← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / WAT3

Policy WAT3

Surface water and Sustainable Urban Drainage systems

On pages 55 to 56 of the official PDF.

The human version

This policy requires development to include Sustainable Drainage Systems (SuDS) unless they are shown to be inappropriate. Surface water should be managed as close to its source as practical and discharged following the drainage hierarchy. Drainage must not increase flood risk on or off the site, must achieve suitable runoff rates, allow for climate change, handle exceedance flows safely and have long-term maintenance arrangements. Above-ground and nature-based solutions should come first. Major and phased schemes need a coordinated drainage strategy for the whole site. In Groundwater Source Protection Zones, infiltration is only supported where there is no unacceptable risk to groundwater quality.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 55

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy WAT3: Surface water and Sustainable Urban Drainage systems 1. Development must incorporate Sustainable Drainage Systems (SuDS) unless it is demonstrated they would be inappropriate. SuDS must be integrated into the design of development from the earliest stage and designed in accordance with relevant standards and guidance. 2. Surface water must be managed as close to its source as practical and discharged in accordance with the drainage hierarchy. Surface water management 3. Development must demonstrate surface water drainage will: a. Avoid increasing flood risk on or off the site. b. Achieve appropriate runoff rates and volumes having regard to the nature of the site and relevant standards. c. Incorporate appropriate climate change allowances. d. Manage exceedance flows safely. e. Provide appropriate arrangements for its long-term management and maintenance. 4. Drainage proposals should prioritise above-ground and nature-based solutions and where practical, contribute to landscape, biodiversity, green infrastructure and water quality improvements. Delivery and groundwater protection 5. Major and phased development must be supported by a coordinated drainage strategy demonstrating drainage can be delivered across the whole site and will not prejudice the development of later phases. 6. In Groundwater Source Protection Zones and other areas of groundwater sensitivity, particularly environmentally sensitive habitats, infiltration drainage will only be supported where it can be demonstrated there would be no unacceptable risk to groundwater quality. Water resources, water quality and water infrastructure 9.21 Water resources in the wider South East are under significant pressure and the Tandridge District lies in an area of serious water stress. Reducing demand for potable water is an important component of accommodating growth sustainably. The residential water efficiency requirement provides a measurable standard while the wider policy encourages rainwater harvesting, greywater reuse and other demand management measures. The requirement will be kept under review to reflect and identify changes at the local and national level. 9.22 Water efficiency should be considered from the earliest stages of the design process and as part of an integrated approach to water management. Measures such as water-efficient fixtures and appliances, rainwater harvesting, greywater recycling and water reuse can reduce demand on public water supplies and improve resilience to future pressures arising from climate change and population growth. 9.23 Protecting the quality of surface water and groundwater is equally important. Development should avoid creating pathways through which pollutants can enter rivers, streams, ponds, groundwater or other water environments and should incorporate appropriate mitigation where risks are identified. Care will be required where development is proposed in Groundwater Source Protection Zones or other sensitive groundwater environments. 9.24 Opportunities should be taken, where appropriate, to maintain and enhance the natural function of watercourses and the wider water environment. Measures such as habitat enhancement, river restoration and blue-green infrastructure can contribute to improved water quality, ecological resilience and wider environmental benefits. 9.25 Water supply and wastewater infrastructure also represent important considerations for the timing and distribution of growth. Existing evidence identifies local constraints in both the potable-water distribution network and wastewater-treatment system and investment or reinforcement will be required in some catchments to accommodate planned growth. Investment planned by water companies will improve capacity, but the timing of infrastructure provision does not necessarily coincide with the timing of development. 9.26 Development should not proceed on the assumption that infrastructure capacity will automatically become available. Early engagement with the relevant undertaker is required so network reinforcement and treatment requirements can be identified, funded and programmed. Where necessary, development will be phased so that occupation does not take place before essential infrastructure is operational. 9.27 The Water Cycle Study should be reviewed to identify the implications of planned growth for water supply networks, sewerage systems and wastewater treatment works. It assists applicants and decision makers in determining whether sufficient capacity exists to accommodate development, what infrastructure improvements are required and whether development needs to be phased to align with their delivery. 9.28 Applicants should engage with the relevant water and wastewater undertakers at an early stage where infrastructure constraints are known or where additional capacity may be required. This is particularly important for major developments and in locations where capacity limitations have been identified through the Water Cycle Study, Infrastructure Delivery Plan or infrastructure-provider evidence. 9.29 Connection to the public foul sewer network is generally the most sustainable means of wastewater disposal. Where non-mains drainage is proposed, applicants should demonstrate connection to the public sewer is not reasonably practical and that the proposed system would not give rise to unacceptable impacts on human health, groundwater, water quality or the wider environment. 9.30 Surface water should be managed separately from foul drainage wherever practical. Reducing the amount of surface water entering foul and combined sewer networks can help improve network performance, reduce the risk of sewer flooding and minimise pressure on wastewater treatment infrastructure and storm overflows. 9.31 Land may need to be safeguarded for the expansion, reinforcement or operation of water supply and wastewater infrastructure. Development should not prejudice infrastructure identified through the Local Plan, Water Cycle Study, Infrastructure Delivery Plan or confirmed infrastructure-provider investment programmes.
Flooding & waterInfrastructure & utilitiesNature & environment📍 Tandridge
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.