← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / 1 Introduction

From the plan

1 Introduction

On pages 8 to 10 of the official PDF.

The human version

This section introduces the Southend Local Plan. Southend is a city by the sea at the mouth of the Thames Estuary, some forty miles east of London. Land is limited and the urban area is densely built. The Plan sets out how the city should grow sustainably to 2045, giving new homes and jobs while protecting parks, heritage and the coast. Once adopted it will replace the Core Strategy (2007), the Development Management Document (DPD 2015), the Southend Central Area Action Plan (SCAAP 2018) and some JAAP 2014 policies. A new South East Essex unitary authority is planned, but this does not affect the legal status of local plans.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 8

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

1. Introduction 1.1 Southend is a vibrant city by the sea. It is a major tourist destination and business centre with a growing population. It is a city of enterprise, culture and opportunity. 1.2 The city lies at the eastern most extremity of the south Essex peninsula at the mouth of the Thames Estuary some forty miles east of London. It stretches along a foreshore of around seven miles, which provides an east/ west linear layout. 1.3 With limited land resources and one of the most densely developed urban areas in the country outside London, harnessing the city’s potential for growth and meeting the needs of its resident and business community while addressing the impacts of climate change and technological advances, and having regard to the natural and historic environment, is a major challenge and requires careful planning. 1.4 The Local Plan seeks to meet this challenge by planning for the future sustainable development of the city to 2045, whilst seeking to provide for new homes and jobs and safeguarding the city’s valuable parks and green spaces, distinctive heritage and character, and its sensitive coastal environment. 1.5 It sets out a spatial vision and policies and proposals to address the needs of the city. This is set out under specific themes as follows: ● A CITY BY THE SEA – setting out objectives, spatial strategy and principles; managing the impacts of growth and infrastructure and providing for a new neighbourhood on land north of Southend. ● A CITY THAT IS HEALTHY AND SAFE – enabling healthy lifestyles and wellbeing; ● A CITY OF OPPORTUNITY – the provision and type of new homes and securing a thriving economy; ● A CITY TO BE PROUD OF – urban design, character and heritage; ● A CITY THAT IS GREEN AND SUSTAINABLE – the natural environment, biodiversity and climate change; ● A CITY THAT IS CONNECTED AND SMART – transport and connectivity; ● THE NEIGHBOURHOODS OF SOUTHEND – proposals for the neighbourhoods of Southend; ● A CITY THAT DELIVERS – how the Local Plan will be delivered and monitored. 1.6 The preparation timetable for the Local Plan is detailed in the Southend Local Development Scheme (LDS). There have been 3 stages of public consultation under regulation 18. The final draft version of the local plan is now published for comments. 8 | Southend Local Plan • Proposed Submission Draft (Regulation 19) 1. Introduction 1.7 The various stages of Local Plan preparation have drawn upon an extensive evidence base which is regularly updated. Documents comprising the evidence base are referenced throughout this document. The Local Plan is also accompanied by an Integrated Assessment, comprising Sustainability Appraisal setting out the impact of the draft strategy and planning policies from an environmental, social and economic perspective, and an Infrastructure Delivery Plan detailing infrastructure needs. 1.8 Once adopted the Southend New Local Plan will replace several current adopted planning policy documents, namely: ● the Southend Core Strategy (2007); ● Development Management Document (DPD 2015); ● Southend Central Area Action Plan (SCAAP 2018); and ● some of the strategic policies within the London Southend Airport and Environs Joint Area Action Plan (JAAP 2014); 1.9 The Essex and Southend Waste Local Plan (2017), prepared jointly by Southend and Essex County Council, sets out an approach to 2032 and will be reviewed in due course separately. 1.10 The current adopted planning policies to be replaced by the New Local Plan upon adoption are detailed in Appendix 3. Southend in the wider sub-region 1.11 Southend is a Unitary Authority responsible for all local government services, unlike many other ‘2-tier’ local authorities that rely on County Council’s to delivery certain services, including transport, education and waste. Nevertheless, the Southend new Local Plan has been prepared in close collaboration with neighbouring 1 www.southessex.org.uk authorities, including the South Essex Councils and other key stakeholders to ensure it has regard to its strategic context. 1.12 The future development of Southend needs to be viewed in the context of growth and development within the South Essex sub region (Figure 1.1). The councils of Basildon, Brentwood, Castle Point, Rochford, Southend-on-Sea, Thurrock and Essex County formed South Essex Councils 1 (SEC) and worked together to promote prosperity and wellbeing in the region. 1.13 Local Government Re-organisation (LGR) is where the structure and responsibilities of existing local authorities are reconfigured. On 25 March 2026 the government selected the proposals for five new unitary authorities in Greater Essex. As a result, Southend-on-Sea will be represented by a new South East Essex unitary authority. This will replace the existing authorities of Southend-on-Sea, Castle Point, and Rochford, and services from Essex County Council overing Castle Point and Rochford will be disaggregated into the new unitary authorities. The legal status of local plans is not impacted by local government reorganisation. The Government remains committed to ensuring delivery of up-to-date Local Plans as quickly as possible and has stated that strategic planning reform proposals should not be used as a reason to delay the preparation of local plans. www.southend.gov.uk | 9 1. Introduction Figure 1.1: Southend Context within South Essex 10 | Southend Local Plan • Proposed Submission Draft (Regulation 19) 1. Introduction
Health, schools & communityInfrastructure & utilitiesJobs & economy📍 Castle Point📍 London Southend Airport📍 Rochford📍 Southend📍 Southend-on-Sea
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.