← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull plan / Hampton in Arden

From the plan

Hampton in Arden

On pages 133 to 135 of the official PDF.

The human version

This section describes the parish of Hampton in Arden, which includes the villages of Hampton-in-Arden and Catherine-de-Barnes, divided by the M42. The area lies in the Green Belt known as the Meriden Gap. The villages share a primary school, library, doctor’s surgery and shops, and Hampton-in-Arden has a station on the West Coast Mainline. Because services are limited, growth should be kept to proportionate extensions so the school is not overwhelmed. Needs include better walking and cycling links, green space and health provision. A resolution to grant up to 95 dwellings at Land at Oak Farm was taken in May 2023, and 96 dwellings off Meriden Road are under construction.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 133

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Hampton in Arden The Settlement Now 586. The parish area includes the rural settlements of Hampton-in-Arden and Catherine-de- Barnes, both of which are small villages east of Solihull, which are located in close proximity to major transport links joining Birmingham with Coventry. The settlements are divided by the M42 motorway and are broadly bounded by the A45 and A452 trunk roads to the north, by the River Blythe to the east and south and by th e Grand Union Canal, Hampton Coppice and the A41 to the west 587. The settlements are situated within the largely pastoral and historic Arden Landscape. This area of Green Belt which separates the wider Birmingham conurbation from Coventry Belt, is known as the ‘Meriden Gap. 588. The central part of Hampton-in-A r d e n w a s fi r s t d e s i g n a t e d a s a C o n s e r v a t i o n A r e a b y Warwickshire County Council in order to preserve the historic core of the settlement. In 2015, Solihull MBC completed a review of the Conservation Area and expanded its boundaries to include other notable parts of Hampton-in-Arden. 589. A neighbourhood plan for the parish was adopted in August 2017. 590. The parish currently covers the village itself and associated hinterland, and by virtue of boundary changes that took effect in April 2019, the parish boundary was extended westwards up to the urban edge and all of Catherine-de-Barnes is now included in the parish. 591. The village of Hampton-in-Arden is located to the eastern side of the Parish whilst the smaller settlement of Catherine -de-Barnes is located to the western side. Between them, the settlements have a range of facilities including a primary school, a library, doctor’s surgery and a number of shops including a post office and chemist together with recreational facilities. 592. Hampton-in-Arden has a railway station on the West Coast Mainline which provides access to London, Birmingham and Coventry. The station has a car park accommodating some 72 vehicles. A bus service runs through the village which connects Hampton-in-Arden to Meriden, Catherine-de-Barnes and Solihull The Settlement in the Future 593. Given the limited range of services, it is considered that development options are restricted to what would be proportionate extensions to the settlement. A key aspect to this is to ensure that the existing infrastructure supporting the village, especially the school, is not overwhelmed from additional demands that may occur from larger expansions. 594. The M42, which separates Hampton-in-Arden and Catherine-de-Barnes, will continue to provide an important part of the strategic highway network. The ongoing improvements to Junction 6 of the M42 include a new road linking the motorway to the A45 via a new junction (junction 5a) located where Solihull Road currently crosses the motorway. The new road (A4545) was fully opened in June 2025. 595. The HS2 line will run through the parish. To accommodate the crossing of the River Blythe (and i t s fl o o d p l a i n ) , a v i a d u c t o f s o m e 4 8 0 m i n l e n g t h a n d o v e r 1 0 m a b o v e g r o u n d l e v e l w i l l b e constructed. What is Required for the Settlements in the Future? 596. The parish area of Hampton in Arden will require protection from excessive development that may impact upon the character and attractiveness of the village; and the services it provides. Where development is provided, the following issues will need to be addressed. 597. Community Infrastructure Levy – Presently, the parish council will directly receive 25% of the levy for developments occurring in the parts of the parish covered by the Neighbourhood Plan. Elsewhere, principally around Catherine-de-Barnes (which was a later addition to the parish), 15% of the levy will be passed onto the Parish Council. This will provide a significant source of funding that can be used to take forward appropriate projects that the community have identified as priorities. This can include simple, relatively low-cost actions (e.g. further traffic regulation orders) throug h to more substantial projects. It will be for the parish council to decide how this ‘local’ element of the CIL receipts is to be spent and there is potential for partnership working to maximise the use of monies from this source. 598. Pedestrian and Cycling Connectivity – Enhancements to encourage and promote walking and cycling in the settlement, particularly towards the local centre, schools and public transport will be required. Developments will be expected to ensure that walking and cycling connectivity is provided both within and beyond the site boundary, linking in with the existing and proposed cycle and walking networks identified in the Council’s Cycling and Walking Strategy, as well as routes for recreation. 599. Green Space Improvements – In accordance with the NPPF and the ‘golden rules’ , opportunities for the provision and improvement of local green space that is accessible and of high quality will be maximised. 600. Health provision – The Council is working with the BSOL ICB to establish the impact of new development on local GPs and other services, and how this can be addressed. 601. Other necessary improvements to local infrastructure - Where development generates a need for new or improved infrastructure, developers will be expected to deliver such improvements to ensure that growth does not place unacceptable pressure on existing infrastructure networks and services and contributes to the creation of sustainable, well- served communities. Recent Planning Applications 602. A number of recent planning applications need to be highlighted as they are relevant to how the area will develop in the future, and they will have implications for determining what an appropriate amended boundary to the Green Belt ought to be. The proposals include the following: 603. A resolution to grant outline planning permission for residential development on Land at Oak Farm was taken in May 2023 for up to 95 dwellings with associated infrastructure and open space. This site was an allocation in the 2020 plan known as HA2 Oak Farm, Catherine de Barnes. Existing Allocation SLP Site 24 – Land off Meriden Road, Hampton-in-Arden 604. The adopted Solihull Local Plan (2013) allocated this site off Meriden Road for development of approximately 110 dwellings. Planning permission was granted for 96 dwellings which is currently under construction. Proposed Allocations
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Catherine-de-Barnes📍 Hampton in Arden📍 Meriden📍 Solihull
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.