The human version (we wrote this, not the council)This section introduces the Northampton chapter. Northampton is the largest urban area in West Northamptonshire, with a population of 245,899 in 2021. Eight Sustainable Urban Extensions allocated in the WNJCS could deliver around 11,946 homes in the plan period. With new allocations, Northampton could deliver up to just over 26,000 homes on allocated sites and sites with permission. The section describes the Enterprise Zone, designated in 2011, which has created over 6,000 net new jobs. It also covers the town centre, where vacancy rose from 12.7% in 2015 to 13.9% in 2019, and tourism and leisure.
Grange Park
8 sections of the plan, in document order.
The human version (we wrote this, not the council)This policy supports the University of Northampton at its Waterside Campus. The site is safeguarded for education and ancillary uses, and development should improve links with the wider Central Area. The Council will continue to support student accommodation and related uses. Proposals should respond to the riverside setting and green and blue infrastructure, and address flood risk, drainage and utility constraints. A site-specific Flood Risk Assessment is needed, meeting the Upper Nene design standard of a 0.5% probability event plus climate change allowance. Access for maintaining foul drainage infrastructure must be safeguarded.
The human version (we wrote this, not the council)This policy allocates land in Northampton for residential and residential-led development. A table lists 25 sites with indicative capacities, which depend on compliance with other policies. The largest are Land west of A43 at 2,900 homes, Land east of A43 at 1,950, Land East of Wooldale Road at 1,700, North of Buckton Fields at 1,500, and Greyfriars at 1,000. Land North of Newport Pagnell Road is also 1,000. Some sites are re-allocated from the Northampton Part 2 Local Plan or the Joint Core Strategy. Some have more detailed site policies.
The human version (we wrote this, not the council)This site allocation covers The Green, Great Houghton in Northampton. Residential development of about 650 dwellings will be supported, subject to criteria. Two years of overwintering bird surveys are needed before submission, and impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed. Design must respect the Great Houghton Conservation Area, with a Heritage Impact Assessment. The main access should be from The Green west of Saucebridge Farm, limiting extra traffic towards Great Houghton village and Bedford Road. Proposals need air quality and noise assessments, an archaeological assessment, and a landscape vision protecting views of the Grade II* listed church.
The human version (we wrote this, not the council)This site allocation covers land south of Grange Park in Northampton, allocated for residential development. A masterplan agreed by the Council is required. Proposals must provide approximately 850 dwellings, open space, sports and education provision, and a sustainable transport network. They must also provide structural greenspace and wildlife corridors, and address impacts on the Upper Nene Valley Gravel Pits Special Protection Area. Healthcare and transport contributions are required. Heritage and landscape assessments must show that the rural setting of nearby historic villages is preserved, separation between settlements is maintained, and coalescence is avoided. TPO trees, hedgerows and the stream corridor must be kept.
The human version (we wrote this, not the council)This site allocation covers Horizon House, St Peter's Way in Northampton. Proposals to bring Horizon House back into office use, including extensions, are supported, with around 25,000 sq. m of commercial floorspace. Offices should be modern and include shared workspaces. Refurbishment must be sensitive to its heritage status as the former Corporation Gas Works offices and to nearby assets, including St Peter's Church, a Grade I listed building. Proposals must minimise inactive frontages, provide accessible greenspace, integrate the River Nene, improve walking, cycling and riverside safety, and contribute to transport mitigation. A flood risk assessment is needed.
The human version (we wrote this, not the council)This policy sets the housing requirement for West Northamptonshire for the plan period 2026 to 2043 at 42,704 homes. The plan will also provide an additional 5% to ensure choice and competition in the market for land. These homes will be delivered through allocations made in this Plan, other policies in this Plan that provide for new homes, existing commitments, and allocations in Neighbourhood Development Plans.
The human version (we wrote this, not the council)This section is the housing trajectory, a set of tables showing expected new homes in each year from 2026/27 to 2042/43. The requirement is 2,512 homes a year, 42,704 in total, or 2,638 a year with the 5% buffer. Total expected supply over the plan period is 44,779 homes, against a cumulative requirement with the buffer of 44,839, a shortfall of 60 by the end of the period. Supply falls short in the early and late years and exceeds the requirement in the middle years. Further tables break the supply down by site for each area, starting with Northampton.