local plans.
www.southend.gov.uk | 9
1. Introduction
Figure 1.1: Southend Context within South Essex
10 | Southend Local Plan • Proposed Submission Draft (Regulation 19)
1. Introduction