← Open Consultation: all consultations

Three Rivers Plan Explorer

Search the Three Rivers Local Plan. 408 pages in two parts, made findable.

The consultation closes at 11:59pm, Sunday 6 September 2026.

OpenConsult / Buckinghamshire plan / Hunton Bridge

Site allocation

Hunton Bridge

On pages 68 to 71 of the official PDF.

The human version

This section sets out the site allocations for Hunton Bridge. A single housing site is allocated: Land at Mill Place, with an indicative capacity of 10 homes. The site table records its size, phasing and Green Belt status, together with the site-specific requirements and constraints, including access, heritage and flood risk matters, that future proposals must take into account.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 68

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HUNTON BRIDGE H33 – Land at Mill Place H33 – Land at Mill Place, Watford Road SHELAA Reference: NSS10 Size: 0.6ha Proposed use(s): Residential Indicative Dwelling Capacity: 10 Phasing: 0 – 5 years Greenfield/Brownfield: Brownfield Green Belt / Grey Belt: The site is considered to be grey belt. Given that the site is not edge of settlement, its brownfield nature and grey belt categorisation, the site has been retained in the Green Belt Main Development Requirements: • Indicative dwelling capacity of 10 • A 10-metre buffer area is required between development and the River Gade to the east of the site Site Constraints and Other Requirements and Considerations: Access, Highways and Sustainable Transport • There are two existing accesses into the site from the A41. Engagement with HCC Highways at the earliest stage is strongly encouraged. An Access Strategy and Transport Assessment would likely be needed at a planning application (and preferably pre-application) stage Flooding • The Site is adjacent to a Main River (River Gade/Grand Union Canal) which is classified as Flood Zone 3b. A 10-metre buffer would be required between residential development and the river • There is a risk of groundwater flooding due to the shallow ground water level. Development would be subject to appropriate mitigation measures to address the risk of groundwater flooding • The council’s Level 2 SFRA (2026) has concluded that development should be steered away from the areas of highest surface water flood risk in the 100 year plus climate change flooding event. A Flood Risk Assessment (FRA) must be submitted at the planning a pplication (and preferably pre-application) stage • The site falls within the Groundwater Source Protection Zone 1 (GPSZ1) which may limit the use of SuDS, deep foundations and below ground development. A preliminary risk assessment is required at the planning application (and preferably pre -application) stage to determine whether there is contamination, and whether remediation works would be needed Historic Environment • There are Grade II Listed Buildings close to the northern and southern boundaries of the site (Bridge over the Grand Union Canal to the south and North Grove Lock House to the north). The council’s high-level Heritage Impact Assessment states that the site’s development would have a minor adverse impact on the historic environment although sets out that it is likely that the impact could be mitigated through good design including appropriate scale, massing and positioning of development, which may include s etbacks of housing from the canal and use of appropriate landscaping boundary treatments • A Heritage Impact Assessment/ Heritage Statement should be submitted at the planning application (and preferably pre -application) stage , including details of mitigation measures to reduce the impact on nearby heritage assets Landscape • The council’s Landscape Sensitivity Assessment classified the site as medium-high sensitivity to built development. It is also classified that the site as having a high sensitivity to the historic character. As such, the submission of a Landscape and Visual Impact Assessment should be submitted at the planning application (and preferably pre-application) stage Green Infrastructure, Biodiversity and TPOs • HCC Ecology state that illuminating waterways and riparian margins should be avoided. • A Local Wildlife Site is located adjacent to the east of the site. Given the close proximity to the Local Wildlife Site, an Ecological Impact Assessment will be required at the planning application (and preferably pre-application) stage Environmental Health and Pollution • Noise and air quality issues caused by the site’s proximity to the A41 may have an impact on the site and its future occupiers and as such noise reduction measures should be considered as part of the design. Relevant assessments and reports, including details of mitigation measures would be required at the planning application (and preferably pre-application) stage. Mineral and Waste • A Site Waste Management Plan (SWMP) will be required to support any proposal at the planning application stage. • The site is located on an area of Historic Landfill (reference: EAHLD12879). The presence of and risk from contaminative materials should be considered at the earliest stage. The submission of a Land Contaminati
Flooding & waterHeritage & characterTransport & travel📍 Hunton Bridge📍 Watford
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →

Deadline: 11:59pm, Friday 25 September 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.