This section describes the parish of Hampton in Arden, which includes the villages of Hampton-in-Arden and Catherine-de-Barnes, divided by the M42. The area lies in the Green Belt known as the Meriden Gap. The villages share a primary school, library, doctor’s surgery and shops, and Hampton-in-Arden has a station on the West Coast Mainline. Because services are limited, growth should be kept to proportionate extensions so the school is not overwhelmed. Needs include better walking and cycling links, green space and health provision. A resolution to grant up to 95 dwellings at Land at Oak Farm was taken in May 2023, and 96 dwellings off Meriden Road are under construction.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Hampton in Arden
The Settlement Now
586. The parish area includes the rural settlements of Hampton-in-Arden and Catherine-de-
Barnes, both of which are small villages east of Solihull, which are located in close proximity
to major transport links joining Birmingham with Coventry. The settlements are divided by the
M42 motorway and are broadly bounded by the A45 and A452 trunk roads to the north, by the
River Blythe to the east and south and by th e Grand Union Canal, Hampton Coppice and the
A41 to the west
587. The settlements are situated within the largely pastoral and historic Arden Landscape. This
area of Green Belt which separates the wider Birmingham conurbation from Coventry Belt, is
known as the ‘Meriden Gap.
588. The central part of Hampton-in-A r d e n w a s fi r s t d e s i g n a t e d a s a C o n s e r v a t i o n A r e a b y
Warwickshire County Council in order to preserve the historic core of the settlement. In 2015,
Solihull MBC completed a review of the Conservation Area and expanded its boundaries to
include other notable parts of Hampton-in-Arden.
589. A neighbourhood plan for the parish was adopted in August 2017.
590. The parish currently covers the village itself and associated hinterland, and by virtue of
boundary changes that took effect in April 2019, the parish boundary was extended westwards
up to the urban edge and all of Catherine-de-Barnes is now included in the parish.
591. The village of Hampton-in-Arden is located to the eastern side of the Parish whilst the smaller
settlement of Catherine -de-Barnes is located to the western side. Between them, the
settlements have a range of facilities including a primary school, a library, doctor’s surgery and
a number of shops including a post office and chemist together with recreational facilities.
592. Hampton-in-Arden has a railway station on the West Coast Mainline which provides access to
London, Birmingham and Coventry. The station has a car park accommodating some 72
vehicles. A bus service runs through the village which connects Hampton-in-Arden to Meriden,
Catherine-de-Barnes and Solihull
The Settlement in the Future
593. Given the limited range of services, it is considered that development options are restricted to
what would be proportionate extensions to the settlement. A key aspect to this is to ensure
that the existing infrastructure supporting the village, especially the school, is not
overwhelmed from additional demands that may occur from larger expansions.
594. The M42, which separates Hampton-in-Arden and Catherine-de-Barnes, will continue to
provide an important part of the strategic highway network. The ongoing improvements to
Junction 6 of the M42 include a new road linking the motorway to the A45 via a new junction
(junction 5a) located where Solihull Road currently crosses the motorway. The new road
(A4545) was fully opened in June 2025.
595. The HS2 line will run through the parish. To accommodate the crossing of the River Blythe (and
i t s fl o o d p l a i n ) , a v i a d u c t o f s o m e 4 8 0 m i n l e n g t h a n d o v e r 1 0 m a b o v e g r o u n d l e v e l w i l l b e
constructed.
What is Required for the Settlements in the Future?
596. The parish area of Hampton in Arden will require protection from excessive development that
may impact upon the character and attractiveness of the village; and the services it provides.
Where development is provided, the following issues will need to be addressed.
597. Community Infrastructure Levy – Presently, the parish council will directly receive 25% of the
levy for developments occurring in the parts of the parish covered by the Neighbourhood Plan.
Elsewhere, principally around Catherine-de-Barnes (which was a later addition to the parish),
15% of the levy will be passed onto the Parish Council. This will provide a significant source of
funding that can be used to take forward appropriate projects that the community have
identified as priorities. This can include simple, relatively low-cost actions (e.g. further traffic
regulation orders) throug h to more substantial projects. It will be for the parish council to
decide how this ‘local’ element of the CIL receipts is to be spent and there is potential for
partnership working to maximise the use of monies from this source.
598. Pedestrian and Cycling Connectivity – Enhancements to encourage and promote walking
and cycling in the settlement, particularly towards the local centre, schools and public
transport will be required. Developments will be expected to ensure that walking and cycling
connectivity is provided both within and beyond the site boundary, linking in with the existing
and proposed cycle and walking networks identified in the Council’s Cycling and Walking
Strategy, as well as routes for recreation.
599. Green Space Improvements – In accordance with the NPPF and the ‘golden rules’ ,
opportunities for the provision and improvement of local green space that is accessible and of
high quality will be maximised.
600. Health provision – The Council is working with the BSOL ICB to establish the impact of new
development on local GPs and other services, and how this can be addressed.
601. Other necessary improvements to local infrastructure - Where development generates a
need for new or improved infrastructure, developers will be expected to deliver such
improvements to ensure that growth does not place unacceptable pressure on existing
infrastructure networks and services and contributes to the creation of sustainable, well-
served communities.
Recent Planning Applications
602. A number of recent planning applications need to be highlighted as they are relevant to how
the area will develop in the future, and they will have implications for determining what an
appropriate amended boundary to the Green Belt ought to be. The proposals include the
following:
603. A resolution to grant outline planning permission for residential development on Land at Oak
Farm was taken in May 2023 for up to 95 dwellings with associated infrastructure and open
space. This site was an allocation in the 2020 plan known as HA2 Oak Farm, Catherine de
Barnes.
Existing Allocation
SLP Site 24 – Land off Meriden Road, Hampton-in-Arden
604. The adopted Solihull Local Plan (2013) allocated this site off Meriden Road for development of
approximately 110 dwellings. Planning permission was granted for 96 dwellings which is
currently under construction.
Proposed Allocations